Risk Assessment and allocation of PPP metro rail projects in India (Softcopy is also available) (Record no. 55132)

MARC details
000 -LEADER
fixed length control field 02318nam a2200181Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180908s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CPM TH-0317
Item number NAV
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Naveen, C. G. (PT101416)
245 #0 - TITLE STATEMENT
Title Risk Assessment and allocation of PPP metro rail projects in India (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2018
300 ## - PHYSICAL DESCRIPTION
Extent vii,70p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents<br/>Acknowledgements iii<br/>Abstract iv<br/>List of Figures v<br/>List of Tables vi<br/>List of Abbreviations vii<br/>1. Introduction 1<br/>1.1. Background 1<br/>1.1.1. Metro Rail System 1<br/>1.1.2. Risks in PPP Projects 2<br/>1.2. Need for Study 4<br/>2. Research Design 5<br/>2.1. Research Objectives 5<br/>2.2. Scope of this Study 5<br/>2.3. Research Methodology 5<br/>2.3.1. Literature Review 5<br/>2.3.2. Data Collection 5<br/>2.3.3. Data Analysis 6<br/>2.4. Research Schedule 6<br/>3. Literature Review 7<br/>3.1. Risk Management in PPP Projects 7<br/>3.2. Need for Risk Allocation 7<br/>3.3. Risk Factor Identification 7<br/>3.4. Risk Factor Categorization 8<br/>3.5. Defintion of Risk Factors 9<br/>3.6. Discussion From Jounrals 11<br/>3.7. Literture Review Table 12<br/>3.8. Learnings from Literature Review 18<br/>3.9. Research Gap 19<br/>4. Methodology 20<br/>4.1. Research Strategy 20<br/>4.2. Identification Phase 20<br/>4.3. Data Collection Phase 21<br/>4.4. Data Analysis Phase 22<br/>5. Data Collection 23<br/>5.1. Questionnaire Survey Design 23<br/>5.1.1. Background of Respondents 23<br/>5.1.2. Section I 23<br/>5.1.3. Section II 23<br/>5.1.4. Section III 23<br/>5.2. Case Study Profile 24<br/>5.2.1. Case Study 1 - Hyderabad Metro Rail - Phase 1 24<br/>5.2.2. Case Study 2 – Mumbai Metro Rail - Line 1 24<br/>5.2.3. Case Study 3 – Gurgaon Rapid Metro Rail – Phase 1 24<br/>5.2.4. Case study 4: Delhi Airport Metro Express Line 25<br/>6. Data Analysis, Results and summary 29<br/>6.1. Respondents Profile 29<br/>6.2. Risk Impact and Significance 30<br/>6.2.1. Analysis and Results 30<br/>6.2.2. Summary 35<br/>6.3. Preferred Risk Allocation 36<br/>6.3.1. Analysis and Results 36<br/>6.3.2. Summary 42<br/>6.4. Actual Rick Allocation of Case Studies 46<br/>6.5. Risk Events in Case Studies 51<br/>7. Conclusion 53<br/>7.1. Conclusion 53<br/>7.2. Limitations 54<br/>7.3. Future Scope 54<br/>8. References 55<br/>Annexure – A 57
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Devkar, Ganesh (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2016 Batch
891 ## - Topic
Topic FT-PG
891 ## - Topic
Topic Construction and Planning Management
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 08/09/2018 Faculty of Technology CPM TH-0317 NAV 019999 08/09/2018 08/09/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials