Search for remedial solution to key barriers preventing adoption of BIM in SMEs : focus on architectural practice in Kerala (Softcopy is also available) (Record no. 69566)

MARC details
000 -LEADER
fixed length control field 02546nam a2200193Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110101s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CEM TH-0388
Item number THE
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Theresa, Cindhya (PG190241)
245 #0 - TITLE STATEMENT
Title Search for remedial solution to key barriers preventing adoption of BIM in SMEs : focus on architectural practice in Kerala (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2021
300 ## - PHYSICAL DESCRIPTION
Extent xvi,89p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents<br/>ABSTRACT i<br/>UNDERTAKING v<br/>CERTIFICATE vii<br/>ACKNOWLEDGEMENTS ix<br/>NOMENCLATURE xi<br/>TABLE OF CONTENTS xiii<br/>LIST OF FIGURES xv<br/>LIST OF TABLES xvi<br/>CHAPTER-1: INTRODUCTION 2<br/>1.1 Background 2<br/>1.2 Need for the study 2<br/>1.3 Research Questions 3<br/>1.4 Objectives 3<br/>1.5 Scope of the work 4<br/>1.6 Methodology 4<br/>1.7 Timeline of activities 5<br/>1.8 Contribution 5<br/>CHAPTER-2: LITERATURE REVIEW 6<br/>2.1 Definitions 6<br/>2.1.1 Building Information Modelling -BIM 6<br/>2.1.2 Micro, Small, and Medium Enterprise 6<br/>2.2 BIM and AEC industry 7<br/>2.3 BIM adoption in a global scenario 8<br/>2.4 BIM adoption in Indian scenario 8<br/>2.5 The relevance of SMEs adopting BIM 9<br/>2.6 Current status of BIM adoption in SMEs 10<br/>2.7 Barriers in implementing BIM 10<br/>2.7.1 Barriers in implementing BIM in SMEs 11<br/>2.7.2 Barriers in implementing BIM in India 13<br/>2.8 BIM & Architectural practices 14<br/>2.9 Research gap 17<br/>CHAPTER-3: RESEARCH METHODOLOGY 19<br/>3.1 Literature review 20<br/>3.2 Research Method 20<br/>3.3 Data collection 21<br/>3.4 Summarizing the Methodology 21<br/>CHAPTER-4: DATA COLLECTION 23<br/>4.1 Semi-Structured Interviews 23<br/>4.1.1 Sample selection criteria 23<br/>4.1.2 The focus of semi-structured interviews 24<br/>4.2 Respondent details 25<br/>4.3 Highlights of Interviews 27<br/>4.3.1 Architects with BIM practice 28<br/>4.3.2 Non-BIM using Architects 30<br/>4.3.3 BIM experts 30<br/>4.4 Relevance of data collected 31<br/>CHAPTER-5: DATA ANALYSIS 32<br/>5.1 Interpretation and findings 32<br/>5.2 The key barriers 33<br/>5.3 The BIM situation among Kerala Architects 35<br/>5.3.1 BIM awareness among Architects in Kerala: 35<br/>5.3.2 BIM adoption among Architectural SMEs in Kerala: 36<br/>5.4 Barriers & challenges 37<br/>5.5 Solutions 43<br/>5.5.1 Solutions strategies for barriers 48<br/>CHAPTER-6: CONCLUSION 51<br/>CHAPTER-7: FUTURE SCOPE 53<br/>REFERENCES 54<br/>ANNEXURE 57<br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Amarnath C.B. (Guide)
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Dave, Bhargav (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2019 Batch
891 ## - Topic
Topic Construction Engineering and Management
891 ## - Topic
Topic FT-PG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
      Not For Loan Faculty of Technology   CEPT Library CEPT Library 27/04/2022 Faculty of Technology CEM TH-0388 THE 023573 27/04/2022 27/04/2022 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials