Assessment of urban freight in the industrial supply chain : A case GIDC industrial estate, Ahmedabad (Softcopy is also available) (Record no. 69958)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01810nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 110103s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | P TH-2638 |
Item number | KUM |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Kumar, Kunal (PUT20179) |
245 ## - TITLE STATEMENT | |
Title | Assessment of urban freight in the industrial supply chain : A case GIDC industrial estate, Ahmedabad (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2022 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xvi,108p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>Undertaking i<br/>Acknowledgments v<br/>Abstract vii<br/>Table of contents xi<br/>List of figures xiii<br/>List of Tables xv<br/>Acronyms xvi<br/>1 BACKGROUND 1<br/>2 STUDY AREA 3<br/>2.1 History & Importance 3<br/>2.2 Connectivity 5<br/>2.3 Urban Freight Pattern 6<br/>2.4 Problem Statement 9<br/>2.5 Objective of the Study 9<br/>2.6 Research Argument 9<br/>2.7 Scope & Methodology 10<br/>3 LITERATURE REVIEW 13<br/>3.1 Supply Chain 13<br/>3.2 Industrial Supply Chain 13<br/>3.3 Emerging Trends 15<br/>3.4 Inefficiencies experienced 16<br/>3.5 Strategies Implemented 17<br/>4 DATA COLLECTION & ASSESSMENT 19<br/>4.1 Data Collection 19<br/>4.1.1 Pilot Study 19<br/>4.1.2 Phase 1 – Roadside interview and TVC 21<br/>4.2.6 Functions performed in between the legs of the Supply Chain ..37 4.3 Assessing the supply chain 38<br/>4.3.1 Commodity Inflow 38<br/>4.3.2 Commodity Outflow 41<br/>4.3.3 Why is this happening? 41<br/>4.3.4 Costing at External storage 42<br/>4.3.5 Comparative Assessment 43<br/>4.4 Policies or Regulations 47<br/>5 KEY FINDINGS, CONCLUSION & STRATEGIES 49<br/>5.1 Key Findings 49<br/>5.2 Conclusion 50<br/>5.3 Strategies 51<br/>References 55<br/>Appendix 1: Primary Survey – Roadside Interview 58<br/>Appendix 2: Traffic Volume Count – Gate No. 1 & 2 103<br/>Appendix 3: Survey Questionnaire 105<br/>Appendix 4: Matrices used for analysis 107<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shivanand, Swamy Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2020 Batch |
891 ## - Topic | |
Topic | Faculty of Planning |
891 ## - Topic | |
Topic | FP-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Planning | CEPT Library | CEPT Library | 06/10/2022 | Faculty of Planning | P TH-2638 KUM | 024040 | 30/09/2022 | 30/09/2022 | Thesis |