Defining a new age project coordination system - the next step from common data environment (Softcopy is also available) (Record no. 72672)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03557nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 240920s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-1030 |
Item number | SAR |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Sardhara, Bhagvat (UG180106) |
245 #0 - TITLE STATEMENT | |
Title | Defining a new age project coordination system - the next step from common data environment (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2023 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xvi,84p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | TABLE OF CONTENTS <br/>ABSTRACT i <br/>UNDERTAKING iii <br/>CERTIFICATE v <br/>ACKNOWLEDGEMENTS vii <br/>TABLE OF CONTENTS ix <br/>LIST OF FIGURES xiii <br/>LIST OF TABLES xv <br/>CHAPTER-1: INTRODUCTION 17 <br/>1.1 Research Gap/Need 18 <br/>1.1.1 Hypothesis Generation / Critical Thinking 19 <br/>1.2 Aim/Objective 20 <br/>CHAPTER-2: Literature Review 24 <br/>2.1 Project Coordination System 24 <br/>2.2 Common Data Environment 29 <br/>2.3 RIBA Plan of Work 30 <br/>2.3.1 RIBA plays several important roles, including: 35 <br/>2.3.2 The RIBA Plan of Work outlines several key strategies: 36 <br/>2.4 Literature study - (Investigating effect of poor communication in terms of time & cost overrun) 37 <br/>2.4.1 Literature Review 37 <br/>2.4.2 Qualitative Study 38 <br/>2.4.3 Introduction 38 <br/>2.4.4 Effects of Poor Communication on Time Overrun 39 <br/>2.4.5 Effect of Poor Communication on Cost Overrun 40 <br/>2.4.6 Interviews with Expert 41 <br/>2.4.7 Results 41 <br/>2.5 Take Away 42 <br/>CHAPTER-3: research Methodology 43 <br/>3.1 Introduction 43 <br/>3.2 Research Model 44 <br/>3.2.1 Research Philosophy 45 <br/>3.2.2 Research Approach 46 <br/>3.2.3 Research Strategies 47 <br/>3.2.4 Time Horizons 48 <br/>CHAPTER-4: Research till date 51 <br/>4.1 Need or purpose to design a Prototype based on Past research 52 <br/>CHAPTER-5: Prorotype 1 56 <br/>5.1 Introduction 56 <br/>5.2 Objective 57 <br/>5.3 Challenges in Conventional Data Management and Communication 57 <br/>5.3.1 Manual Data Entry and Processing 57 <br/>5.3.2 Time-Consuming Reporting 57 <br/>5.3.3 Communication Gaps 58 <br/>5.3.4 Error-Prone Processes 58 <br/>5.4 Benefits of Automation 58 <br/>5.4.1 Real-Time Data Processing 58 <br/>5.4.2 Efficiency and Time Savings 58 <br/>5.4.3 Improved Communication 58 <br/>5.4.4 Data Accuracy 59 <br/>5.4.5 Scalability 59 <br/>CHAPTER-6: Stages of Creating Prototype Design 60 <br/>6.1 Procedure of STAGE 1 60 <br/>6.1.1 Data Retrieval 60 <br/>6.1.2 Data Transformation 61 <br/>6.2 Procedure of STAGE-2 61 <br/>6.2.1 Excel Dashboard Creation 61 <br/>6.2.2 Data Preparation 62 <br/>6.2.3 Tool Selection 62 <br/>6.2.4 Dashboard Design 62 <br/>6.2.5 Interactive Elements 62 <br/>6.2.6 Scheduled Data Refresh 62 <br/>6.2.7 User Access Control 62 <br/>6.3 Procedure of STAGE-3 63 <br/>6.3.1 Data Trigger Detection 63 <br/>6.3.2 Automation Engines 63 <br/>6.3.3 Recipient Selection 63 <br/>6.3.4 Email Content Generation 63 <br/>6.3.5 Notification Scheduling 64 <br/>6.4 Procedure for STAGE – 4 64 <br/>6.4.1 Bi-Directional Communication 64 <br/>6.4.2 Initiation of Conversations 64 <br/>6.4.3 Notification and Reminder System 64 <br/>6.4.4 Record Keeping and Archive 65 <br/>6.4.5 Data Synchronization 65 <br/>6.5 Advantages of Prototype-1 65 <br/>6.6 Conclusion 66 <br/>CHAPTER-7: Prototype 2 (Final Design) 69 <br/>7.1 Need / Aim 69 <br/>7.2 Advantages of the Project Coordination System with Smart Bots: 70 <br/>7.3 Innovation in Designing a New system then existing systems 71 <br/>7.4 Incorporation of Future Enhancements 78 <br/>7.4.1 Future Enhancements 79 <br/>CHAPTER-8: References 81<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Patel, Viranj (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2018 Batch |
891 ## - Topic | |
Topic | Faculty of Technology |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Shelving location | Date acquired | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | Processing Center | 20/09/2024 | B TH-1030 SAR | 026760 | 20/09/2024 | 20/09/2024 | Thesis |