Risk Assessment and allocation of PPP metro rail projects in India (Softcopy is also available) (Record no. 55132)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02318nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0317 |
Item number | NAV |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Naveen, C. G. (PT101416) |
245 #0 - TITLE STATEMENT | |
Title | Risk Assessment and allocation of PPP metro rail projects in India (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vii,70p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>Acknowledgements iii<br/>Abstract iv<br/>List of Figures v<br/>List of Tables vi<br/>List of Abbreviations vii<br/>1. Introduction 1<br/>1.1. Background 1<br/>1.1.1. Metro Rail System 1<br/>1.1.2. Risks in PPP Projects 2<br/>1.2. Need for Study 4<br/>2. Research Design 5<br/>2.1. Research Objectives 5<br/>2.2. Scope of this Study 5<br/>2.3. Research Methodology 5<br/>2.3.1. Literature Review 5<br/>2.3.2. Data Collection 5<br/>2.3.3. Data Analysis 6<br/>2.4. Research Schedule 6<br/>3. Literature Review 7<br/>3.1. Risk Management in PPP Projects 7<br/>3.2. Need for Risk Allocation 7<br/>3.3. Risk Factor Identification 7<br/>3.4. Risk Factor Categorization 8<br/>3.5. Defintion of Risk Factors 9<br/>3.6. Discussion From Jounrals 11<br/>3.7. Literture Review Table 12<br/>3.8. Learnings from Literature Review 18<br/>3.9. Research Gap 19<br/>4. Methodology 20<br/>4.1. Research Strategy 20<br/>4.2. Identification Phase 20<br/>4.3. Data Collection Phase 21<br/>4.4. Data Analysis Phase 22<br/>5. Data Collection 23<br/>5.1. Questionnaire Survey Design 23<br/>5.1.1. Background of Respondents 23<br/>5.1.2. Section I 23<br/>5.1.3. Section II 23<br/>5.1.4. Section III 23<br/>5.2. Case Study Profile 24<br/>5.2.1. Case Study 1 - Hyderabad Metro Rail - Phase 1 24<br/>5.2.2. Case Study 2 – Mumbai Metro Rail - Line 1 24<br/>5.2.3. Case Study 3 – Gurgaon Rapid Metro Rail – Phase 1 24<br/>5.2.4. Case study 4: Delhi Airport Metro Express Line 25<br/>6. Data Analysis, Results and summary 29<br/>6.1. Respondents Profile 29<br/>6.2. Risk Impact and Significance 30<br/>6.2.1. Analysis and Results 30<br/>6.2.2. Summary 35<br/>6.3. Preferred Risk Allocation 36<br/>6.3.1. Analysis and Results 36<br/>6.3.2. Summary 42<br/>6.4. Actual Rick Allocation of Case Studies 46<br/>6.5. Risk Events in Case Studies 51<br/>7. Conclusion 53<br/>7.1. Conclusion 53<br/>7.2. Limitations 54<br/>7.3. Future Scope 54<br/>8. References 55<br/>Annexure – A 57 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Devkar, Ganesh (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Construction and Planning Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | CPM TH-0317 NAV | 019999 | 08/09/2018 | 08/09/2018 | Thesis |