Image from Google Jackets

Trenchless technology : planning, equipment, and methods

By: Publication details: McGraw-Hill Publication 2013 New DelhiDescription: xxiv,582pISBN:
  • 9780071762458
Subject(s):
DDC classification:
  • 621.8672 NAJ
Contents:
CONTENTS Preface xix Acknowledgments xxiii 1.Introduction and conceptual cost comparison of Trenchless Technology Methods 1 2. Planning for Trenchless Technolgy Projects 41 3.Trenchless Technology Contracts, Projects Delivery Methods, Specifications and Means and Methods 61 4. Geotechnical and Subsurface Considerations 85 5.Rock Mass Properties and Trenchless Project Feasibility 111 6.Locating and Tracking Planning and Methods for Horizontal Diractional Drilling 133 7. Drilling and Lubricating Fluids 161 8.Planning and Construction Requirements for Horizontal Diractional Drilling 181 9.Horizontal Auger Boring 241 10.Pipe Ramming 263 11.Microtunneling Methods 273 12.Pilot Tube Method 295 13. Pipe Jacking and Utility Tunneling 309 14. Cured-in-Place Pipe 351 15.Slipliniing 367 16.Sewer Lateral Renewal 389 17.Localized repairs 399 18.Planning and Construction Requirements for Pipe Bursting 421 19.Panel Linings for Large Diameter Sewer Applications 467 20.Spray-in-Place Pipe 479
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Date due Barcode Item holds
Book CEPT Library Faculty of Technology 621.8672 NAJ Available 016219
Total holds: 0

CONTENTS
Preface xix
Acknowledgments xxiii
1.Introduction and conceptual cost comparison of Trenchless Technology Methods 1
2. Planning for Trenchless Technolgy Projects 41
3.Trenchless Technology Contracts, Projects Delivery Methods, Specifications and Means and Methods 61
4. Geotechnical and Subsurface Considerations 85
5.Rock Mass Properties and Trenchless Project Feasibility 111
6.Locating and Tracking Planning and Methods for Horizontal Diractional Drilling 133
7. Drilling and Lubricating Fluids 161
8.Planning and Construction Requirements for Horizontal Diractional Drilling 181
9.Horizontal Auger Boring 241
10.Pipe Ramming 263
11.Microtunneling Methods 273
12.Pilot Tube Method 295
13. Pipe Jacking and Utility Tunneling 309
14. Cured-in-Place Pipe 351
15.Slipliniing 367
16.Sewer Lateral Renewal 389
17.Localized repairs 399
18.Planning and Construction Requirements for Pipe Bursting 421
19.Panel Linings for Large Diameter Sewer Applications 467
20.Spray-in-Place Pipe 479

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials