Image from Google Jackets

Transportation research record construction 2013

By: Material type: TextTextSeries: Journal of the transportation research board ; No.2347Publication details: Washington, D.C. Transportation Research Board 2013Description: viii,114pISBN:
  • 9780309263429
DDC classification:
  • 388.132 T.R.B.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Status Notes Date due Barcode Item holds
Book CEPT Library Faculty of Planning 388.132 T.R.B. Available GRATIS 012180
Total holds: 0

CONTENTS
Foreword vii
PART 1 -CONSTRUCTION MANAGEMENT AND PROJECT DELIVERY
Project Delivery Selection Matrix for Highway Design and Construction 3
Dai Q. Iran, Christofer M. Harper, Keith R. Molenaar,
Nabil F. Haddad, and Mark M. Scholfield
Fatigue in Highway Construction Workers: 11
Risks and Countermeasures in Rapid Renewal Project Schedules
J. Elizabeth Jackson, Thomas Sanquist,
John Campbell, Eul-Bum Lee, and Hans P. A. Van Dongen
Early Contractor Design Involvement to Expedite Delivery 19
of Emergency Highway Projects: Case Studies from Six States
Douglas D. Gransberg
PART 2-QUALITY ASSURANCE
Project Quality Assurance Organization Selection 29
for Highway Design and Construction Projects
Elizabeth Kraft and Keith R. Molenaar
PART 3-PORTLAND CEMENT CONCRETE PAVEMENT
Probing Portland Cement Concrete Pavement for Thickness 41
Determination in Wisconsin: Statistical Review
Gary C. Whited, Benjamin A. Stenhaug, and Wei-Yin Loh
Concrete Pavement Patching Challenges in Virginia 52
Mohamed Elfino, Affan Habib, Larry Lundy, and Syed Haider
Concrete Pavement Thickness Variation Assessment 61
with Cores and Nondestructive Testing Measurements
Mary Vancura, Lev Khazanovich, and Randal Barnes
PART 4-ASPHALT PAVEMENT
Influence of Thermal Segregation on Asphalt Pavement Compaction 71
M. M. Rahman, J. R. A. Grenfell, S. J. Arulanandam, and Anton lanakiev
Innovative Approach for Asphalt Pavement Compaction 79
Monitoring with Ground-Penetrating Radar
Pengcheng Shangguan, Imad L. AI-Qadi, Zhen Leng,
Robert L. Schmitt, and Ahmed Faheem
Haul Time Effects on Unmodified, Foamed, and Additive-Modified 88
Binders Used in Hot-Mix Asphalt
Isaac L. Howard, Gaylon L. Baumgardner, Walter S. Jordan III,
Andrew M. Menapace, Walaa S. Mogawer,
and James Michael Hemsley, Jr.
PART 5-BRIDGES AND STRUCTURES
Construction Engineering Recommendations for Curved and Skewed 99
Steel Girder Bridges: Summary of NCHRP Report 725, Appendix B
Domenic Coletti, Brandon Chavel, Donald White, Andres Sanchez,
Cagri Ozgur, and Juan Manuel Jimenez Chong
Lake Champlain Bridge Emergency Replacement Project 107
Ted Zoli, James Bridges, James Boni, and John Grady

There are no comments on this title.

to post a comment.
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials