Life cycle cost analysis of prestressed precast concrete pavement : a case study of MBSIR (Softcopy is also available) (Record no. 55127)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02685nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0312 |
Item number | KAN |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Kansagra, Shrujal (PT100916) |
245 #0 - TITLE STATEMENT | |
Title | Life cycle cost analysis of prestressed precast concrete pavement : a case study of MBSIR (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xi,108p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>Acknowledgement IV<br/>Abstract V<br/>List OF Tables VIII<br/>List of Figures X<br/>List of Abbreviations XI<br/>1. Introduction 1<br/>1.1 General 1<br/>1.2 Need for study 1<br/>1.3 About MBSIR (Mandal Bechraji Special Investment Region) 3<br/>1.4 Objective 3<br/>1.5 Methodology 4<br/>1.6 Scope of study 8<br/>2. Literature review 9<br/>2.1Prestressed precast concrete pavement (PPCP) 9<br/>2.2Performance and evaluation of PPCP 9<br/>2.3 Life cycle cost analysis 10<br/>2.4 Precast Prestressed Concrete Pavement (PPCP) construction methodology 11<br/>2.4.1 Prestressting tendons 14<br/>2.4.2 System for post tensioning 14<br/>2.4.3 Prestress losses for post tensioning 14<br/>2.4.4 Installation of PPCP 15<br/>2.4.4.1 Panel-base interface 17<br/>2.4.4.2 Panel placement 18<br/>2.4.4.3 Tendon duct grouting 19<br/>2.4.4.4 Section anchoring 19<br/>2.4.4.5 Panel undersealing 19<br/>2.4.4.6 Joint sealing 19<br/>2.4.4.7 Surface treatment 19<br/>2.5 Cast in situ concrete pavement construction methodology 20<br/>2.5.1 Types of cast in-situ pavement 20<br/>2.5.2 Construction procedure 20<br/>2.5.2.1 Preparation of sub grade 21<br/>2.5.2.2 Preparation of granular sub base 21<br/>2.5.2.3 Preparation of WMM 22<br/>2.5.2.4 DLC construction 22<br/>2.5.2.5 PQC construction 23<br/>3. Life Cycle Cost Analysis (LCCA) 25<br/>3.1 Discount rate 25<br/>3.2 Analysis period 25<br/>3.3 Net Present Value 26<br/>3.4 Direct owner/ agency cost 26<br/>3.5 User cost 27<br/>4. LCCA model 29<br/>4.1 Cost of PPCP 32<br/>4.1.1 Quantity of panels 34<br/>4.1.2 Estimation of duration for casting of slabs in yard 36<br/>4.1.3 Estimation of duration required for placing and post tensioning 36<br/>4.1.4 Land rental 38<br/>4.1.5 Prestress yard setup 38<br/>4.1.6 Operating cost of plants and machines 40<br/>4.1.7 Man power for prestress yard 46<br/>4.1.8 Cost of materials 47<br/>4.1.9 Base and sub-base layers 49<br/>4.1.10 Transportation, Placing and Post-tensioning of panels 50<br/>4.1.11 Joints Sealing 53<br/>4.1.12 Total cost of construction OF PPCP 53<br/>4.1.13 Maintenance cost 54<br/>4.1.14 Life cycle cost of PPCP 56<br/>4.2 Cost of JRCP 57<br/>4.2.1 Maintenance cost of JRCP 62<br/>4.2.2 Life cycle cost of JRCP 64<br/>5. Comparison (PPVP & JRCP) 65<br/>6. Conclusion 71<br/>References 73<br/>Annexure/Appendix 75 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Sheth, Anal (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Construction and Planning Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | CPM TH-0312 KAN | 019994 | 08/09/2018 | 08/09/2018 | Thesis |