Factors responsible for selection of construction methodology for underground metro stations (Soft copy is also available) (Record no. 56527)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02536nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 190808s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0798 |
Item number | MAH |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Mahadik, Jayesh Sharad (UC2214) |
245 #0 - TITLE STATEMENT | |
Title | Factors responsible for selection of construction methodology for underground metro stations (Soft copy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2019 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ix,a,vi,53p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>1. INTRODUCTION 1<br/>1.1. Overview 1<br/>1.2. Background 1<br/>1.3. Need for the study 1<br/>1.4. Objective of the study 1<br/>1.5. Scope of Work 1<br/>1.6. Research Methodology 2<br/>1.6.1. Literature Study 2<br/>1.6.2. Selection of Case studies 2<br/>1.6.1. Case Studies selected and Criteria for Selection 2<br/>1.6.2. Criteria for Selection of case study 2<br/>1.6.3. Data Collection 3<br/>1.6.4. Data Analysis 3<br/>1.7. Timeline of study 3<br/>2. LITERATURE REVIEW 4<br/>2.1. Underground Metro Stations Construction Methodologies 4<br/>2.2. Top-Down Method of Construction 4<br/>2.2.1. procedure 4<br/>2.2.2. advantages [3] 5<br/>2.2.3. disadvantages [3] 5<br/>2.3. Bottom-up Method of Construction 9<br/>2.3.1. Advantages [5] 10<br/>2.3.2. disadvantages [5] 10<br/>3. DATA COLLECTION 13<br/>3.1. METHODOLOGY OF DATA COLLECTION 13<br/>3.2. Case Studies selected and Criteria for Selection 13<br/>3.2.1. Criteria for Selection 13<br/>4. CASE STUDY DETAILS OF UNDERGROUND METRO STATION BY TOP-DOWN METHOD 14<br/>4.1. AHMEDABAD METRO EAST-WEST LINE 14<br/>4.2. UG-1 Package CASE STUDY DETAILS 15<br/>4.2.1. Project Alignment 15<br/>4.2.2. Project Cost Breakdown 16<br/>4.2.3. Kalupur Station Box Details 16<br/>4.3. Factors responsible for selection of construction methodology 16<br/>4.3.1. Soil Strata 19<br/>4.3.2. Time and Cost of Construction 19<br/>4.4. UG-2 Package CASE STUDY DETAILS 23<br/>4.4.1. Project Alignment 23<br/>4.4.2. Project Cost Breakdown 24<br/>4.4.3. GHEEKANTA Station Box Details 24<br/>4.5. Factors responsible for selection of construction methodology 24<br/>4.5.1. Soil Strata 29<br/>4.5.2. Time and Cost of Construction 29<br/>4.5.3. Space Constraints 31<br/>4.5.4. Conclusion of parameters 32<br/>5. CASE STUDY DETAILS OF UNDERGROUND METRO STATION BY BOTTOM-UP METHOD 32<br/>5.1. MUMBAI METRO LINE-3 32<br/>5.2. UGC-04 Package CASE STUDY DETAILS 33<br/>5.2.1. Dadar Station Box Details 33<br/>5.2.2. Project Alignment 33<br/>5.2.1. Project Cost Breakdown 34<br/>5.3. Factors responsible for selection of construction methodology 34<br/>5.3.1. Soil Strata 37<br/>5.3.2. Time and Cost of Construction 37<br/>5.3.3. Availability of Equipment 41<br/>5.3.4. Conclusion of parameters 41<br/>6. CONCLUSION 42<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shah, Paresh (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | FT-UG |
891 ## - Topic | |
Topic | 2014 Batch |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/08/2019 | Faculty of Technology | B TH-0798 MAH | 021324 | 08/08/2019 | 08/08/2019 | Thesis |