Developing an integrated green BIM process model for IGBC rating system (Softcopy is also available) (Record no. 69570)

MARC details
000 -LEADER
fixed length control field 03646nam a2200193Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110101s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CEM TH-0392
Item number IND
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Indurkhya, Kajal (PG190433)
245 #0 - TITLE STATEMENT
Title Developing an integrated green BIM process model for IGBC rating system (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2021
300 ## - PHYSICAL DESCRIPTION
Extent 95p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note TABLE OF CONTENTS<br/>ABSTRACT 4<br/>UNDERTAKING 6<br/>CERTIFICATE 8<br/>ACKNOWLEDGEMENT 10<br/>NOMENCLATURE 12<br/>LIST OF FIGURES 19<br/>LIST OF TABLES 21<br/>CHAPTER-1: INTRODUCTION 23<br/>1.1 Introduction and Need for the study 23<br/>1.2 Objectives 23<br/>1.3 Scope of the work 24<br/>1.4 Methodology 24<br/>1.5 Timeline of activities 25<br/>1.6 Contribution 25<br/>CHAPTER-2: LITERATURE REVIEW 27<br/>2.1 BIM Adoption- Indian Scenario 27<br/>2.1.1 India BIM Association 27<br/>2.1.2 Barriers for BIM Implementation in Indian AECO Industry 27<br/>2.2 BIM Execution Plan 28<br/>2.3 Green Building Certification: Indian Scenario 29<br/>2.3.1 Issues faced in Green Building Construction 30<br/>2.4 Green BIM Practices 30<br/>2.4.1 Potential Uses of BIM in Green Building Certification 31<br/>2.4.2 Project Delivery Process of Green Building Projects 31<br/>2.4.3 Benefits of Green BIM 32<br/>2.4.4 Challenges of Green BIM 32<br/>2.4.5 Information Management 33<br/>2.5 Literature Review Summary 33<br/>CHAPTER-3: RESEARCH METHODOLOGY 36<br/>3.1 Overall Research Methodology 36<br/>3.2 Literature Review 38<br/>3.3 Data Collection 38<br/>3.3.1 Primary Data Collection 38<br/>3.3.2 Secondary Data Collection 38<br/>3.4 Solution 39<br/>CHAPTER-4: DATA COLLECTION 41<br/>4.1 Data Collected 41<br/>4.2 Interviews 42<br/>4.3 Research Papers 44<br/>4.4 Current practices without BIM 44<br/>4.4.1 Green Consultants 44<br/>4.4.2 Current barriers for optimum decision making without BIM integration 46<br/>4.5 Current practices in green BIM integrated process model 47<br/>4.5.1 Current barriers in the green BIM integrated process model 48<br/>4.5.2 Impact on cost and time factor 49<br/>4.5.3 Recommendations 49<br/>CHAPTER-5: DATA ANALYSIS AND INTERPRETATIONS 52<br/>5.1 Analysis 52<br/>5.1.1 Sustainable Architecture and Design 52<br/>5.1.1.1 Integrated Design Approach [1] 52<br/>5.1.1.2 Passive Architecture [2] 52<br/>5.1.2 Site Selection and Planning 52<br/>5.1.2.1 Local Building Regulations [Mandatory Requirement] 52<br/>5.1.2.2 Basic Amenities (SSP Credit 1) and Proximity to Public Transport (SSP Credit 2)<br/>[2] 52<br/>5.1.2.3 Basic Facilities for Construction Workforce [1] 53<br/>5.1.3 Water Conservation 53<br/>5.1.3.1 Rain Water Harvesting (Mandatory Requirement 1 and WC Credit 3) [2] 53<br/>5.1.3.2 Water Efficient Plumbing Fixtures (Mandatory Requirement 2 and WC Credit 4)<br/>[5] 54<br/>5.1.3.3 Landscape Design 57<br/>5.1.4 Energy Efficiency 57<br/>5.1.5 Building Materials and Resources [16] 59<br/>5.1.5.1 Sustainable Building Materials [8] 59<br/>5.1.5.2 Use of Certified Green Building Materials, Products and Equipment [1-5] 61<br/>5.1.6 Indoor Environmental Quality 61<br/>5.1.6.1 Daylighting Analysis [2] 61<br/>5.1.6.2 Outdoor Views 63<br/>5.1.7 Innovation and Development 63<br/>5.1.7.1 Innovation in Design 63<br/>5.1.8 Pilot Case Study 64<br/>5.2 Sorting of IGBC Credits 69<br/>5.3 Green BIM Process Map 76<br/>5.4 BIM Deliverables 77<br/>CHAPTER-6: CONCLUSION 79<br/>6.1 Benefit of using Green BIM approach 79<br/>6.2 Limitations 79<br/>6.3 Results 79<br/>6.4 Future Scope of Work 81<br/>REFERENCES 82<br/>ANNEXURES 84<br/>ANNEXURE 1 84<br/>ANNEXURE 2 85<br/>ANNEXURE 3 86<br/>ANNEXURE 4 88<br/>ANNEXURE 5 89<br/>ANNEXURE 6 89<br/>ANNEXURE 7 90<br/>ANNEXURE 8 92<br/>ANNEXURE 9 93<br/>ANNEXURE 10 94<br/>ANNEXURE 11 95<br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Amarnath C.B. (Guide)
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Trivedi, Jyoti (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2019 Batch
891 ## - Topic
Topic Construction Engineering and Management
891 ## - Topic
Topic FT-PG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
      Not For Loan Faculty of Technology   CEPT Library CEPT Library 27/04/2022 Faculty of Technology CEM TH-0392 IND 023577 27/04/2022 27/04/2022 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials