Image from Google Jackets

Comparative analysis of PPP projects in terms of effective operation (Also available on CD)

By: Contributor(s): Material type: TextTextPublication details: 2018Description: iii,5,ii,5,45p.,CD-ROMDDC classification:
  • B TH-0732 FAD
Contents:
CONTENTS 1 Introduction 4 1.1 Background 4 1.2 Need for Study 4 1.3 Objectives of Study 5 1.4 Scope of Study 5 1.5 Research Methodology 5 1.6 Research Schedule 6 1.7 Limitations of Study 6 2 Literature Review 7 2.1 Scope of Literature Review 7 2.2 Understanding Public-Private PArtnership (PPP) 7 2.3 Types of PPP Projects 7 2.4 PPP Scenario in India 9 2.5 National PPP Policy 11 2.6 Key Performance Indicators (KPI) for Project Success 12 3 Data Collection 14 3.1 Overview 14 3.2 Selection of Case Studies 14 3.3 Data Collection Methodology 15 3.3.1 Primary Data 15 3.3.2 Secondary Data 17 3.4 Case Study Data 17 3.4.1 Case Study 1: Tuna Terminal, Kandla Port 17 3.4.2 Case Study 2: Jetpur-Somnath Highway 21 3.4.3 Case Study 3: Pirana Sewage Treatment Plant 25 3.5 Summary of Case Studies 28 4 Data Analysis 30 4.1 Relative Important Index (RII) 30 4.2 Weighted Ratings & Success Rate 32 4.3 Principal Component Analysis 35 5 Conclusion 38 6 Recommendations 39 7 Future Scope of Study 39 8 Bibliography 40 9 Annexures 42 9.1 Annexure 1: Questionnaire Survey Form 42 9.2 Annexure 2: Survey Respondents 45
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology B TH-0732 FAD Not for loan 019789
Total holds: 0

CONTENTS
1 Introduction 4
1.1 Background 4
1.2 Need for Study 4
1.3 Objectives of Study 5
1.4 Scope of Study 5
1.5 Research Methodology 5
1.6 Research Schedule 6
1.7 Limitations of Study 6
2 Literature Review 7
2.1 Scope of Literature Review 7
2.2 Understanding Public-Private PArtnership (PPP) 7
2.3 Types of PPP Projects 7
2.4 PPP Scenario in India 9
2.5 National PPP Policy 11
2.6 Key Performance Indicators (KPI) for Project Success 12
3 Data Collection 14
3.1 Overview 14
3.2 Selection of Case Studies 14
3.3 Data Collection Methodology 15
3.3.1 Primary Data 15
3.3.2 Secondary Data 17
3.4 Case Study Data 17
3.4.1 Case Study 1: Tuna Terminal, Kandla Port 17
3.4.2 Case Study 2: Jetpur-Somnath Highway 21
3.4.3 Case Study 3: Pirana Sewage Treatment Plant 25
3.5 Summary of Case Studies 28
4 Data Analysis 30
4.1 Relative Important Index (RII) 30
4.2 Weighted Ratings & Success Rate 32
4.3 Principal Component Analysis 35
5 Conclusion 38
6 Recommendations 39
7 Future Scope of Study 39
8 Bibliography 40
9 Annexures 42
9.1 Annexure 1: Questionnaire Survey Form 42
9.2 Annexure 2: Survey Respondents 45


There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials