Evaluation of daylight performance of the new workshop building at CEPT university (Softcopy is also available) (Record no. 55071)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03331nam a2200181Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180908s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | MBEP TH-0014 |
Item number | SUN |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Sunger, Vasudha ( PT500916) |
245 #0 - TITLE STATEMENT | |
Title | Evaluation of daylight performance of the new workshop building at CEPT university (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xiv,49p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | Table of Contents <br/>1. Introduction 1 <br/>1.1 Background 1 <br/>1.2 Significance of the study 1 <br/>1.3 Purpose statement 2 <br/>1.4 Research questions 2 <br/>1.5 Research objectives 2 <br/>1.6 Limitations of the study 2 <br/>2. Literature review 2 <br/>2.1 Energy savings from daylighting 3 <br/>2.2 Daylight metrics used in past studies 3 <br/>2.3 Methods for daylight performance investigation 4 <br/>2.4 Standards, codes and guidelines for daylight compliance 5 <br/>2.5 Survey Daylight strategies typically for large scale single storey buildings 6 <br/>2.6 Summary 7 <br/>3. Project Methodology 8 <br/>3.1 Data collection and field measurements 8 <br/>3.1.1 Understanding the design intent of the workshop 8 <br/>3.1.2 Literature Review 8 <br/>3.1.3 Photo documentation 8 <br/>3.1.4 Field measurements 8 <br/>3.1.5 Long-term monitoring: 9 <br/>3.2 3-D modelling and calibration 9 <br/>3.2.1 3-D Modelling, Daylight simulation and its comparison with field measurements 9 <br/>3.2.2 Calibrating the model: 9 <br/>3.2.3 Calibration Process 9 <br/>3.3 Performance Evaluation 11 <br/>3.3.1 Annual Simulation 11 <br/>3.3.2 Shading Analysis 11 <br/>3.3.3 Lighting energy analysis: 11 <br/>3.3.4 Glare Analysis 12 <br/>3.4 Parametric Analysis 12 <br/>4. Analysis and Results 13 <br/>4.1 Field measurements 13 <br/>4.1.1 Readings for PIT results, 4th March, 11:30-1 PM 13 viii <br/>4.1.2 Observations from surface reflectance measurements 13 <br/>4.2 Model calibration 13 <br/>4.2.1 Outside Illuminance-Results 13 <br/>4.2.2 Inside Illuminance 14 <br/>4.2.3 Results for measured and simulated grid after calibration 15 <br/>4.3 Results of Performance Evaluation 17 <br/>4.3.1 Model making and wood studio 17 <br/>4.3.2 Clay studio 17 <br/>4.3.3 Summary 17 <br/>4.5 Annual performance with calibrated model 18 <br/>4.5.1 Results for Spatial Daylight Autonomy 18 <br/>4.5.2 Results for Annual Sun Exposure. 18 <br/>4.5.3 Results for Useful daylight illuminance 18 <br/>4.5.4 Results in section 19 <br/>4.6 Estimation of lighting energy savings 20 <br/>4.6.1 Observations from long-term monitoring data 20 <br/>4.6.2 Lighting energy savings results 20 <br/>4.7 Glare Analysis 21 <br/>4.7.1 Results 21 <br/>4.7.2 Analysis in detail for Point-2 in wood workshop 22 <br/>4.8 Parametric Analysis 24 <br/>4.8.1 Building orientation 24 <br/>4.8.2 Visible Transmittance 25 <br/>4.8.3 Surface reflectance 26 <br/>4.8.4 Exterior roof reflectance- 27 <br/>4.8.5 WIindow to Floor Area ratio - 27 <br/>4.9 Summary of results in the study- 28 <br/>5. Conclusion 30 <br/>References 1 <br/>Appendices 4 <br/>Appendix A 4 <br/>Appendix-B: Building details, measurement details and material list 6 <br/>Appendix-C: daylight simulation and modelling details 22 <br/>Appendix D:Results and analysis 29 <br/>Appendix-E: Rounds of measurement 48 <br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Vaidya, Prasad (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2016 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Masters of Technology in Building Energy Performance |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 08/09/2018 | Faculty of Technology | MBEP TH-0014 SUN | 019870 | 08/09/2018 | 08/09/2018 | Thesis |