Risk identification and risk assessment for the cable stayed bridge projects (Also available on CD) (Record no. 54908)

MARC details
000 -LEADER
fixed length control field 02095nam a2200169Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180822s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-0772
Item number SHU
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Shukla, Shubham (UC6513)
245 #0 - TITLE STATEMENT
Title Risk identification and risk assessment for the cable stayed bridge projects (Also available on CD)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2018
300 ## - PHYSICAL DESCRIPTION
Extent xii, viii, 47p.,CD-ROM
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS<br/>1. THESIS BRIEF 1<br/>1.1 INTRODUCTION 1<br/>1.2 NEED OF THE STUDY 1<br/>1.3 OBJECTIVE OF THE THESIS 1<br/>1.4 SCOPE OF WORK 2<br/>1.5 METHODOLOGY FOR STUDY 2<br/>1.6 LIMITATIONS 2<br/>1.7 THESIS SCHEDULE 3<br/>2. LITERATURE STUDY 4<br/>2.1 BACKGROUND 4<br/>2.2 NEED OF RISK ASSESSMENT IN THE SECTOR OF CABLE STAYED BRIDGE PROJECTS: 5<br/>2.3 RISK & RISK ASSESSMENT 6<br/>2.4 RISK MANAGEMENT VS RISK ASSESSMENT 7<br/>2.5 RISK ASSESSMENT 7<br/>3. DATA COLLECTION 11<br/>3.1 RISK IDENTIFICATION 11<br/>3.2 METHODS FOR DATA COLLECTION 14<br/>3.3 EXPERT OPEN INTERVIEWS 14<br/>3.3.1 INTERVIEW QUESTIONS 14<br/>3.3.2 LIST OF EXPERTS FOR OPEN INTERVIEWS 14<br/>3.3.3 DATA COLLECTION OF EXPERT OPEN INTERVIEWS 15<br/>3.4 DETAILS OF THE CASE STUDIES TAKEN 17<br/>3.4.1 SELECTION CRITIRIA FOR THE CASE STUDIES 17<br/>3.4.2 CASE STUDIES TAKEN 17<br/>3.4.3 DATA COLLECTION FROM THE CASE STUDIES 18<br/>3.5 QUESTIONNAIRE SURVEY 19<br/>3.5.1 INFORMATION OF THE RESPONDENTS 20<br/>4. DATA ANALYSIS 21<br/>4.1 DATA ANALYSIS METHOD 21<br/>4.2 RELIABILITY & VALIDITY OF THE DATA 22<br/>4.3 RISK RANKING BASED ON RII METHOD 23<br/>4.3.1 RISK RANKING BASED ON RII OF IMPACT OF THE RISKS 23<br/>4.3.2 RISK RANKING BASED ON RII OF PROBABILITY OF OCCURRENCE OF THE RISKS 26<br/>4.3.3 RISK RANKING BASED ON RII OF THE PRODUCT OF IMPACT & PROBABILITY OF OCCURRENCE THE RISKS 29<br/>4.4 RISK MITIGATION 31<br/>5. CONCLUSION 33<br/>FUTURE SCOPE OF STUDY 34<br/>REFERENCES 35<br/>APPENDICES 36<br/>APPENDIX 1 – QUESTIONNAIRE 36<br/>APPENDIX 2 – RESPONSES OF THE QUESTIONNAIRE 42<br/>RESPONSES OF THE QUESTIONNAIRE BASED ON IMPACT OF THE RISK 42<br/>RESPONSES OF THE QUESTIONNAIRE BASED ON PROBABILITY OF OCCURRENCE OF THE RISK 45<br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Patel, Jitendra (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2013 Batch
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 22/08/2018 Faculty of Technology B TH-0772 SHU 019829 22/08/2018 22/08/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials