Image from Google Jackets

Public participation in T. P. scheme of Dahej PCPIR (Also available on CD)

By: Contributor(s): Material type: TextTextPublication details: 2014Description: ix,80p.,CD-ROMDDC classification:
  • P TH-1677 DIY
Contents:
CONTENTS Chapter- 1 0 Introduction 0 1.1 background 1 1.2 need of the study 3 1.3 aim 4 1.4 research questions 4 1.5 objectives 4 1.6 methodology 4 1.5 scope and limitations 6 1.6 scheme of chapterization 6 Chapter- 2 8 Literature review 8 2.1 industrialization in gujarat 9 2.1.1 industrial incentives in gujarat 11 2.1.3 dmic, dahej and industrial development 13 2.2 introduction of physical planning in gujarat and mechanism of tps 16 2.2.1 urban land management tools 18 2.2.2 current scenario of gujarat 21 2.2.3 comprehensive urban planning process 25 2.3 town planning schemes according to planning fathers 29 Chapter: 3 31 Tps as a public participatory process 31 3.1 public participation and its importance 32 3.1.1 what is public participation? 32 3.1.2 objectives of public participation 32 3.1.3 principles of best practice 33 3.1.4 criticism to public participatory process 36 3.2 relations between gtpud act, 1976 and public participation 38 Chapter- 4 42 Dahej town planning scheme 42 4.1 town planning schemes in industrial towns 43 4.2 notification of rda and institutions 45 4.2.1 institutions 46 4.3 development plan and its content 48 4.3.1 existing area details as per gov. Data of 2011-12 49 4.3.2 proposed land use 50 4.3.4 evolution of development plan 51 4.4 tpss and its CONTENTS 52 4.4.1 major criteria for framing the proposal of tps 53 4.4.2 evolution of tps no. 1 54 4.4.3 area breakup of tps no.1 54 4.4.4 silent features of tps no.1 55 Chapter-5 56 Public grievances and gov. Response 56 5.1 public disputes happened against tps 57 5.2 public participation and gov. Response to tps no.1 58 5.2.1 objections and suggestions to tps no.1 58 5.2.2 solutions by gov. 59 5.2.3 modifications made by gov. 60 5.2.4 issues which have not been solved 60 Chapter- 6 61 Analysis and initial findings 61 6.1 purpose sampling 62 6.2 tps no.1 process 63 6.2.1 public awareness 63 6.2.2 public involvement 65 6.2.3 accountability of public by govt. 69 6.2.4 public acceptability 72 6.2.5 public satisfaction 74 Chapter- 7 75 Conclusion 75 7.1 conclusion 76 Bibliography 79 Annexure 80
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Planning P TH-1677 DIY Not for loan 013009
Total holds: 0

CONTENTS Chapter- 1 0 Introduction 0 1.1 background 1 1.2 need of the study 3 1.3 aim 4 1.4 research questions 4 1.5 objectives 4 1.6 methodology 4 1.5 scope and limitations 6 1.6 scheme of chapterization 6 Chapter- 2 8 Literature review 8 2.1 industrialization in gujarat 9 2.1.1 industrial incentives in gujarat 11 2.1.3 dmic, dahej and industrial development 13 2.2 introduction of physical planning in gujarat and mechanism of tps 16 2.2.1 urban land management tools 18 2.2.2 current scenario of gujarat 21 2.2.3 comprehensive urban planning process 25 2.3 town planning schemes according to planning fathers 29 Chapter: 3 31 Tps as a public participatory process 31 3.1 public participation and its importance 32 3.1.1 what is public participation? 32 3.1.2 objectives of public participation 32 3.1.3 principles of best practice 33 3.1.4 criticism to public participatory process 36 3.2 relations between gtpud act, 1976 and public participation 38 Chapter- 4 42 Dahej town planning scheme 42 4.1 town planning schemes in industrial towns 43 4.2 notification of rda and institutions 45 4.2.1 institutions 46 4.3 development plan and its content 48 4.3.1 existing area details as per gov. Data of 2011-12 49 4.3.2 proposed land use 50 4.3.4 evolution of development plan 51 4.4 tpss and its CONTENTS 52 4.4.1 major criteria for framing the proposal of tps 53 4.4.2 evolution of tps no. 1 54 4.4.3 area breakup of tps no.1 54 4.4.4 silent features of tps no.1 55 Chapter-5 56 Public grievances and gov. Response 56 5.1 public disputes happened against tps 57 5.2 public participation and gov. Response to tps no.1 58 5.2.1 objections and suggestions to tps no.1 58 5.2.2 solutions by gov. 59 5.2.3 modifications made by gov. 60 5.2.4 issues which have not been solved 60 Chapter- 6 61 Analysis and initial findings 61 6.1 purpose sampling 62 6.2 tps no.1 process 63 6.2.1 public awareness 63 6.2.2 public involvement 65 6.2.3 accountability of public by govt. 69 6.2.4 public acceptability 72 6.2.5 public satisfaction 74 Chapter- 7 75 Conclusion 75 7.1 conclusion 76 Bibliography 79 Annexure 80

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials