Resource management for construction projects (Softcopy is also available) (Record no. 55126)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02144nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0311 |
Item number | BAT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Bhatt, Isha D. (PT100816) |
245 #0 - TITLE STATEMENT | |
Title | Resource management for construction projects (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vii,85p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>Acknowledgements iii<br/>Abstract iv<br/>List of figures v<br/>List of tables vii<br/>1. Introduction 1<br/>1.1. Background 1<br/>1.2. Need for the Study 2<br/>2. Research Design 3<br/>2.1. Research Aim 3<br/>2.2. Purpose 3<br/>2.3. Objectives of the Research 3<br/>2.4. Scope of this Study 3<br/>2.5. Research Design Process 3<br/>2.5.1. Philosophical Knowledge Claims 4<br/>2.5.2.Research Design 5<br/>2.5.3.Research Methods/Strategies 6<br/>2.6. Design Science Approach 8<br/>2.7. Research Methodology 9<br/>2.8. Research Schedule 10<br/>3. Resource Management Issues in Construction Projects 11<br/>3.1. Literature Review 11<br/>3.1.1.Resource Management 11<br/>3.1.2.Problem Identification: Current issues in resource management 15<br/>3.1.3.Factors influencing efficiency in construction 17<br/>3.1.4.Waste in construction projects. 18<br/>3.1.5.Potential Solution: Lean Management 19<br/>3.2. Research Gap 23<br/>3.3. Data Collection 39<br/>3.3.1. Semi Structured Interviews for Construction Site Issues 39<br/>3.3.2. Respondents Details 41<br/>3.4. Data Analysis 44<br/>3.4.1. Interpretations and Findings 45<br/>4. Development of Conceptual Framework 49<br/>4.1. Introduction 49<br/>4.2.Overview of Last Planner System 50<br/>4.3. Current Scenario: Topdown Approach 52<br/>4.4. Role and Responsibilities 58<br/>4.5. Proposed Framework: Bottom-Up Approach 65<br/>4.6. Interface for Proposed Framework: Mockups 68<br/>4.6.1. Existing Features of VisiLean 68<br/>4.6.2. Proposed Interfaces 70<br/>4.7. Comparison of Traditional and Proposed Scenarios 77<br/>5. Validation and Feedback 78<br/>5.1. Introduction 78<br/>5.2. Feedback 78<br/>5.3. Validation 79<br/>6. Conclusion and Future Scope 81<br/>6.1. Conclusion 81<br/>6.2. Future Scope 82<br/>References 83 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Dave, Bhargav (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Construction and Planning Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | CPM TH-0311 BAT | 019993 | 08/09/2018 | 08/09/2018 | Thesis |