Study and appraisal of hybrid annuity model for Gujarat state highway development (Softcopy is also available) (Record no. 55131)

MARC details
000 -LEADER
fixed length control field 03458nam a2200193Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180908s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CPM TH-0316
Item number MEH
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Mehta, Vruja (PT101316)
245 #0 - TITLE STATEMENT
Title Study and appraisal of hybrid annuity model for Gujarat state highway development (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2018
300 ## - PHYSICAL DESCRIPTION
Extent ix,91p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents<br/>Acknowledgements iv<br/>Abstract v<br/>List of figures vi<br/>List of tables vii<br/>List of Abbreviations ix<br/>1. Introduction 1<br/>1.1. Background 1<br/>1.1.1. Risk Sharing Policy for Different Models 2<br/>1.2. Need For The Study 3<br/>1.3. Expected Outcomes 3<br/>1.4. Description to access to resources 4<br/>2. Research domain 5<br/>2.1. Objectives 5<br/>2.2. Scope 5<br/>2.3.Research Methodology 6<br/>2.4.Research Schedule 6<br/>3. Literature review 7<br/>3.1. Preliminary Literature Review 7<br/>3.2. What is Hybrid Annuity Model 12<br/>3.3. Why HAM is Important 13<br/>3.4. Issues in PPP Projects 13<br/>3.5. Types of Risks and Their Financial Effects 14<br/>3.6. Output Indicators from Different stakeholders’ Perspective 16<br/>3.7. Major factors affecting success of the PPP projects 17<br/>3.8. Research Gap 32<br/>4. Research methodology 33<br/>4.1. Brief of Methodology 33<br/>4.2.Factor Analysis Method 33<br/>5. Data Collection 36<br/>5.1. Questionnaire Survey 36<br/>5.1.1. Quantitative Questionnaire 36<br/>5.1.2. Qualitative Questions 38<br/>5.1.3. About Respondents 39<br/>5.2. Case Study data collection 41<br/>5.2.1. Introduction 41<br/>5.2.2. Salient Features about Case Study 42<br/>5.2.3. Configuration of Project Road by Different Sections 42<br/>6. Data analysis 44<br/>6.1. Statistical Analysis 44<br/>6.1.1. Bartlett’s test for sphericity and KMO test 44<br/>6.1.2. Factor reduction (RII method) 44<br/>6.1.3. Factors comparison table 47<br/>6.1.4. Final remaining factors 49<br/>6.1.5. Correlation Matrix 50<br/>6.1.6. Total Variance explained (Extracted Factors) 51<br/>6.1.7. Rotated component matrix 52<br/>6.1.8. Major categories obtained after Analysis 53<br/>6.1.9.Validity test 54<br/>6.1.10. Mann-Whitney U Test 54<br/>6.2. Qualitative questionnaire Analysis 56<br/>6.3. Bid process for HAM 59<br/>6.3.1.Financial closure 59<br/>6.4. Financial Analysis of State Highway Project 60<br/>6.4.1.Assumptions 60<br/>6.4.2.Results of BOT Annuity and Modified Annuity Model 61<br/>6.4.3.Difference in terms of all three models 63<br/>7. Exploration and findings 65<br/>7.1. Hybrid Annuity Model 65<br/>7.1.1.All schedules of HAM 66<br/>7.1.2.Total Project cost Calculations 67<br/>7.1.3.Construction support calculations 68<br/>7.1.4.NHAI bid for O&M and Construction support calculations 69<br/>7.1.5.Annuity Payment and O&M payments calculations 70<br/>7.1.6.Debt repayment and DSCR 71<br/>7.1.7.Depreciation and Tax 72<br/>7.1.8.Profit After Tax 73<br/>7.1.9.Balance sheet 74<br/>7.1.10. Cash Flow of project and Equity 75<br/>7.1.11. Final Parameters 76<br/>7.2.Comparison of Modified Annuity Model and Hybrid Annuity Model 77<br/>7.2.1. Patterns for payments in MAM and HAM 77<br/>7.2.2.Why this project is awarded on Modified Annuity Model 78<br/>7.2.3.How HAM is beneficial than MAM 78<br/>7.3.Alternative Analysis 79<br/>7.3.1.Debt Equity Ratio 79<br/>7.3.2.Upfront Support 80<br/>7.3.3.Initial Equity 81<br/>7.3.4.Interest Rate 82<br/>8. Conclusion 84<br/>8.1. Optimal HAM solution 84<br/>9. Future scope 86<br/>References 87<br/>Annexures 89
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Deshmukh, Sagar (Guide)
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Trivedi, Jyoti (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2016 Batch
891 ## - Topic
Topic FT-PG
891 ## - Topic
Topic Construction and Planning Management
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 08/09/2018 Faculty of Technology CPM TH-0316 MEH 019998 08/09/2018 08/09/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials