Defining a new age project coordination system the next step from common data environment (Softcopy is also available) (Record no. 72090)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03307nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 240520s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-1018 |
Item number | PAT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Patel, Nidhi (UG180391) |
245 #0 - TITLE STATEMENT | |
Title | Defining a new age project coordination system the next step from common data environment (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2023 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xvii,79p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | TABLE OF CONTENTS<br/>Contents<br/>ABSTRACT i<br/>UNDERTAKING iii<br/>CERTIFICATE v<br/>ACKNOWLEDGEMENTS vii <br/>ABBREVIATIONS ix<br/>TABLE OF CONTENTS xi<br/>LIST OF FIGURES xv<br/>LIST OF TABLE xvii<br/>CHAPTER-1: INTRODUCTION 19<br/>1.1 Background 20<br/>1.1.1 Manual Process: 21<br/>1.1.2 Common Data Environment: 22<br/>1.1.3 Connected Data Environment 23<br/>1.2 Need for Research 24<br/>1.3 Aim of Research 24<br/>1.4 Objectives of Research 25<br/>1.5 Scope of Work 25<br/>1.6 Research Timeline 25<br/>CHAPTER-2: Research Methodlogy 27<br/>2.1 Introduction 27<br/>2.2 Research Model Adopted 27<br/>2.2.1 Research Philosophies 28<br/>2.2.2 Research Approaches 29<br/>2.2.3 Research Strategies 29<br/>2.2.4 Research Choices 29<br/>2.2.5 Time Horizon 29<br/>2.2.6 Research Technique & Procedures 29<br/>CHAPTER-3: Literature review 31<br/>3.1 Literature review methodology 31<br/>3.2 Sources of Literature 32<br/>3.3 Conceptual Overview 33<br/>3.3.1 Coordination 33<br/>3.3.2 Building Information Modelling 35<br/>3.3.3 Common Data Environment 36<br/>3.3.4 Business Process Automation 37<br/>3.3.5 System Integration 38<br/>3.4 Manual process for PCS 39<br/>3.4.1 Challenges Faced in Manual Process 40<br/>3.5 Traditional Common Data Environment 41<br/>3.6.1 Latency 42<br/>3.6.2 Scoring dark data 42<br/>3.6.3 Siloed Information in data containers 42<br/>3.6.4 Lack of integration 42<br/>CHAPTER-4: Data Collection 43<br/>4.1 RIBA Stages of Construction Project 43<br/>4.1.2 Types of Procurement Routes 46<br/>4.2 Project Stakeholders & Responsibilities 47<br/>4.3 Project Stakeholders Challenges 48<br/>CHAPTER-5: Case Study 49<br/>5.1 Introduction 49<br/>5.1.1 Case studies 49<br/>5.2 Contractor 1 50<br/>5.2.1 Preliminary Project Information & Scope of Work 50<br/>5.2.2 As-Is Mapping 50<br/>5.2.3 Digitization using Visilean 53<br/>5.2.4 Interoperability diagram 55 <br/>5.3 Contractor – 2 56 <br/>5.3.1 Preliminary Project Information 56<br/>5.3.2 Domain Specific Departments 56<br/>5.3.3 As-Is Mapping 58<br/>5.3.4 Strength & Interoperability Diagram 61<br/>5.4 Observations 63<br/>CHAPTER-6: Defining new Age project Coordination system 65<br/>6.1 Business process Automation 65<br/>6.2 Activities and Matrix 65<br/>6.3 Use Cases for System Integrations 67<br/>6.4 Use Case-1 Integration with Communication Systems 68<br/>6.4.1 Challenges in Current Procedure 68<br/>6.4.2 Proposed system 68<br/>6.4.3 Reaction 68<br/>6.5 Use case 4 Coordination meetings – RFI and information agendas. 70<br/>6.5.1 Challenges of Current System 70<br/>6.6 Use Case 5 Actionable notification for high value tasks 70<br/>6.6.1 Challenges in current system 70<br/>6.7 Workflow Enhancement - Quality Management Systems and Scheduling Software 71<br/>6.7.1 Challenge in Current procedure 71<br/>6.7.2 Proposed system 71<br/>CHAPTER-7: Conclusion 73<br/>REFERENCES 77<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Patel, Viranj (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2018 Batch |
891 ## - Topic | |
Topic | Faculty of Technology |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | 20/05/2024 | Faculty of Technology | B TH-1018 PAT | 026185 | 20/05/2024 | 20/05/2024 | Thesis |