Explore treated wastewater reuse options in peri urban area of western part of AUDA boundary : a case of Sanand region, Ahmedabad (Softcopy is also available) (Record no. 68252)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 08051nam a2200193Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 201105s9999 xx 000 0 und d |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | P TH-2465 |
Item number | PAT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Patel, Milan Rajeshkumar (PG180538) |
245 #0 - TITLE STATEMENT | |
Title | Explore treated wastewater reuse options in peri urban area of western part of AUDA boundary : a case of Sanand region, Ahmedabad (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2020 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xvii,162,31p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents <br/>Undertaking i <br/>Certificate iii <br/>Acknowledgements v <br/>Abstract vii <br/>Table of contents ix <br/>List of Figures . xv <br/>List of tables xviii <br/>1 Introduction & Background 1 <br/>1.1 Introduction 1 <br/>1.2 Need for study 3 <br/>2 Research Outline 5 <br/>2.1 Research Questions 5 <br/>2.2 Research Aim 5 <br/>2.3 Research Objectives 5 <br/>2.4 Scope and Limitations 5 <br/>2.4.1 Scope 5 <br/>2.4.2 Limitations 6 <br/>2.5 Research Methodology 6 <br/>3 Literature and Case Study Review 9 <br/>3.1 Wastewater Definition 9 <br/>3.2 Wastewater Components 9 <br/>3.3 What is Wastewater reuse? 10 <br/>3.4 Wastewater reuse: Global trends 10 <br/>3.5 Wastewater reuse importance in SDG 11 <br/>3.6 Wastewater Reuse Scenario in India 12 <br/>3.7 Concept of Urban Wastewater Management 14 <br/>3.8 Wastewater reuse and potential type of users 15 <br/>3.9 Wastewater flows – the cycle of wastewater in water cycle flow 17 <br/>3.9.1 Wastewater flows 18 <br/>3.10 Technical options in treatment levels of wastewater 19 <br/>3.11 Economic and financial benefits of wastewater Recycling and reuse 21 <br/>3.12 Wastewater reuse and cities – Urban Sector 22 <br/>3.13 Wastewater and irrigation – Agriculture sector 23 <br/>3.14 Wastewater reuse and industries: Industrial sector 24 <br/>3.15 Wastewater reuse: Paradigms and governing Key-factors 26 <br/>4 Case-study Review 28 <br/>4.1 Agriculture Case-study Review 28 <br/>4.1.1 Case study – 1: VIjayapura, Bangalore, Karnataka 28 <br/>4.1.2 Case study – 2: Bhuj city– A Wastewater reuse in Agriculture purpose 30 <br/>4.1.3 Case study – 3: Patan city– Registered Motor Pumps of Farmers 32 <br/>4.1.4 Case study – 4: Unjha city– Wastewater Auction System 34 <br/>4.2 Industrial Case-study Review 35 <br/>4.2.1 Case study 1: Nagpur city – wastewater reuse in cooling power plant 36 <br/>4.2.2 Case study 2: Surat City: Wastewater Reuse in Industry 37 <br/>4.3 Landscape Irrigation Case-study Review 40 <br/>4.3.1 Case study 1: Jaychamaraja Wadiyar Golf Course: TWW reuse in Landscape irrigation 40 <br/>5 Ahmedabad City Scenario 43 <br/>5.1 Introduction & City Profile 43 <br/>5.2 Geography & Climate 43 <br/>5.3 AUDA: Roles and Responsibilities. 44 <br/>5.4 Physical Infrastructure Services: Water Supply Scenario 46 <br/>5.5 Urban Sector – AUDA Infrastructural Services 52 <br/>5.6 AUDA Initiatives 52 <br/>5.6.1 Proposals for Decentralized Sewage Treatment Plants 52 <br/>5.6.2 AUDA’s Initiative for lakes filled by the treated wastewater 53 <br/>6 Sanand city – A satellite town 55 <br/>6.1 Introduction 55 <br/>6.1.1 New Approach: Planning of Satellite town – UIDSST SCHEME 56 <br/>6.2 Sanand City Profile 56 <br/>6.3 Location and connectivity 57 <br/>6.4 Topography & climate 58 <br/>6.5 Demographic Profile 59 <br/>6.6 Sanand Growth centre in AUDA DP plan 2021 60 <br/>6.7 Proposed Road Connectivity in Sanand: AUDA DP 2021 62 <br/>6.8 Key stakeholders interaction and Mapping . 63 <br/>6.9 Physical Infrastructure services in Sanand City 64 <br/>6.9.1 Water Supply present Scenario 64 <br/>6.9.2 Sanitation present scenario 72 <br/>6.9.3 Sewage treatment plant: Sanand 75 <br/>6.9.4 Sanitation Scenario comparison of SLB Standards 76 <br/>6.9.5 Storm Water Drainage network in Sanand 77 <br/>6.9.6 Lakes and Sanand city- Environmental Profile 78 <br/>6.10 Agriculture sector – Sanand 80 <br/>6.10.1 Dholka Branch Canal . 80 <br/>6.10.2 Kaneti Sanand sub-branch Canal 81 <br/>6.10.3 Nidharad – Godhavi – Sanand Canal 81 <br/>6.10.4 Data collection from farmers Survey 83 <br/>6.10.5 Groundwater scenario in Sanand 85 <br/>6.11 Industrial Sector – BOL GIDC in Sanand 87 <br/>6.11.1 BOL – Sanand GIDC (Automobile and Engg. Hub) 88 <br/>6.11.2 Water supply in BOL GIDC 90 <br/>6.11.3 Water Demand in BOL GIDC . 92 <br/>6.11.4 AMC-AUDA BOL GIDC Proposed Project details: 92 <br/>6.12 Landscape irrigation sector – Sanand 93 <br/>6.12.1 Landscape irrigation potential users in Sanand 94 <br/>6.12.2 The Kalhaar Blue Greens Golf course – Potential users for using treated wastewater in Landscape irrigation. 95 <br/>7 Wastewater Reuse Suggesting Options & Feasibility Analysis 96 <br/>7.1 Wastewater reuse Potential in Sanand city 96 <br/>7.2 Wastewater reuse works stages 96 <br/>7.2.1 Wastewater reuse - Stage 1 96 <br/>7.2.2 Wastewater Reuse – Stage 2 99 <br/>7.3 Option 1: Proposed Project for industry Sector – BOL GIDC 101 <br/>7.3.1 Project Objective 101 <br/>7.3.2 Project Scope and Components 101 <br/>7.3.3 Description of Site –BOL GIDC 103 <br/>7.3.4 Stakeholders Perceptions – BOL GIDC 103 <br/>7.3.5 Treated wastewater Demand BOL GIDC 104 <br/>7.3.6 Risk Analysis, Project structuring and Bid Process 104 <br/>7.3.7 Possible PPP Frameworks and Preferred options 106 <br/>7.3.8 Benefits of Proposed BOL GIDC <br/>7.3.9 Project finance Analysis – BOL GIDC 109 <br/>7.3.10 Summary of financial Analysis Results 110 <br/>7.3.11 Tariff revenue stream 110 <br/>7.3.12 Financially viable assessment 111 <br/>7.3.13 Value for Money Analysis (VFM Analysis) 112 <br/>7.3.14 NPV of all risks to be added onto a base of the PSC Model 113 <br/>7.3.15 Statement Value for Money . 114 <br/>7.4 Option 2: Proposed Project for Landscape irrigation (Urban Sector) – KBG Project 115 <br/>7.4.1 Project objective 115 <br/>7.4.2 Project scope & components 115 <br/>7.4.3 Description of Site 116 <br/>7.4.4 Stakeholders Perceptions – KBG Project 117 <br/>7.4.5 Water demand in KBG Golf Course . 117 <br/>7.4.6 Risk Analysis, Project structuring and Bid Variable 118 <br/>7.4.7 Possible PPP structures and preferred options for KBG Project 119 <br/>7.4.8 Terms and conditions of the project 121 <br/>7.4.9 Benefits of the proposed project structure 122 <br/>7.4.10 Project Financial Analysis – KBG Project . 123 <br/>7.4.11 Summary of the Financial Analysis Results 123 <br/>7.4.12 Tariff Revenue Stream 124 <br/>7.4.13 Benefits to Sanand Nagarpalika: . 125 <br/>7.5 Option 3: Proposed Project for Agriculture Sector – for irrigation use 125 <br/>7.5.1 Project Objective 125 <br/>7.5.2 Project Scope & Components 126 <br/>7.5.3 Case – 1: Wastewater Auction System 127 <br/>7.5.4 Case – 2: Wastewater selling by registered Motor pumps 128 <br/>7.5.5 CASE -3:- Treated wastewater discharging into an open drain 129 <br/>7.6 Feasibility Analysis 130 <br/>7.6.1 Identify the potential reclaimed & reuse wastewater users 130 <br/>7.6.2 Social Feasibility 132 <br/>7.6.3 Technical Feasibility 136 <br/>7.6.4 Economic Feasibility 140 <br/>7.6.5 Environmental Feasibility 143 <br/>7.6.6 Summary 145 <br/>8 Conclusions & Recommendations 146 <br/>8.1 Institutional Level and Governance level 147 <br/>8.2 Laws and Policy Level 148 <br/>8.3 Technical Level 149 <br/>8.4 Financial and economy Level 149 <br/>8.5 Social Level. 150 <br/>8.5.1 Diminishing public health risk 152 <br/>8.5.2 Fostering Social Acceptance 153 <br/>8.6 Environmental Level 153 <br/>8.7 Way Forward 155 <br/>References 156 <br/>Appendix 158<br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Bandyopadhyay, Saswat (Guide) |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Jagani, Ashwin M. (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2018 Batch |
891 ## - Topic | |
Topic | FP-PG |
891 ## - Topic | |
Topic | Master of Urban Infrastructure Planning |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Planning | CEPT Library | CEPT Library | 06/11/2020 | Faculty of Planning | P TH-2465 PAT | 022932 | 05/11/2020 | 05/11/2020 | Thesis |