Analysis of waste in design process of indian building projects (Softcopy is also available) (Record no. 55121)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02420nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0306 |
Item number | BHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Bhatia, Husain (PT100316) |
245 #0 - TITLE STATEMENT | |
Title | Analysis of waste in design process of indian building projects (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vi,102p.,4sheets |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Contents<br/>Acknowledgement iii<br/>Abstract iv<br/>List of Figures v<br/>List of Tables vi<br/>List of Abbreviations vii<br/>1. Introduction 1<br/>1.1 Work Outline 1<br/>1.2 Need of Study 2<br/>2. Research Design 3<br/>2.1 Objective of Study 3<br/>2.2 Scope of Study 3<br/>2.3 Preliminary Literature Review 3<br/>2.3.1 Lean Thinking 3<br/>2.3.2 Lean Construction 3<br/>2.3.3 Lean Design 4<br/>2.4 Research Methodology 4<br/>2.5 Preliminary Study Outcome 5<br/>2.6 Thesis Schedule 5<br/>3. Literature Review 7<br/>3.1 Traditional Design Process 7<br/>3.2 Lean Production System 7<br/>3.3 Lean Design 9<br/>3.4 Waste 10<br/>3.5 Waste Drivers 11<br/>3.6 Literature Review Table 20<br/>3.7 Research Gap 26<br/>4. Data Collection and Analysis 27<br/>4.1 Case 1: Design Process of Commercial Building 30<br/>4.1.1 Steps of Design process with Relationships 30<br/>4.1.2 Identification of Value Adding, Non-Value Adding and Non-Value Adding but Necessary Activities 36<br/>4.1.3 Value Stream Map 42<br/>4.2 Case 2: Design Process of a Hospital Building 46<br/>4.2.1 Steps of Design process with Relationships 46<br/>4.2.2 Identification of Value Adding, Non-Value Adding and Non-Value Adding but Necessary Activities 49<br/>4.2.3 Value Stream Map 53<br/>4.3 Case 3: Design Process of Residential Building 56<br/>4.3.1 Steps of Design process with Relationships 56<br/>4.3.2 Identification of Value Adding, Non-Value Adding and Non-Value Adding but Necessary Activities 59<br/>4.3.3 Value Stream Map 62<br/>4.4 Case 4: Design Process of Hotel 65<br/>4.4.1 Steps of Design process with Relationships 65<br/>4.4.2 Identification of Value Adding, Non-Value Adding and Non-Value Adding but Necessary Activities 68<br/>4.4.3 Value Stream Map 72<br/>4.5 Comparison of Durations 75<br/>4.6 Questionnaire Survey 76<br/>5. Result and Discussion 79<br/>5.1 Questionnaire Data Analysis 79<br/>5.2 Summary of Wastes 87<br/>5.3 Suggestions 87<br/>5.4 Summary of findings 89<br/>6. Conclusion 90<br/>7.1 Future Research 90<br/>7. References 92<br/>Annexure 94 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Devkar, Ganesh (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Construction and Planning Management |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | CPM TH-0306 BHA | 019988 | 08/09/2018 | 08/09/2018 | Thesis |