Image from Google Jackets

Challenges and opportunities to adoption of BIM and lean practices in commercial projects - Ahmedabad (Soft copy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2019Description: ii,xix,122pDDC classification:
  • CPM TH-0335 LOT
Contents:
CONTENTS ABSTRACT i UNDERTAKING v CERTIFICATE vii CERTIFICATE OF PARTICIPATION ix ACKNOWLEDGEMENTS xi ABBREVIATIONS xiii CHAPTER-1: INTRODUCTION 1 1.1 Conceptual Overview 2 1.2 Need for the Study 12 1.3 Objectives & Scope of Work 14 1.4 Research Contribution 16 1.5 Research Impact 17 1.6 Research Timeline 18 CHAPTER - 2: LITERATURE REVIEW 19 2.1 Description of Literature Reviewed 20 CHAPTER - 3: RESEARCH METHODOLOGY 39 3.1 Steps in Action Research 40 3.2 Stepwise description of Research Methodology 45 CHAPTER - 4: DIAGNOSING 47 4.1 Semi-structured Interviews 47 4.2 Critical Points Highlighted 49 4.3 Summary of Challenges and Opportunities 51 CHAPTER - 5: ACTION PLANNING 53 5.1 Implementation Phase - I: Project Brown 53 5.2 Implementation Phase - II: Project Green 55 CHAPTER - 6: ACTION TAKING 57 6.1 Implementation Phase - I: Project Brown 58 6.2 Implementation Phase - II: Project Green 64 CHAPTER - 7: EVALUATION 77 7.1 Implementation Phase - I: Project Brown 77 7.2 Implementation Phase - II: Project Green 80 8. CHAPTER - 8: SPECIFYING LEARNING 85 8.1 4D BIM Adoption Framework 85 8.2 Reinforcing the BIM Adoption Strategy 86 8.3 BIM and Lean Interaction Matrix 87 8.4 Mapping the Observations to Literature 89 CONCLUSION 91 FUTURE SCOPE 93 REFERENCES 95 APPENDIX 99 Appendix - I 101 Appendix - II 102 Appendix - III 111 Appendix - IV 114 Appendix - V 116 Appendix - VI 118 Appendix - VII 120 Appendix - VIII 121 Appendix - IX 122
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology CPM TH-0335 LOT Not for loan 021374
Total holds: 0

CONTENTS
ABSTRACT i
UNDERTAKING v
CERTIFICATE vii
CERTIFICATE OF PARTICIPATION ix
ACKNOWLEDGEMENTS xi
ABBREVIATIONS xiii
CHAPTER-1: INTRODUCTION 1
1.1 Conceptual Overview 2
1.2 Need for the Study 12
1.3 Objectives & Scope of Work 14
1.4 Research Contribution 16
1.5 Research Impact 17
1.6 Research Timeline 18
CHAPTER - 2: LITERATURE REVIEW 19
2.1 Description of Literature Reviewed 20
CHAPTER - 3: RESEARCH METHODOLOGY 39
3.1 Steps in Action Research 40
3.2 Stepwise description of Research Methodology 45
CHAPTER - 4: DIAGNOSING 47
4.1 Semi-structured Interviews 47
4.2 Critical Points Highlighted 49
4.3 Summary of Challenges and Opportunities 51
CHAPTER - 5: ACTION PLANNING 53
5.1 Implementation Phase - I: Project Brown 53
5.2 Implementation Phase - II: Project Green 55
CHAPTER - 6: ACTION TAKING 57
6.1 Implementation Phase - I: Project Brown 58
6.2 Implementation Phase - II: Project Green 64
CHAPTER - 7: EVALUATION 77
7.1 Implementation Phase - I: Project Brown 77
7.2 Implementation Phase - II: Project Green 80
8. CHAPTER - 8: SPECIFYING LEARNING 85
8.1 4D BIM Adoption Framework 85
8.2 Reinforcing the BIM Adoption Strategy 86
8.3 BIM and Lean Interaction Matrix 87
8.4 Mapping the Observations to Literature 89
CONCLUSION 91
FUTURE SCOPE 93
REFERENCES 95
APPENDIX 99
Appendix - I 101
Appendix - II 102
Appendix - III 111
Appendix - IV 114
Appendix - V 116
Appendix - VI 118
Appendix - VII 120
Appendix - VIII 121
Appendix - IX 122

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials