Maintenance and protection of traffic (MPT) at active work zone (Softcopy is also available) (Record no. 72679)

MARC details
000 -LEADER
fixed length control field 02547nam a2200181Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240920s9999 xx 000 0 und d
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-1037
Item number PAT
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Patel, Joy (UG190638)
245 #0 - TITLE STATEMENT
Title Maintenance and protection of traffic (MPT) at active work zone (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2024
300 ## - PHYSICAL DESCRIPTION
Extent xvi,69p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note TABLE OF CONTENTS <br/>ABSTRACT i <br/>UNDERTAKING iii <br/>CERTIFICATE v <br/>ACKNOWLEDGEMENTS vii <br/>ABBREVIATIONS ix <br/>TABLE OF CONTENTS xi <br/>LIST OF FIGURES xiii <br/>LIST OF TABLES xv <br/>CHAPTER-1: INTRODUCTION 1 <br/>1.1 Introduction 1 <br/>1.1.1 Importance of MPT 1 <br/>1.1.2 Usage of MPT 2 <br/>1.1.3 How MPT is Helpful? 3 <br/>1.2 Research Goals 4 <br/>1.3 Research Objectives 4 <br/>CHAPTER-2: LITERATURE REVIEW 5 <br/>2.1 Impact of metro rail construction work zone on traffic environment (2014) 5 <br/>2.2 TEM Guidelines on Work Zone Safety (United Nations) 7 <br/>2.3 Comparative Analysis of Indian and International Road Work Safety Practices in Urban Areas 10 <br/>2.4 Case Study 15 <br/>CHAPTER-3: Research Methodology 23 <br/>3.1 Literature Review 24 <br/>3.2 Data Collection 24 <br/>3.3 Data Analysis and Integration 25 <br/>CHAPTER-4: Data collection 27 <br/>4.1 Site 1 - Baghban Char Rasta 28 <br/>4.1.1 Introduction 28 <br/>4.1.2 Site Plan 30 <br/>4.1.3 Typical Road Cross Section 31 <br/>4.1.4 Flow of Traffic Before Work Zone 32 <br/>4.1.5 Site Condition of Road During Work Zone 33 <br/>4.1.6 Flow of Traffic During Work Zone 34 <br/>4.2 Site 2 - Thaltej - Shilaj Road 35 <br/>4.2.1 Introduction 35 <br/>4.2.2 Site Plan 37 <br/>4.2.3 Typical Road Cross Section 38 <br/>4.2.4 Flow of Traffic Before Work Zone 39 <br/>4.2.5 Site Condition of Road During Work Zone 40 <br/>4.2.6 Flow of Traffic During Work Zone 41 <br/>CHAPTER-5: Data Analysis and Results 43 <br/>5.1 Analysing Site 1 - Baghban Char Rasta 43 <br/>5.1.1 Safety Concerns and Recommendations for Traffic Safety & Management ... 43 <br/>5.1.2 Traffic Safety and Management Plan Near Work Zone 45 <br/>5.2 Analysing Site 2 – Thaltej – Shilaj Road 46 <br/>5.2.1 Safety Concerns and Recommendations for Traffic Safety & Management ... 46 <br/>5.2.2 Traffic Safety and Management Plan Near Work Zone 49 <br/>5.3 Site Analysis and Varied Perspectives on MPT 51 <br/>5.4 Analyzing the Gaps between AMC, Contractors, and Road Users 57 <br/>CHAPTER-6: Conclusions 59 <br/>REFERENCES 61 <br/>APPENDIX 63<br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Joshi, Birva (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2019 Batch
891 ## - Topic
Topic Faculty of Technology
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Shelving location Date acquired Full call number Barcode Date last seen Price effective from Koha item type
      Not For Loan Faculty of Technology   CEPT Library CEPT Library Processing Center 20/09/2024 B TH-1037 PAT 026767 20/09/2024 20/09/2024 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials