Study of contract conditions leading to time and cost overruns in construction projects (Also available on CD)
Material type: TextPublication details: 2016Description: vii,41p. CD-ROMDDC classification:- B TH-0649 SHA
Contents:
CONTENTS_x000D_ 1. Introduction 1_x000D_ 1.1 Background 1_x000D_ 1.2 Need Of Study 1_x000D_ 1.3 Objectives Of Study 1_x000D_ 1.4 Scope Of Study…_x000D_ 1.5 Overview Of Study Approach. 2_x000D_ 1.6 Research Methodology. 2_x000D_ 1.6.1 Research Design.
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | B TH-0649 SHA | Not for loan | 016579 |
Total holds: 0
CONTENTS_x000D_ 1. Introduction 1_x000D_ 1.1 Background 1_x000D_ 1.2 Need Of Study 1_x000D_ 1.3 Objectives Of Study 1_x000D_ 1.4 Scope Of Study…_x000D_ 1.5 Overview Of Study Approach. 2_x000D_ 1.6 Research Methodology. 2_x000D_ 1.6.1 Research Design.
There are no comments on this title.
Log in to your account to post a comment.