Construction equipment productivity and optimization methods (Also available on CD)
Material type: TextPublication details: 2016Description: 33,9,p. CD-ROMDDC classification:- B TH-0642 RAN
Contents:
CONTENTS_x000D_ 1. INTRODUCTION 1 _x000D_ 1.1 Overview 1 _x000D_ 1.2 Road infrastructure in India . 1 _x000D_ 1.3 Need of study . 2 _x000D_ 1.4 Objective 3 _x000D_ 1.5 Scope of work . 3 _x000D_ 1.6 Methodology 3 _x000D_ 1.7 Work schedule 4 _x000D_ 1.
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Technology | B TH-0642 RAN | Not for loan | 016572 |
Total holds: 0
CONTENTS_x000D_ 1. INTRODUCTION 1 _x000D_ 1.1 Overview 1 _x000D_ 1.2 Road infrastructure in India . 1 _x000D_ 1.3 Need of study . 2 _x000D_ 1.4 Objective 3 _x000D_ 1.5 Scope of work . 3 _x000D_ 1.6 Methodology 3 _x000D_ 1.7 Work schedule 4 _x000D_ 1.
There are no comments on this title.
Log in to your account to post a comment.