Investigating project scope definition elements in front end planning of indian metro rail projects (Softcopy is also available) (Record no. 69569)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02593nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 110101s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CEM TH-0391 |
Item number | PIT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Pitroda, Jalpesh (PG190409) |
245 #0 - TITLE STATEMENT | |
Title | Investigating project scope definition elements in front end planning of indian metro rail projects (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2021 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xvii,113p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | TABLE OF CONTENTS <br/>ABSTRACT i <br/>UNDERTAKING iii <br/>CERTIFICATE v <br/>ACKNOWLEDGEMENTS vii <br/>NOMENCLATURE ix <br/>LIST OF FIGURES xv <br/>LIST OF TABLES xvii <br/>CHAPTER-1: INTRODUCTION 1 <br/>1.1 Need for the study 1 <br/>1.2 Objectives of the study 3 <br/>1.3 Scope of the work 3 <br/>1.4 Methodology 3 <br/>1.5 Timeline of the activities 5 <br/>1.6 Contribution 5 <br/>CHAPTER-2: LITERATURE REVIEW 7 <br/>2.1 Construction phases in Infrastructure projects 7 <br/>2.2 Front-end planning or Pre-project planning 8 <br/>2.3 Importance of Front-end planning 10 <br/>2.4 Front-end planning process 13 <br/>2.5 Infrastructure growth in India 15 <br/>2.6 Need of Front-end planning in Infrastructure projects of India 15 <br/>2.7 PDRI a catalyst for promoting Front-end planning 17 <br/>2.8 Research Gap 18 <br/>CHAPTER-3: RESEARCH METHODOLOGY 21<br/>3.1 Alternate Knowledge claim 21 <br/>3.2 Strategies for inquiry 22 <br/>3.3 Research Methods 22 <br/>3.4 Adopted Research Methodology 23 <br/>3.4.1 Data Collection 24 <br/>3.4.2 Data Analysis 26 <br/>3.4.3 Discussion and Synthesis of Results 26 <br/>CHAPTER-4: DATA COLLECTION 27 <br/>4.1 Semi-structured Interviews 27 <br/>4.2 Importance Ranking 32 <br/>4.3 Questionnaire survey 32 <br/>4.4 Scope elements of metro-rail projects 34 <br/>4.4.1 Basis of Project Decision 34 <br/>4.4.2 Basis of Design 41 <br/>4.4.3 Execution Approach 54 <br/>CHAPTER-5: DATA ANALYSIS 63 <br/>5.1 Respondent Profile 63 <br/>5.2 Concept of Validity 63 <br/>5.2.1 Criterion-related validity 64 <br/>5.3 Reliability test 66 <br/>5.3.1 Split-Half technique 66 <br/>5.4 Relative Important Index (RII) 67 <br/>5.5 Summary of the results 68 <br/>CHAPTER-6: CONCLUSION 71 <br/>6.1 Limitations of the study 73 <br/>6.2 Future scope 73 xiii <br/>REFERENCES 75 <br/>APPENDIX 81 <br/>Appendix 1 - Interview Protocol 81 <br/>Appendix 2 – Interview transcripts 85 <br/>Appendix 3 – Questionnaire survey form 94 <br/>Appendix 4 – Reliability testing 109 <br/>Appendix 5 – Frequency count for Importance level 110 <br/>Appendix 6 – Ranking analysis 112<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Devkar, Ganesh (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2019 Batch |
891 ## - Topic | |
Topic | Construction Engineering and Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Not For Loan | Faculty of Technology | CEPT Library | CEPT Library | 27/04/2022 | Faculty of Technology | CEM TH-0391 PIT | 023576 | 27/04/2022 | 27/04/2022 | Thesis |