Study and appraisal of hybrid annuity model for Gujarat state highway development (Softcopy is also available) (Record no. 55131)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03458nam a2200193Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0316 |
Item number | MEH |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Mehta, Vruja (PT101316) |
245 #0 - TITLE STATEMENT | |
Title | Study and appraisal of hybrid annuity model for Gujarat state highway development (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ix,91p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>Acknowledgements iv<br/>Abstract v<br/>List of figures vi<br/>List of tables vii<br/>List of Abbreviations ix<br/>1. Introduction 1<br/>1.1. Background 1<br/>1.1.1. Risk Sharing Policy for Different Models 2<br/>1.2. Need For The Study 3<br/>1.3. Expected Outcomes 3<br/>1.4. Description to access to resources 4<br/>2. Research domain 5<br/>2.1. Objectives 5<br/>2.2. Scope 5<br/>2.3.Research Methodology 6<br/>2.4.Research Schedule 6<br/>3. Literature review 7<br/>3.1. Preliminary Literature Review 7<br/>3.2. What is Hybrid Annuity Model 12<br/>3.3. Why HAM is Important 13<br/>3.4. Issues in PPP Projects 13<br/>3.5. Types of Risks and Their Financial Effects 14<br/>3.6. Output Indicators from Different stakeholders’ Perspective 16<br/>3.7. Major factors affecting success of the PPP projects 17<br/>3.8. Research Gap 32<br/>4. Research methodology 33<br/>4.1. Brief of Methodology 33<br/>4.2.Factor Analysis Method 33<br/>5. Data Collection 36<br/>5.1. Questionnaire Survey 36<br/>5.1.1. Quantitative Questionnaire 36<br/>5.1.2. Qualitative Questions 38<br/>5.1.3. About Respondents 39<br/>5.2. Case Study data collection 41<br/>5.2.1. Introduction 41<br/>5.2.2. Salient Features about Case Study 42<br/>5.2.3. Configuration of Project Road by Different Sections 42<br/>6. Data analysis 44<br/>6.1. Statistical Analysis 44<br/>6.1.1. Bartlett’s test for sphericity and KMO test 44<br/>6.1.2. Factor reduction (RII method) 44<br/>6.1.3. Factors comparison table 47<br/>6.1.4. Final remaining factors 49<br/>6.1.5. Correlation Matrix 50<br/>6.1.6. Total Variance explained (Extracted Factors) 51<br/>6.1.7. Rotated component matrix 52<br/>6.1.8. Major categories obtained after Analysis 53<br/>6.1.9.Validity test 54<br/>6.1.10. Mann-Whitney U Test 54<br/>6.2. Qualitative questionnaire Analysis 56<br/>6.3. Bid process for HAM 59<br/>6.3.1.Financial closure 59<br/>6.4. Financial Analysis of State Highway Project 60<br/>6.4.1.Assumptions 60<br/>6.4.2.Results of BOT Annuity and Modified Annuity Model 61<br/>6.4.3.Difference in terms of all three models 63<br/>7. Exploration and findings 65<br/>7.1. Hybrid Annuity Model 65<br/>7.1.1.All schedules of HAM 66<br/>7.1.2.Total Project cost Calculations 67<br/>7.1.3.Construction support calculations 68<br/>7.1.4.NHAI bid for O&M and Construction support calculations 69<br/>7.1.5.Annuity Payment and O&M payments calculations 70<br/>7.1.6.Debt repayment and DSCR 71<br/>7.1.7.Depreciation and Tax 72<br/>7.1.8.Profit After Tax 73<br/>7.1.9.Balance sheet 74<br/>7.1.10. Cash Flow of project and Equity 75<br/>7.1.11. Final Parameters 76<br/>7.2.Comparison of Modified Annuity Model and Hybrid Annuity Model 77<br/>7.2.1. Patterns for payments in MAM and HAM 77<br/>7.2.2.Why this project is awarded on Modified Annuity Model 78<br/>7.2.3.How HAM is beneficial than MAM 78<br/>7.3.Alternative Analysis 79<br/>7.3.1.Debt Equity Ratio 79<br/>7.3.2.Upfront Support 80<br/>7.3.3.Initial Equity 81<br/>7.3.4.Interest Rate 82<br/>8. Conclusion 84<br/>8.1. Optimal HAM solution 84<br/>9. Future scope 86<br/>References 87<br/>Annexures 89 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Deshmukh, Sagar (Guide) |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Trivedi, Jyoti (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Construction and Planning Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | CPM TH-0316 MEH | 019998 | 08/09/2018 | 08/09/2018 | Thesis |