Impact of real estate regulatory act, 2016 on real estate project maintenance management (Ahmedabad, Gujarat) (Softcopy is also available) (Record no. 71655)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02301nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 240228s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | MUM TH-0274 |
Item number | DOS |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Doshi, Venkat (PUM21395) |
245 #0 - TITLE STATEMENT | |
Title | Impact of real estate regulatory act, 2016 on real estate project maintenance management (Ahmedabad, Gujarat) (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2023 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | v,51p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | TABLE OF CONTENTS<br/>1 Contents<br/>UNDERTAKING I<br/>ACKNOWLEDGEMENT II<br/>TABLE OF CONTENTS III<br/>LIST OF FIGURES V<br/>LIST OF TABLES V<br/>1. INTRODUCTION 1<br/>1.1 BACKGROUND STUDY 1<br/>1.2 RESEARCH REQUIREMENTS 2<br/>1.2.1 NEED OF RESEARCH 2<br/>1.2.2 AIM OF STUDY 2<br/>1.2.3 OBJECTIVES 3<br/>1.2.4 SCOPE 3<br/>1.2.5 LIMITATIONS 3<br/>1.3 METHODOLOGY 3<br/>2 LITERATURE REVIEW 5<br/>2.1 OVERVIEW OF RERA 5<br/>2.1.1 The Organization 5<br/>2.1.2 The Responsibilities 5<br/>2.2 UNDERSTANDING THE ACT 6<br/>2.2.1 Key Aspects of the Act 6<br/>2.2.2 Clauses Important to Project Maintenance 7<br/>2.2.3 GUJRERA Order for Project Maintenance Management 8<br/>2.3 Online Study 9<br/>2.4 Previous Theses 9<br/>2.4.1 Implications Of RERA On Real Estate Development And Approval Procedures: Issues<br/>and Challenges (2018) - PTH2231 9<br/>2.4.2 Scope and Impact of Real Estate (Regulation and Development) Act (2017-18) -<br/>BTH0766 10<br/>2.5 AifoRERA 10<br/>3 INTERVIEW WITH RERA OFFICIALS 11<br/>3.1 First Interview and Views 11<br/>4 COMPLAINT ANALYSIS 12<br/>4.1 Inference 13 <br/>5 SURVEY ANALYSIS 14<br/>5.1 Limitation in Analysis 14<br/>5.2 Developer Survey Analysis 15<br/>5.3 Buyer Survey Analysis 19<br/>5.4 Complainant And Defender Interview Analysis 20<br/>5.4.1 Case 1 20<br/>5.4.2 Case 2 21<br/>5.4.3 Case 3 22<br/>5.5 Inferences 23<br/>5.5.1 Inferences From Developer/Project Manager Survey 23<br/>5.5.2 Inferences From the Buyer Survey 23<br/>5.5.3 Inferences From Complainant and Defendant Interviews 24<br/>6 CONCLUSIONS 25<br/>7 RECOMMENDATIONS 26<br/>8 WAY FORWARD 27<br/>ANNEXURES 28<br/>Annexure 1 – Survey Questionnaire for Developers 28<br/>Annexure – 2 Responses for Developer/Project Manager Survey 30<br/>Annexure – 3 Responses for Buyer Survey 44<br/>REFERENCES 46<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Patel, Vatsal (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2021 Batch |
891 ## - Topic | |
Topic | FM-PG |
891 ## - Topic | |
Topic | Master in Urban Management |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Management | CEPT Library | CEPT Library | 28/02/2024 | Faculty of Management | MUM TH-0274 DOS | 025642 | 28/02/2024 | 28/02/2024 | Thesis |