Resource management for construction projects (Softcopy is also available) (Record no. 55126)

MARC details
000 -LEADER
fixed length control field 02144nam a2200181Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180908s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number CPM TH-0311
Item number BAT
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Bhatt, Isha D. (PT100816)
245 #0 - TITLE STATEMENT
Title Resource management for construction projects (Softcopy is also available)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2018
300 ## - PHYSICAL DESCRIPTION
Extent vii,85p.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents<br/>Acknowledgements iii<br/>Abstract iv<br/>List of figures v<br/>List of tables vii<br/>1. Introduction 1<br/>1.1. Background 1<br/>1.2. Need for the Study 2<br/>2. Research Design 3<br/>2.1. Research Aim 3<br/>2.2. Purpose 3<br/>2.3. Objectives of the Research 3<br/>2.4. Scope of this Study 3<br/>2.5. Research Design Process 3<br/>2.5.1. Philosophical Knowledge Claims 4<br/>2.5.2.Research Design 5<br/>2.5.3.Research Methods/Strategies 6<br/>2.6. Design Science Approach 8<br/>2.7. Research Methodology 9<br/>2.8. Research Schedule 10<br/>3. Resource Management Issues in Construction Projects 11<br/>3.1. Literature Review 11<br/>3.1.1.Resource Management 11<br/>3.1.2.Problem Identification: Current issues in resource management 15<br/>3.1.3.Factors influencing efficiency in construction 17<br/>3.1.4.Waste in construction projects. 18<br/>3.1.5.Potential Solution: Lean Management 19<br/>3.2. Research Gap 23<br/>3.3. Data Collection 39<br/>3.3.1. Semi Structured Interviews for Construction Site Issues 39<br/>3.3.2. Respondents Details 41<br/>3.4. Data Analysis 44<br/>3.4.1. Interpretations and Findings 45<br/>4. Development of Conceptual Framework 49<br/>4.1. Introduction 49<br/>4.2.Overview of Last Planner System 50<br/>4.3. Current Scenario: Topdown Approach 52<br/>4.4. Role and Responsibilities 58<br/>4.5. Proposed Framework: Bottom-Up Approach 65<br/>4.6. Interface for Proposed Framework: Mockups 68<br/>4.6.1. Existing Features of VisiLean 68<br/>4.6.2. Proposed Interfaces 70<br/>4.7. Comparison of Traditional and Proposed Scenarios 77<br/>5. Validation and Feedback 78<br/>5.1. Introduction 78<br/>5.2. Feedback 78<br/>5.3. Validation 79<br/>6. Conclusion and Future Scope 81<br/>6.1. Conclusion 81<br/>6.2. Future Scope 82<br/>References 83
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Dave, Bhargav (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2016 Batch
891 ## - Topic
Topic FT-PG
891 ## - Topic
Topic Construction and Planning Management
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 08/09/2018 Faculty of Technology CPM TH-0311 BAT 019993 08/09/2018 08/09/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials