Maintenance and protection of traffic (MPT) at active work zones (Softcopy is also available) (Record no. 72675)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 04786nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 240920s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-1033 |
Item number | PAT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Patel, Ayush (UG190253) |
245 #0 - TITLE STATEMENT | |
Title | Maintenance and protection of traffic (MPT) at active work zones (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2024 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xviii,91p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | TABLE OF CONTENTS <br/>ABSTRACT i <br/>CERTIFICATE v <br/>ACKNOWLEDGEMENTS vii <br/>CHAPTER-1: INTRODUCTION 1 <br/>1.1 Need for the Study 1 <br/>1.2 Key Considerations for WTMP (IRC:SP:55-2014) 2 <br/>1.2.1 Safety 2 <br/>1.2.2 Traffic Flow 3 <br/>1.2.3 Regulations and Standards 3 <br/>1.2.4 Types of Work zones 3 <br/>1.2.5 Traffic Control Devices 3 <br/>1.2.6 Traffic Management Plans 3 <br/>1.2.7 Communication 3 <br/>1.2.8 Worker Training 4 <br/>1.2.9 Innovation and Technology 4 <br/>1.2.10 Public Awareness 4 <br/>1.3 Aim 4 <br/>1.4 Objectives 4 <br/>CHAPTER-2: RESEARCH METHODOLOGY 5 <br/>2.1 Importance of MPT at Active Work Zones 6 <br/>2.2 Literature Review 6 <br/>2.2.1 Literature review for research gaps 7 <br/>2.2.2 Study of Indian guidelines 7 <br/>2.2.3 Comparison with International guidelines 7 <br/>2.3 Site Selection 7 <br/>2.4 Data Collection 8 <br/>2.5 Data Analysis 9 <br/>2.6 Development of Check List and New TMP 9 <br/>CHAPTER-3: LITERATURE REVIEW 11 <br/>3.1 Traffic Management 11 <br/>3.2 Road Safety and Work Zone Safety Audits 11 <br/>3.3 Impact of Work Zones 12 <br/>3.4 Indian Guidelines for Traffic Management & Safety 13 <br/>3.4.1 IRC:SP:55-2014 Guidelines on traffic management in work zones 13 <br/>3.4.2 IRC:SP:67-2012 Code of Practice for Road Signs 16 <br/>3.4.3 Name: IRC:SP:88-2019 Manual on Road Safety Audit 17 <br/>3.5 International Guidelines 18 <br/>3.5.1 Manual on uniform traffic control devices for streets and highways 18 <br/>3.5.2 Safety at Street Works and Road Works a Code of Practice (2013) 19 <br/>3.6 Comparison of the Guidelines 20 <br/>3.8 Case Study 21 <br/>3.8.1 Project brief 21 <br/>3.8.2 Bridges 22 <br/>3.8.3 Culverts 22 <br/>3.8.4 Phases of traffic control 22 <br/>3.8.5 Traffic control zone 23 <br/>3.8.6 Signs 24 <br/>3.8.7 Delineators 26 <br/>3.8.8 Traffic cones & cylinders 26 <br/>3.8.9 Drums 27 <br/>3.8.10 Barricades 28 <br/>3.8.11 Flagmen 29 <br/>3.8.12 Road markings 29 <br/>3.8.13 Traffic management at footways and for pedestrians 30 <br/>3.8.14 Work at junctions 30 <br/>3.8.15 Divided carriageway roads 31 <br/>3.9 Inferences from Literature Review 32 <br/>CHAPTER-4: DATA COLLECTION 33 <br/>4.1 AMC Interview 33 <br/>4.2 Work Zone Management for Site 1 (Naroda Patiya) 33 <br/>4.2.1 Location of study area 33 <br/>4.2.2 Project introduction 35 <br/>4.2.3 Land Use 36 <br/>4.2.4 Work Zone Introduction 37 <br/>4.2.5 Site plan (before the work zone) 38 <br/>4.2.6 Typical Cross-Sections 39 <br/>4.2.7 Traffic flow before work zone 40 <br/>4.2.8 Traffic flow during the work zone 41 <br/>4.2.9 Existing Site Conditions 42 <br/>4.3 Work Zone Management for Site 2 (Swami Vivekanand Marg) 43 <br/>4.3.1 Location of study area 43 <br/>4.3.2 Project introduction 44 <br/>4.3.3 Work zone introduction 45 <br/>4.3.4 Site plan before the work zone 46 <br/>4.3.5 Typical cross-section of site 47 <br/>4.3.6 Traffic flow on site before work zone 48 <br/>4.3.7 Traffic flow on site during the work zone 49 <br/>4.3.8 Existing site conditions 50 <br/>4.4 Work Zone Management for Site 3 (Juna Vadaj Junction) 51 <br/>4.4.1 Location of study area 51 <br/>4.4.2 Project introduction 52 <br/>4.4.3 Work zone introduction 53 <br/>4.4.4 Site plan before the work zone 54 <br/>4.4.5 Typical cross section of site 55 <br/>4.4.6 Traffic flow on site before work zone 56 <br/>4.4.7 Traffic flow on site after during work zone 57 <br/>4.4.8 Existing site conditions 58 <br/>4.5 Site 4 – (Sardar Patel Chowk) 59 <br/>4.5.1 Location of study area 59 <br/>4.5.2 Site plan 60 <br/>4.5.3 Existing site conditions 61 <br/>CHAPTER-5: DATA ANALYSIS & RESULT 63 <br/>5.1 Review of Site Practices on Site 1 – Naroda Patiya Circle 63 <br/>5.2 Traffic Management Plan for Site 1 – Naroda Patiya Circle 67 <br/>5.3 Review of Site Practices on Site 2 – Swami Vivekanand Marg 68 <br/>5.4 Traffic Management Plan for Site 2 – Swami Vivekanand Marg 72 <br/>5.5 Review of Site Practices on Site 3 – Juna Vadaj Junction 73 <br/>5.6 Traffic Management Plan for Site 3 - Juna Vadaj Junction 77 <br/>5.7 Review of Site Practices on Site 4 – Sardar Patel Chowk 78 <br/>5.8 Traffic Management Plan for Site 4 - Sardar Patel Chowk 79 <br/>5.9 Check List for the Implementation of Traffic Management & Safety Measures 80 <br/>CHAPTER-6: CONCLUSION 85 <br/>CHAPTER-7: FUTURE SCOPE 87 <br/>REFERENCES 89 <br/>APPENDIX 91 <br/>AMC interview transcript 91<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Joshi, Birva (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2019 Batch |
891 ## - Topic | |
Topic | Faculty of Technology |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Shelving location | Date acquired | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | Processing Center | 20/09/2024 | B TH-1033 PAT | 026763 | 20/09/2024 | 20/09/2024 | Thesis |