Image from Google Jackets

Return on investment of project systems(PS) implementation (ERP system) for contractor company (Also available on CD)

By: Contributor(s): Material type: TextTextPublication details: 2014Description: viii,73p.,CD-ROMDDC classification:
  • CPM TH-0255 SAG
Contents:
CONTENTS CHAPTER 1.0 1 INTRODUCTION 1 1.1 Introduction . 2 1.2 Need for Study 3 1.3 Objectives . 3 1.4 Scope 4 1.6 Research Plan 5 CHAPTER 2: 6 LITERATURE REVIEW 6 2.1 Introduction . 7 2.2 Return on Investment . 7 2.3 ERP In
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Thesis CEPT Library Faculty of Technology CPM TH-0255 SAG Not for loan 016312
Total holds: 0

CONTENTS CHAPTER 1.0 1 INTRODUCTION 1 1.1 Introduction . 2 1.2 Need for Study 3 1.3 Objectives . 3 1.4 Scope 4 1.6 Research Plan 5 CHAPTER 2: 6 LITERATURE REVIEW 6 2.1 Introduction . 7 2.2 Return on Investment . 7 2.3 ERP In

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials