Image from Google Jackets

Comparative assessment for progressive collapse resistance of structures between Special Moment Resisting Frame (SMRF) and dual system (Soft copy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2019Description: ii,10,xiv,80pDDC classification:
  • SD TH-0258 KHA
Contents:
CONTENTS Undertaking i Certificate iii Acknowledgement v Abstract vii Table of Contents ix List of tables xii List of Figures xii List of Graphs xiii 1. Introduction 1 1.1. Overview 1 1.2. History 1 1.3. Objective and Scope of Work 3 2. Literature Review 4 2.1.1. Design Philosophy 4 2.1.2. Design Methodology 4 2.2. Ductile Detailing 7 2.2.1. Material specifications 8 2.2.2. Beams 8 2.2.3. Columns 10 2.3. Guideline for Progressive Collapse Resistance of Structures 11 2.3.1. Design Approach 11 2.3.2. Design Requirement 11 2.3.3. Design Procedures 12 3. Methodology 21 3.1. Introduction 21 3.2. Details of Hypothetical Case Study 21 3.2.1. Loads and Load Combinations 24 3.2.2. Time Period and Base Shear 25 3.3. Design of Hypothetical Cases 26 3.4. Progressive Collapse Analysis 27 3.5. Details of Real Case Study 30 4. Results and Discussion 32 4.1. Case 1: G+10 - SMRF System - Zone III 32 4.1.1. Column Removal Location - Ground Floor 32 4.1.2. Column Removal Location - 5th Floor 34 4.1.3. Column Removal Location - 10th Floor 36 4.2. Case 2: G+10 - Dual System - Zone III 39 4.2.1. Column Removal Location - Ground Floor 39 4.2.2. Column Removal Location - 5th Floor 41 4.2.3. Column Removal Location - 10th Floor 43 4.3. Case 3: G+10 - SMRF System - Zone IV 46 4.3.1. Column Removal Location - Ground Floor 46 4.3.2. Column Removal Location - 5th Floor 48 4.3.3. Column Removal Location - 10th Floor 50 4.4. Case 4: G+10 - Dual System - Zone IV 53 4.4.1. Column Removal Location - Ground Floor 53 4.4.2. Column Removal Location - 5th Floor 55 4.4.3. Column Removal Location - 10th Floor 57 4.5. Comparative Assessment 60 4.5.1. : Zone Wise Comparison 60 4.5.2. : System Wise Comparison 63 4.6. Real Case: G+5 - SMRF System - Zone III 66 4.6.1. Column Removal Location - Ground Floor 66 4.6.2. Column Removal Location - 5th Floor 68 5. Conclusion 70 Bibliography 71 Annexure A: Calculation of Moment of Resistance 72 Annexure B: Example for Calculation of Member Capacities and DCRs 77 Annexure C: Comparison of DCRs of Beam when Detailed using IS13920:2016 and IS456:2000 79
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Processing Center Faculty of Technology SD TH-0258 KHA Not for loan 021597
Total holds: 0

CONTENTS
Undertaking i
Certificate iii
Acknowledgement v
Abstract vii
Table of Contents ix
List of tables xii
List of Figures xii
List of Graphs xiii
1. Introduction 1
1.1. Overview 1
1.2. History 1
1.3. Objective and Scope of Work 3
2. Literature Review 4
2.1.1. Design Philosophy 4
2.1.2. Design Methodology 4
2.2. Ductile Detailing 7
2.2.1. Material specifications 8
2.2.2. Beams 8
2.2.3. Columns 10
2.3. Guideline for Progressive Collapse Resistance of Structures 11
2.3.1. Design Approach 11
2.3.2. Design Requirement 11
2.3.3. Design Procedures 12
3. Methodology 21
3.1. Introduction 21
3.2. Details of Hypothetical Case Study 21
3.2.1. Loads and Load Combinations 24
3.2.2. Time Period and Base Shear 25
3.3. Design of Hypothetical Cases 26
3.4. Progressive Collapse Analysis 27
3.5. Details of Real Case Study 30
4. Results and Discussion 32
4.1. Case 1: G+10 - SMRF System - Zone III 32
4.1.1. Column Removal Location - Ground Floor 32
4.1.2. Column Removal Location - 5th Floor 34
4.1.3. Column Removal Location - 10th Floor 36
4.2. Case 2: G+10 - Dual System - Zone III 39
4.2.1. Column Removal Location - Ground Floor 39
4.2.2. Column Removal Location - 5th Floor 41
4.2.3. Column Removal Location - 10th Floor 43
4.3. Case 3: G+10 - SMRF System - Zone IV 46
4.3.1. Column Removal Location - Ground Floor 46
4.3.2. Column Removal Location - 5th Floor 48
4.3.3. Column Removal Location - 10th Floor 50
4.4. Case 4: G+10 - Dual System - Zone IV 53
4.4.1. Column Removal Location - Ground Floor 53
4.4.2. Column Removal Location - 5th Floor 55
4.4.3. Column Removal Location - 10th Floor 57
4.5. Comparative Assessment 60
4.5.1. : Zone Wise Comparison 60
4.5.2. : System Wise Comparison 63
4.6. Real Case: G+5 - SMRF System - Zone III 66
4.6.1. Column Removal Location - Ground Floor 66
4.6.2. Column Removal Location - 5th Floor 68
5. Conclusion 70
Bibliography 71
Annexure A: Calculation of Moment of Resistance 72
Annexure B: Example for Calculation of Member Capacities and DCRs 77
Annexure C: Comparison of DCRs of Beam when Detailed using IS13920:2016 and IS456:2000 79

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials