Real estate project quality rating system (Softcopy is also available) (Record no. 72553)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02853nam a2200193Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 240906s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CEM TH-0461 |
Item number | VAL |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Vala, Kuldipsinh (PCM22175) |
245 #0 - TITLE STATEMENT | |
Title | Real estate project quality rating system (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2024 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xx,106p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Table Of Contents<br/>Abstract I<br/>Undertaking Iii<br/>Certificate V<br/>Acknowledgements Vii<br/>Abbreviations Ix<br/>Table Of Contents Xi<br/>List Of Figures Xv<br/>List Of Tables Xvii<br/>List Of Appendix Xix<br/>Chapter-1: Introduction 1<br/>1.1 Objective 2<br/>1.2 Scope Of Study 2<br/>Chapter-2: Literature Review 5<br/>2.1 Construction Quality Definition 5<br/>2.2 Conquas 6<br/>2.2.1 Objectives Of Conquas 6<br/>2.2.2 Scope Of Conquas 6<br/>2.2.3 The Weightages 7<br/>2.2.4 Scoring 8<br/>2.2.5 Sampling 8<br/>2.2.6 Conquas Assessor 9<br/>2.2.7 The Effectiveness Of Conquas To Building Construction Qa 9<br/>2.2.8 The Insight On (Qlassic) Implementation 11<br/>2.3 Home Quality Mark (Hqm 11<br/>2.3.1 Key Objectives And Features Of Hqm 12<br/>2.3.2 Differentiators Of Hqm Homes 12<br/>2.3.3 Hqm Rating System: 13<br/>2.3.4 Hqm Application And Assessment 13<br/>2.3.5 Certification Process 13<br/>2.3.6 Hqm Assessment Issues And Criteria 14<br/>2.3.7 Hqm Evidence Requirements 14<br/>2.4 Structure For Assessment 15<br/>2.5 Quality Common Scoring By Nhbc 16<br/>Chapter-3: Research Methodology 19<br/>3.1 Project Breakdown And Framework Development 20<br/>3.2 Various Checklist 22<br/>3.3 Considerations During Application 22<br/>Chapter-4: Data Collection 25<br/>4.1 Aryan Aranyam 26<br/>4.1.1 Current Stage Of Work. 27<br/>4.2 The Bellagio 28<br/>4.2.1 Current Stage Of Work. 28<br/>4.3 Shilp Serene 29<br/>4.3.1 Current Stage Of Work. 30<br/>4.4 Riviera Majestica 30<br/>4.4.1 Current Stage Of Work 31<br/>4.5 Shivalik Green View 32<br/>4.5.1 Current Stage Of Work 33<br/>4.6 Satyamev Vista Two 33<br/>4.6.1 Current Stage Of Work 34<br/>4.7 Vida Homes 35<br/>4.7.1 Current Stage Of Work 35<br/>4.8 Indraprasth Shivanta 36<br/>4.8.1 Current Stage Of Work 36<br/>4.9 The Canvas 37<br/>4.10 Adani Energy House 38<br/>4.10.1 Current Stage Of Work 38<br/>4.11 Money Plant Junction 39<br/>4.11.1 Current Stage Of Work 39<br/>4.12 Organization Structure For Quality Management 40<br/>4.13 Roles And Responsibilities For Quality Management 40<br/>4.14 Current Process For Quality Control 43<br/>Chapter-5: Data Analysis And Results 45<br/>5.1 Implementation Of Quality Rating 45<br/>5.2 Challenges 47<br/>5.3 Advantages 47<br/>5.4 Sop For Implementation Of The Pqrs 49<br/>Chapter-6: Conclusion 51<br/>6.1 Future Scope Of Work 52<br/>References 53 <br/>Appendix 57<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Gupta, Nayan (Guide) |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Kachru, Sumant (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2022 Batch |
891 ## - Topic | |
Topic | Construction engineering and Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | 06/09/2024 | Faculty of Technology | CEM TH-0461 VAL | 026670 | 06/09/2024 | 06/09/2024 | Thesis |