Selection of concrete pump for building construction (Soft copy is also available) (Record no. 68425)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02370nam a22001697a 4500 |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0381 |
Item number | GRE |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Grewal, Rajdeep Singh (PT101514) |
245 ## - TITLE STATEMENT | |
Title | Selection of concrete pump for building construction (Soft copy is also available) |
300 ## - PHYSICAL DESCRIPTION | |
Extent | 108p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Approval Certificate: i<br/>Declaration ii<br/>Acknowledgement iii<br/>Abstract iv<br/>Chapter 1: Introduction 1<br/>1.1 Background 1<br/>1.2 Need for Study 1<br/>1.3 Objectives 3<br/>1.4 Scope of Study 3<br/>1.5 Methodology 3<br/>1.6 Research Plan 4<br/>Chapter 2: Literature Review 5<br/>2.1 Types of Concrete Pumps 5<br/>2.1.1 Configurations of Concrete pumping Equipment 7<br/>2.2 Factors Affecting Selection of Concrete Pump 9<br/>2.3 Factors Identified for Selection of Concrete Pump 16<br/>2.4 Methods Used for Selection of Equipment/Concrete Pumps 18<br/>2.5 Analytic Hierarchy Process (AHP) 23<br/>2.5.1 Features of AHP 24<br/>2.5.2 AHP Basics 24<br/>2.6 Research Gap 26<br/>Chapter 3: Research Methodology 28<br/>3.1 Framework of the Research 28<br/>3.2 Methodology (for Objective 1) 29<br/>3.2.1 Literature Review 29<br/>3.2.2 Pilot Study 29<br/>3.3 Methodology (for Objective 2) 29<br/>3.3.1 Detailed Study Questionnaire 29<br/>3.3.2 Data Collection 29<br/>3.3.3 Method of Analysis 30<br/>3.4 Model Implementation 30<br/>3.4.1 Data Collection 30<br/>3.4.2 Method of Analysis 30<br/>Chapter 4: Data Collection and Analysis 31<br/>4.1 Analysis of Factors for Selection of Concrete Pump (Objective 1) 31<br/>4.1 1 Factors for Selection of Construction Equipment 31<br/>4.1.2 Factors for Selection of Concrete Pump 31<br/>4.1.2 Factors for Selection of Concrete Pump Identified from Pilot Study 32<br/>4.1.3 Factors for Selection of Concrete Pump 33<br/>4.2 Preparation of Decision Making Model 34<br/>4.2.1 Hierarchy Construction 34<br/>4.2.2 Pairwise Comparisons 35<br/>4.2.3 Survey Questionnaire 36<br/>4.2.3 Scoring of Alternatives 38<br/>4.2.4 Model Implementation 39<br/>A questionnaire as given in Annexure 4 was given to the equipment selection team for<br/>ranking of the three pumps as Good, Fair or Bad . 41<br/>Chapter 5: Summary and Conclusion 42<br/>Chapter 6: Future Scope 43<br/>References 44<br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Sanghvi, Amar (Guide) |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Devkar, Ganesh (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | 2014 Batch |
891 ## - Topic | |
Topic | Construction planning and Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 03/02/2021 | Faculty of Technology | CPM TH-0381 GRE | 022594 | 03/02/2021 | 03/02/2021 | Thesis |