Assessing sustainability practices during the construction phase (Softcopy is also available) (Record no. 55133)

MARC details
000 -LEADER
fixed length control field 01865nam a2200181Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180908s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CPM TH-0318
Item number THO
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Thounaojam, Nicola (PT101516)
245 #0 - TITLE STATEMENT
Title Assessing sustainability practices during the construction phase (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2018
300 ## - PHYSICAL DESCRIPTION
Extent x,74p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents<br/>Acknowledgements iii<br/>Abstract iv<br/>List of figures v<br/>List of tables vi<br/>List of abbreviations vii<br/>1. Introduction 1<br/>1.1. General 1<br/>1.2. Background 2<br/>1.3. Problem Statement 3<br/>2. Research Design 5<br/>2.1. Purpose Statement 5<br/>2.2. Objective 5<br/>2.3. Scope of Study 5<br/>2.4. Methodology 6<br/>2.4.1. Phase I- Identification of Sustainability Actions 7<br/>2.4.2. Phase II- Data Collection 9<br/>2.4.3. Phase III- Data Analysis 9<br/>2.5. Research Schedule 10<br/>3. Literature Review 11<br/>3.1. General 11<br/>3.2. Sustainability 11<br/>3.3. Sustainability in Construction 13<br/>3.4. Drivers of Sustainable Construction 15<br/>3.5. Safety-related Sustainability Practices 15<br/>4. Data Collection 22<br/>4.1. Respondents 22<br/>4.2. Questionnaire Survey 24<br/>4.3. Case Study Background 24<br/>5. Data Analysis and Results 27<br/>5.1.General 27<br/>5.2.Survey Analysis 27<br/>5.3. Case Study Analysis 39<br/>5.3.1. Project Management 39<br/>5.3.2. Contracting 39<br/>5.3.3. Field Engineering 39<br/>5.3.4. Site Facilities and Operations 40<br/>5.3.5. Craft Labour Management 40<br/>5.3.6. Material Management 40<br/>5.3.7. Construction Equipment Management 40<br/>5.3.8. Quality Management, Commissioning and Handover 41<br/>5.4. Sustainability Drivers 41<br/>6. Conclusion/ Summary 42<br/>6.1. Conclusion 42<br/>6.2. Limitations 43<br/>6.3. Recommendations for Future Research 44<br/>References 45<br/>Annexures 49
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Devkar, Ganesh (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2016 Batch
891 ## - Topic
Topic FT-PG
891 ## - Topic
Topic Construction and Planning Management
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 08/09/2018 Faculty of Technology CPM TH-0318 THO 020000 08/09/2018 08/09/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials