Developing an integrated green BIM process model for IGBC rating system (Softcopy is also available) (Record no. 69570)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03646nam a2200193Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 110101s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CEM TH-0392 |
Item number | IND |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Indurkhya, Kajal (PG190433) |
245 #0 - TITLE STATEMENT | |
Title | Developing an integrated green BIM process model for IGBC rating system (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2021 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 95p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | TABLE OF CONTENTS<br/>ABSTRACT 4<br/>UNDERTAKING 6<br/>CERTIFICATE 8<br/>ACKNOWLEDGEMENT 10<br/>NOMENCLATURE 12<br/>LIST OF FIGURES 19<br/>LIST OF TABLES 21<br/>CHAPTER-1: INTRODUCTION 23<br/>1.1 Introduction and Need for the study 23<br/>1.2 Objectives 23<br/>1.3 Scope of the work 24<br/>1.4 Methodology 24<br/>1.5 Timeline of activities 25<br/>1.6 Contribution 25<br/>CHAPTER-2: LITERATURE REVIEW 27<br/>2.1 BIM Adoption- Indian Scenario 27<br/>2.1.1 India BIM Association 27<br/>2.1.2 Barriers for BIM Implementation in Indian AECO Industry 27<br/>2.2 BIM Execution Plan 28<br/>2.3 Green Building Certification: Indian Scenario 29<br/>2.3.1 Issues faced in Green Building Construction 30<br/>2.4 Green BIM Practices 30<br/>2.4.1 Potential Uses of BIM in Green Building Certification 31<br/>2.4.2 Project Delivery Process of Green Building Projects 31<br/>2.4.3 Benefits of Green BIM 32<br/>2.4.4 Challenges of Green BIM 32<br/>2.4.5 Information Management 33<br/>2.5 Literature Review Summary 33<br/>CHAPTER-3: RESEARCH METHODOLOGY 36<br/>3.1 Overall Research Methodology 36<br/>3.2 Literature Review 38<br/>3.3 Data Collection 38<br/>3.3.1 Primary Data Collection 38<br/>3.3.2 Secondary Data Collection 38<br/>3.4 Solution 39<br/>CHAPTER-4: DATA COLLECTION 41<br/>4.1 Data Collected 41<br/>4.2 Interviews 42<br/>4.3 Research Papers 44<br/>4.4 Current practices without BIM 44<br/>4.4.1 Green Consultants 44<br/>4.4.2 Current barriers for optimum decision making without BIM integration 46<br/>4.5 Current practices in green BIM integrated process model 47<br/>4.5.1 Current barriers in the green BIM integrated process model 48<br/>4.5.2 Impact on cost and time factor 49<br/>4.5.3 Recommendations 49<br/>CHAPTER-5: DATA ANALYSIS AND INTERPRETATIONS 52<br/>5.1 Analysis 52<br/>5.1.1 Sustainable Architecture and Design 52<br/>5.1.1.1 Integrated Design Approach [1] 52<br/>5.1.1.2 Passive Architecture [2] 52<br/>5.1.2 Site Selection and Planning 52<br/>5.1.2.1 Local Building Regulations [Mandatory Requirement] 52<br/>5.1.2.2 Basic Amenities (SSP Credit 1) and Proximity to Public Transport (SSP Credit 2)<br/>[2] 52<br/>5.1.2.3 Basic Facilities for Construction Workforce [1] 53<br/>5.1.3 Water Conservation 53<br/>5.1.3.1 Rain Water Harvesting (Mandatory Requirement 1 and WC Credit 3) [2] 53<br/>5.1.3.2 Water Efficient Plumbing Fixtures (Mandatory Requirement 2 and WC Credit 4)<br/>[5] 54<br/>5.1.3.3 Landscape Design 57<br/>5.1.4 Energy Efficiency 57<br/>5.1.5 Building Materials and Resources [16] 59<br/>5.1.5.1 Sustainable Building Materials [8] 59<br/>5.1.5.2 Use of Certified Green Building Materials, Products and Equipment [1-5] 61<br/>5.1.6 Indoor Environmental Quality 61<br/>5.1.6.1 Daylighting Analysis [2] 61<br/>5.1.6.2 Outdoor Views 63<br/>5.1.7 Innovation and Development 63<br/>5.1.7.1 Innovation in Design 63<br/>5.1.8 Pilot Case Study 64<br/>5.2 Sorting of IGBC Credits 69<br/>5.3 Green BIM Process Map 76<br/>5.4 BIM Deliverables 77<br/>CHAPTER-6: CONCLUSION 79<br/>6.1 Benefit of using Green BIM approach 79<br/>6.2 Limitations 79<br/>6.3 Results 79<br/>6.4 Future Scope of Work 81<br/>REFERENCES 82<br/>ANNEXURES 84<br/>ANNEXURE 1 84<br/>ANNEXURE 2 85<br/>ANNEXURE 3 86<br/>ANNEXURE 4 88<br/>ANNEXURE 5 89<br/>ANNEXURE 6 89<br/>ANNEXURE 7 90<br/>ANNEXURE 8 92<br/>ANNEXURE 9 93<br/>ANNEXURE 10 94<br/>ANNEXURE 11 95<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Amarnath C.B. (Guide) |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Trivedi, Jyoti (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2019 Batch |
891 ## - Topic | |
Topic | Construction Engineering and Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | 27/04/2022 | Faculty of Technology | CEM TH-0392 IND | 023577 | 27/04/2022 | 27/04/2022 | Thesis |