Image from Google Jackets

GPS- as a lean construction tool (Softcopy is also available)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: iii,67pDDC classification:
  • CPM TH-0320 KUK
Contents:
Table of contents Undertaking 1 Certificate 2 Disclaimer 3 Acknowledgement 1 Abstract 2 List of figures 3 List of tables 4 1.Thesis type 5 2.Introduction 5 3.Objective 6 4.Hypothesis 6 5.Scope of study 6 6.Methodology 7 7.A bout global positioning system – GPS 8 7.1 Uses of GPS in construction industry 9 8.Literature review 10 9. Analytical framework 24 9.1 Research gap 24 9.2 Methodology timeline 24 9.3 Methodology followed 25 10. Site information 44 10.1 Site details 44 10.2 Concreting details 45 10.3 Micro schedule of 12 day cycle of concreting 47 10.4 Total concreting for each day of the 12 day cycle 51 11.Cost of setting up a GPS system 52 12.Fuel consumption 53 12.Expected outcome 55 13.Conclusion 55 14.Future scope 56 15.References 57 Annexure/appendix 58
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology CPM TH-0320 KUK Not for loan 020002
Total holds: 0

Table of contents
Undertaking 1
Certificate 2
Disclaimer 3
Acknowledgement 1
Abstract 2
List of figures 3
List of tables 4
1.Thesis type 5
2.Introduction 5
3.Objective 6
4.Hypothesis 6
5.Scope of study 6
6.Methodology 7
7.A bout global positioning system – GPS 8
7.1 Uses of GPS in construction industry 9
8.Literature review 10
9. Analytical framework 24
9.1 Research gap 24
9.2 Methodology timeline 24
9.3 Methodology followed 25
10. Site information 44
10.1 Site details 44
10.2 Concreting details 45
10.3 Micro schedule of 12 day cycle of concreting 47
10.4 Total concreting for each day of the 12 day cycle 51
11.Cost of setting up a GPS system 52
12.Fuel consumption 53
12.Expected outcome 55
13.Conclusion 55
14.Future scope 56
15.References 57
Annexure/appendix 58

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials