Selection of concrete pump for building construction (Soft copy is also available) (Record no. 68425)

MARC details
000 -LEADER
fixed length control field 02370nam a22001697a 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CPM TH-0381
Item number GRE
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Grewal, Rajdeep Singh (PT101514)
245 ## - TITLE STATEMENT
Title Selection of concrete pump for building construction (Soft copy is also available)
300 ## - PHYSICAL DESCRIPTION
Extent 108p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Approval Certificate: i<br/>Declaration ii<br/>Acknowledgement iii<br/>Abstract iv<br/>Chapter 1: Introduction 1<br/>1.1 Background 1<br/>1.2 Need for Study 1<br/>1.3 Objectives 3<br/>1.4 Scope of Study 3<br/>1.5 Methodology 3<br/>1.6 Research Plan 4<br/>Chapter 2: Literature Review 5<br/>2.1 Types of Concrete Pumps 5<br/>2.1.1 Configurations of Concrete pumping Equipment 7<br/>2.2 Factors Affecting Selection of Concrete Pump 9<br/>2.3 Factors Identified for Selection of Concrete Pump 16<br/>2.4 Methods Used for Selection of Equipment/Concrete Pumps 18<br/>2.5 Analytic Hierarchy Process (AHP) 23<br/>2.5.1 Features of AHP 24<br/>2.5.2 AHP Basics 24<br/>2.6 Research Gap 26<br/>Chapter 3: Research Methodology 28<br/>3.1 Framework of the Research 28<br/>3.2 Methodology (for Objective 1) 29<br/>3.2.1 Literature Review 29<br/>3.2.2 Pilot Study 29<br/>3.3 Methodology (for Objective 2) 29<br/>3.3.1 Detailed Study Questionnaire 29<br/>3.3.2 Data Collection 29<br/>3.3.3 Method of Analysis 30<br/>3.4 Model Implementation 30<br/>3.4.1 Data Collection 30<br/>3.4.2 Method of Analysis 30<br/>Chapter 4: Data Collection and Analysis 31<br/>4.1 Analysis of Factors for Selection of Concrete Pump (Objective 1) 31<br/>4.1 1 Factors for Selection of Construction Equipment 31<br/>4.1.2 Factors for Selection of Concrete Pump 31<br/>4.1.2 Factors for Selection of Concrete Pump Identified from Pilot Study 32<br/>4.1.3 Factors for Selection of Concrete Pump 33<br/>4.2 Preparation of Decision Making Model 34<br/>4.2.1 Hierarchy Construction 34<br/>4.2.2 Pairwise Comparisons 35<br/>4.2.3 Survey Questionnaire 36<br/>4.2.3 Scoring of Alternatives 38<br/>4.2.4 Model Implementation 39<br/>A questionnaire as given in Annexure 4 was given to the equipment selection team for<br/>ranking of the three pumps as Good, Fair or Bad . 41<br/>Chapter 5: Summary and Conclusion 42<br/>Chapter 6: Future Scope 43<br/>References 44<br/><br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Sanghvi, Amar (Guide)
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Devkar, Ganesh (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic FT-PG
891 ## - Topic
Topic 2014 Batch
891 ## - Topic
Topic Construction planning and Management
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 03/02/2021 Faculty of Technology CPM TH-0381 GRE 022594 03/02/2021 03/02/2021 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials