Examine, assess and improve the efficiency of labour productivity using a lean approach to construction (Softcopy is also available) (Record no. 72537)

MARC details
000 -LEADER
fixed length control field 04715nam a2200181Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240906s9999 xx 000 0 und d
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CEM TH-0445
Item number GOH
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Gohil, Meet (PCM21214)
245 #0 - TITLE STATEMENT
Title Examine, assess and improve the efficiency of labour productivity using a lean approach to construction (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2024
300 ## - PHYSICAL DESCRIPTION
Extent xxiv,235p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note <br/> TABLE OF CONTENTS <br/>ABSTRACT v <br/>UNDERTAKING vii <br/>CERTIFICATE ix <br/>ACKNOWLEDGEMENTS xi <br/>ABBREVIATIONS xiii <br/>TABLE OF CONTENTS xv <br/>LIST OF FIGURES xix <br/>LIST OF TABLES xxi <br/>LIST OF APPENDIX xxiii <br/>CHAPTER-1: INTRODUCTION 25 <br/>1.1 Background 27 <br/>1.2 Current Labour Productivity in Construction 29 <br/>1.3 Research Gap 31 <br/>1.4 Research Aim and Objective 31 <br/>1.5 Purpose of Study 32 <br/>1.5.1 Relationship between Labour Productivity and Cost Per Unit 33 <br/>CHAPTER-2: LITERATURE REVIEW 35 <br/>2.1 Introduction to Labour Productivity in Construction 35 <br/>2.2 Theoretical Framework: Lean Principles in Construction 36 <br/>2.3 Historical Perspectives on Labour Efficiency in Construction 36 <br/>2.4 Factors Influencing Labour Productivity in Construction 37 <br/>2.5 Lean Tools and Techniques for Improving Labour Efficiency 37 <br/>2.6 Challenges and Barriers to Implementing Lean in Construction 38 <br/>2.7 Metrics and Measurement of Labour Productivity in Construction 38 <br/>2.8 Strategies for Assessing and Benchmarking Labour Efficiency 39 <br/>CHAPTER-3: RESEARCH METHODOLOGY 41 <br/>3.1 Data Collection Methods 41 <br/>3.2 Data Collection Design 43 <br/>3.2.1 Designing Data Collection Instruments: 43 <br/>3.2.2 Plan for Obtaining Relevant Data: 48 <br/>3.3 Implementation of Lean Tools 50 xvi <br/>CHAPTER-4: DATA COLLECTION 51 <br/>4.1 Primary Survey 51 <br/>4.2 Interviews: 51 <br/>4.3 Detailed Interview 52 <br/>4.4 Lean Tools Application 53 <br/>CHAPTER-5: DATA ANALYSIS 55 <br/>5.1 Forman Delay Survey on a Highrise Residential project. 59 <br/>5.2 C-P-O Analysis 64 <br/>5.2.1 Context Analysis 64 <br/>5.2.2 Problem Analysis 66 <br/>5.2.3 Option Analysis 67 <br/>5.2.4 Inference 68 <br/>5.3 SWOT Analysis of Labour Productivity 68 <br/>5.3.1 Introduction 68 <br/>5.3.2 Strengths of Labour Productivity 69 <br/>5.3.3 Weaknesses of Labour Productivity. 69 <br/>5.3.4 Opportunities for Labour Productivity Improvement 70 <br/>5.3.5 Threats to Labour Productivity 70 <br/>5.4 Legal Compliances 71 <br/>5.4.1 Overview of Labour Laws in Gujarat 71 <br/>5.4.2 Compliance Requirements for Labour Productivity 72 <br/>5.4.3 Challenges in Ensuring Legal Compliance 73 <br/>5.4.4 Case study 73 <br/>5.5 Linear Responsibility Chart 75 <br/>5.6 Risk Management 77 <br/>5.6.1 Risk Identification 78 <br/>5.6.2 Risk Matrix Creation 79 <br/>5.6.3 Inferences 81 <br/>5.7 Last Planner System 82 <br/>5.7.1 Project Details 82 <br/>5.7.2 Stakeholder overview 83 <br/>5.7.3 Implementation of LPS 84 <br/>5.7.4 Variation Categorization 86 <br/>5.7.5 Productivity Analysis 88 <br/>5.7.6 Manpower Variation in 89 <br/>5.7.7 Inferences 90 <br/>5.8 Work Sampling 91 <br/>5.8.1 Project Details 92 <br/>5.8.2 Crew Based Work Sampling 92 <br/>5.9 Conventional Productivity Analysis – Case Study 1 99 <br/>5.9.1 Project Details 99 <br/>5.9.2 Data Collection 100 <br/>5.9.3 Data Analysis 100 <br/>5.9.4 Inferences 101 <br/>5.10 Conventional Productivity Analysis – Case Study 2 102 <br/>5.10.1 Project Details 102 <br/>5.10.2 Data Collection 103 <br/>5.10.3 Data Analysis 103 <br/>5.10.4 Inferences 107 <br/>CHAPTER-6: RECOMMENDATIONS 109 <br/>6.1 Visual Management in Construction Site 109 <br/>6.1.1 Purpose of Visual Management 110 <br/>6.1.2 Importance of Color-Coded Uniforms 110 <br/>6.1.3 Selection of Colours for Different Labourers 111 <br/>6.1.4 Considerations for Visibility and Safety 113 <br/>6.1.5 Practical Implementation of Visual Management 113 <br/>6.1.6 Uniform Distribution and Maintenance 114 <br/>6.1.7 Training and Awareness for Workers 114 <br/>6.2 Labour Productivity Tracking Device for Construction Sites 115 <br/>6.2.1 Introduction 115 <br/>6.2.2 Purpose 116 <br/>6.2.3 Scope 116 <br/>6.2.4 Objectives 117 <br/>6.2.5 Overview of Labour Productivity Tracking 117 <br/>6.2.6 Definition 118 <br/>6.2.7 Existing Labour Productivity Tracking Methods 118 <br/>6.2.8 Labour Productivity Tracking Device for Construction Sites 121 <br/>CHAPTER-7: FUTURE SCOPE 127 <br/>7.1 Artificial Intelligence (AI) Integration 127 <br/>7.2 Internet of Things (IoT) Connectivity 128 <br/>7.3 Predictive Analytics 128 <br/>CHAPTER-8: CONCLUSION 131 <br/>REFERENCES 139 <br/>APPENDIX 142<br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Bhatt, Naimish (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2021 Batch
891 ## - Topic
Topic Construction engineering and Management
891 ## - Topic
Topic FT-PG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
      Not For Loan Faculty of Technology   CEPT Library CEPT Library 06/09/2024 Faculty of Technology CEM TH-0445 GOH 026654 06/09/2024 06/09/2024 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials