JnNURM urban poor : a case of Pune (Also available on CD)
Material type: TextPublication details: 2012Description: xi,55p.,CD-ROMDDC classification:- P TH-1363 CHH
Item type | Current library | Collection | Call number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|
Thesis | CEPT Library | Faculty of Planning | P TH-1363 CHH | Not for loan | 009892 |
CONTENTS Certificate Undertaking Disclaimer Acknowledgements List of Abbreviations CONTENTS 1. Introduction 1 1.1 Background 1 1.2 Aim 2 1.3 Objectives 2 1.4 Scope & limitation 2 1.5 Need of the study 2 1.6 Assumption 3 1.7 Methodology 3 1.8 Selection of the Study area 3 1.9 Chapter Plan 4 2. Basic Services 11 2.1 Importance of Basic services 11 2.2 Public transport 11 2.3 Status of Basic services in Urban India 12 2.3.1 Shelter 12 2.3.2 Water Supply 12 2.3.3 Sewerage and Sanitation 13 2.3.4 Solid Waste Management 13 2.4 Critical issues in extending basic services to the poor 14 2.4.1 Volume of the problem 14 2.4.2 Finance 14 2.4.3 Institutional deficiencies 14 2.4.4 Gaps between demand & supply 14 2.4.5 Integration of services 14 2.4.6 Involvement and participation of users 15 2.4.7 Maintenance 5 3. JnNURM - An Introduction 5 3.1JnNURM 5 3.1.1 Background 5 3.1.2 Rationale 5 3.1.3 Components 6 3.1.4 Funding Pattern 6 3.1.5 Mission Implementation Strategy 6 3.1.6 Reforms 7 3.1.7 Expected Outcomes 8 3.2 JnNURM & the Poor 8 3.3 Review of the Mission 8 3.3.1 Repeal of the ULCRA 8 3.3.2 Participatory Planning 9 3.3.3 Haste 9 3.3.4 Huge backlog 9 3.3.5 Too much to handle 9 3.3.6 Focus on development of infrastructure 10 3.3.7 Attitude of the ULB 10 4. JnNURM in Pune 16 4.1 Pune - An Introduction16 4.1.1 Pune Municipal Corporation 17 4.1.2 Pimpri Chinchwad Municipal Corporation 19 4.2 JnNURM in Pune Urban Area 20 4.2.1 UIG v/s BSUP 20 4.3 UIG projects in PMC 20 4.3.1 Drainage/Storm Water Drainage Projects 21 4.3.2 Roads/Flyovers/RoB's Projects 25 4.3.3 MRTS Projects 27 4.4 BSUP Projects in PMC 33 4.4.1 Relocation Projects 34 4.4.2 Project for the Street Vendors 35 4.4.3 Project for Migrating Workers 35 4.4.4 In-situ Slum upgradation projects 36 4.5 UIG Projects in PCMC 37 4.5.1 Drainage/ Storm water drainage projects 37 4.5.2 Water Supply projects 38 4.5.3 Sewerage Projects 39 4.5.4 Solid Waste Management (SWM) 40 4.5.5 Mass rapid Transit System 41 4.6 BSUP Projects in PCMC 42 4.6.1 EWS housing 43 4.6.2 The In-situ redevelopment 43 4.6.3 Relocation projects 45 5. Findings & Suggestions 49 5.1 Water Supply 49 5.2 Sewerage/ Storm water Drainage 49 5.3 Solid waste management 49 5.4 Public Transport 50 5.5 Social Housing 50 5.5.1 In-situ development 50 5.5.2 In-situ redevelopment 50 5.5.3 Relocation projects 51 5.6 Other BSUP Projects 51 5.6.1 Project for Street Vendors 51 5.6.2 Projects for the migrating Workers 51 Bibliography 53
There are no comments on this title.