Evaluating the level of integration in design process : silo-based design to integrated design approach (Softcopy is also available) (Record no. 56477)

MARC details
000 -LEADER
fixed length control field 03145nam a22001697a 4500
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CPM TH-0330
Item number GAT
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Gattani, Disha (PT100817)
245 ## - TITLE STATEMENT
Title Evaluating the level of integration in design process : silo-based design to integrated design approach (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2019
300 ## - PHYSICAL DESCRIPTION
Extent ii,xvii,125p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS<br/>ABSTRACT I<br/>UNDERTAKING III<br/>CERTIFICATE V<br/>ACKNOWLEDGEMENTS VII<br/>LIST OF FIGURES XIII<br/>LIST OF TABLES XV<br/>LIST OF ABBREVIATIONS XVII<br/>CHAPTER-1: INTRODUCTION 1<br/>1.1 Background 1<br/>1.2 Need for the study 2<br/>1.3 Research aim and objectives 3<br/>1.4 Scope of study 3<br/>1.5 Overview of Research design 4<br/>1.6 Research schedule 5<br/>CHAPTER-2: LITERATURE REVIEW 7<br/>2.1 The nature of the Design Process 7<br/>2.2 Importance of early phase of Design Process 7<br/>2.2.1 Stages in a construction project 8<br/>2.3 Processes followed during the design phase 10<br/>2.3.1 Silo-Design Process (SDP) 10<br/>2.3.2 Limitations of Silo Design Process 10<br/>2.3.3 Integrated Design Process (IDP) 11<br/>2.4 Difference between IDP and IPD 12<br/>2.5 Lean Design 13<br/>2.5.1 The Lean Design Management (LDM) 14<br/>2.6 Understanding Integration 15<br/>2.6.1 The meaning of Integration 15<br/>2.6.2 The current Level of Integration 15<br/>2.6.3 Better integration through evaluation 16<br/>2.7 Synthesis of literature review and research gap 17<br/>CHAPTER-3: METHODOLOGY 19<br/>3.1 Research strategy 19<br/>3.2 Phase I- Identification and validation of Dimensions of Integration 19<br/>3.2.1 Dimensions of Integration from guidelines 19<br/>3.2.2 Semi-structured interviews 19<br/>3.2.3 Final Dimensions of Integration 20<br/>3.3 Phase II- Development of Evaluation framework 20<br/>3.3.1 Performance indicators of each Dimension 20<br/>3.3.2 Weight of each Dimension 20<br/>3.3.3 Scoring Model 20<br/>3.4 Phase III- Framework testing and validation 21<br/>CHAPTER-4: DIMENSIONS OF INTEGRATION 23<br/>4.1 Comparison of professional guidelines of IDP 23<br/>4.2 Analysis of Dimensions of IDP from guidelines 25<br/>4.3 Dimensions of IDP from Interviews 29<br/>4.4 Data Collection and Analysis 30<br/>4.5 Dimensions of Integration 32<br/>4.6 The major barriers for the success of IDP 37<br/>CHAPTER-5: FRAMEWORK FOR EVALUATION OF THE LEVEL OF INTEGRATION 39<br/>5.1 Project Assessment 39<br/>5.2 Standard weights of Dimension- AHP Survey 41<br/>5.2.1 Data collection method 41<br/>5.2.2 Summary of AHP analysis 42<br/>x<br/>5.3 Framework development 45<br/>5.3.1 Scoring model 46<br/>5.4 Evaluation framework testing 53<br/>5.4.1 Project 1 53<br/>5.4.2 Head office of Microfinance Company, Gurugram 59<br/>5.4.3 Project 3 64<br/>CHAPTER-6: CONCLUSION 71<br/>6.1 Limitation 72<br/>6.2 Future Scope of work 72<br/>6.3 Research contribution 73<br/>REFERENCES 75<br/>APPENDIX A: INTERVIEW PROTOCOL 79<br/>APPENDIX B: ANALYSIS OF SEMI-STRUCTURED INTERVIEW 81<br/>APPENDIX C: PROJECT ASSESSMENT QUESTIONNAIRE AND VALUES 87<br/>APPENDIX D: AHP SURVEY QUESTIONNAIRE 97<br/>APPENDIX E: AHP SURVEY ANALYSIS 107<br/>APPENDIX F: SCORING MODEL OF THE PROJECTS 117<br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Devkar, Ganesh (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2017 Batch
891 ## - Topic
Topic FT-PG
891 ## - Topic
Topic Construction and Planning Management
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 05/08/2019 Faculty of Technology CPM TH-0330 GAT 021369 05/08/2019 05/08/2019 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials