Defining a new age project coordination system - the next step from common data environment (Softcopy is also available) (Record no. 72672)

MARC details
000 -LEADER
fixed length control field 03557nam a2200181Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240920s9999 xx 000 0 und d
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-1030
Item number SAR
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Sardhara, Bhagvat (UG180106)
245 #0 - TITLE STATEMENT
Title Defining a new age project coordination system - the next step from common data environment (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2023
300 ## - PHYSICAL DESCRIPTION
Extent xvi,84p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note TABLE OF CONTENTS <br/>ABSTRACT i <br/>UNDERTAKING iii <br/>CERTIFICATE v <br/>ACKNOWLEDGEMENTS vii <br/>TABLE OF CONTENTS ix <br/>LIST OF FIGURES xiii <br/>LIST OF TABLES xv <br/>CHAPTER-1: INTRODUCTION 17 <br/>1.1 Research Gap/Need 18 <br/>1.1.1 Hypothesis Generation / Critical Thinking 19 <br/>1.2 Aim/Objective 20 <br/>CHAPTER-2: Literature Review 24 <br/>2.1 Project Coordination System 24 <br/>2.2 Common Data Environment 29 <br/>2.3 RIBA Plan of Work 30 <br/>2.3.1 RIBA plays several important roles, including: 35 <br/>2.3.2 The RIBA Plan of Work outlines several key strategies: 36 <br/>2.4 Literature study - (Investigating effect of poor communication in terms of time & cost overrun) 37 <br/>2.4.1 Literature Review 37 <br/>2.4.2 Qualitative Study 38 <br/>2.4.3 Introduction 38 <br/>2.4.4 Effects of Poor Communication on Time Overrun 39 <br/>2.4.5 Effect of Poor Communication on Cost Overrun 40 <br/>2.4.6 Interviews with Expert 41 <br/>2.4.7 Results 41 <br/>2.5 Take Away 42 <br/>CHAPTER-3: research Methodology 43 <br/>3.1 Introduction 43 <br/>3.2 Research Model 44 <br/>3.2.1 Research Philosophy 45 <br/>3.2.2 Research Approach 46 <br/>3.2.3 Research Strategies 47 <br/>3.2.4 Time Horizons 48 <br/>CHAPTER-4: Research till date 51 <br/>4.1 Need or purpose to design a Prototype based on Past research 52 <br/>CHAPTER-5: Prorotype 1 56 <br/>5.1 Introduction 56 <br/>5.2 Objective 57 <br/>5.3 Challenges in Conventional Data Management and Communication 57 <br/>5.3.1 Manual Data Entry and Processing 57 <br/>5.3.2 Time-Consuming Reporting 57 <br/>5.3.3 Communication Gaps 58 <br/>5.3.4 Error-Prone Processes 58 <br/>5.4 Benefits of Automation 58 <br/>5.4.1 Real-Time Data Processing 58 <br/>5.4.2 Efficiency and Time Savings 58 <br/>5.4.3 Improved Communication 58 <br/>5.4.4 Data Accuracy 59 <br/>5.4.5 Scalability 59 <br/>CHAPTER-6: Stages of Creating Prototype Design 60 <br/>6.1 Procedure of STAGE 1 60 <br/>6.1.1 Data Retrieval 60 <br/>6.1.2 Data Transformation 61 <br/>6.2 Procedure of STAGE-2 61 <br/>6.2.1 Excel Dashboard Creation 61 <br/>6.2.2 Data Preparation 62 <br/>6.2.3 Tool Selection 62 <br/>6.2.4 Dashboard Design 62 <br/>6.2.5 Interactive Elements 62 <br/>6.2.6 Scheduled Data Refresh 62 <br/>6.2.7 User Access Control 62 <br/>6.3 Procedure of STAGE-3 63 <br/>6.3.1 Data Trigger Detection 63 <br/>6.3.2 Automation Engines 63 <br/>6.3.3 Recipient Selection 63 <br/>6.3.4 Email Content Generation 63 <br/>6.3.5 Notification Scheduling 64 <br/>6.4 Procedure for STAGE – 4 64 <br/>6.4.1 Bi-Directional Communication 64 <br/>6.4.2 Initiation of Conversations 64 <br/>6.4.3 Notification and Reminder System 64 <br/>6.4.4 Record Keeping and Archive 65 <br/>6.4.5 Data Synchronization 65 <br/>6.5 Advantages of Prototype-1 65 <br/>6.6 Conclusion 66 <br/>CHAPTER-7: Prototype 2 (Final Design) 69 <br/>7.1 Need / Aim 69 <br/>7.2 Advantages of the Project Coordination System with Smart Bots: 70 <br/>7.3 Innovation in Designing a New system then existing systems 71 <br/>7.4 Incorporation of Future Enhancements 78 <br/>7.4.1 Future Enhancements 79 <br/>CHAPTER-8: References 81<br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Patel, Viranj (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2018 Batch
891 ## - Topic
Topic Faculty of Technology
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Shelving location Date acquired Full call number Barcode Date last seen Price effective from Koha item type
      Not For Loan Faculty of Technology   CEPT Library CEPT Library Processing Center 20/09/2024 B TH-1030 SAR 026760 20/09/2024 20/09/2024 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials