Risk identification and risk assessment for the cable stayed bridge projects (Also available on CD) (Record no. 54908)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02095nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0772 |
Item number | SHU |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Shukla, Shubham (UC6513) |
245 #0 - TITLE STATEMENT | |
Title | Risk identification and risk assessment for the cable stayed bridge projects (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xii, viii, 47p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>1. THESIS BRIEF 1<br/>1.1 INTRODUCTION 1<br/>1.2 NEED OF THE STUDY 1<br/>1.3 OBJECTIVE OF THE THESIS 1<br/>1.4 SCOPE OF WORK 2<br/>1.5 METHODOLOGY FOR STUDY 2<br/>1.6 LIMITATIONS 2<br/>1.7 THESIS SCHEDULE 3<br/>2. LITERATURE STUDY 4<br/>2.1 BACKGROUND 4<br/>2.2 NEED OF RISK ASSESSMENT IN THE SECTOR OF CABLE STAYED BRIDGE PROJECTS: 5<br/>2.3 RISK & RISK ASSESSMENT 6<br/>2.4 RISK MANAGEMENT VS RISK ASSESSMENT 7<br/>2.5 RISK ASSESSMENT 7<br/>3. DATA COLLECTION 11<br/>3.1 RISK IDENTIFICATION 11<br/>3.2 METHODS FOR DATA COLLECTION 14<br/>3.3 EXPERT OPEN INTERVIEWS 14<br/>3.3.1 INTERVIEW QUESTIONS 14<br/>3.3.2 LIST OF EXPERTS FOR OPEN INTERVIEWS 14<br/>3.3.3 DATA COLLECTION OF EXPERT OPEN INTERVIEWS 15<br/>3.4 DETAILS OF THE CASE STUDIES TAKEN 17<br/>3.4.1 SELECTION CRITIRIA FOR THE CASE STUDIES 17<br/>3.4.2 CASE STUDIES TAKEN 17<br/>3.4.3 DATA COLLECTION FROM THE CASE STUDIES 18<br/>3.5 QUESTIONNAIRE SURVEY 19<br/>3.5.1 INFORMATION OF THE RESPONDENTS 20<br/>4. DATA ANALYSIS 21<br/>4.1 DATA ANALYSIS METHOD 21<br/>4.2 RELIABILITY & VALIDITY OF THE DATA 22<br/>4.3 RISK RANKING BASED ON RII METHOD 23<br/>4.3.1 RISK RANKING BASED ON RII OF IMPACT OF THE RISKS 23<br/>4.3.2 RISK RANKING BASED ON RII OF PROBABILITY OF OCCURRENCE OF THE RISKS 26<br/>4.3.3 RISK RANKING BASED ON RII OF THE PRODUCT OF IMPACT & PROBABILITY OF OCCURRENCE THE RISKS 29<br/>4.4 RISK MITIGATION 31<br/>5. CONCLUSION 33<br/>FUTURE SCOPE OF STUDY 34<br/>REFERENCES 35<br/>APPENDICES 36<br/>APPENDIX 1 – QUESTIONNAIRE 36<br/>APPENDIX 2 – RESPONSES OF THE QUESTIONNAIRE 42<br/>RESPONSES OF THE QUESTIONNAIRE BASED ON IMPACT OF THE RISK 42<br/>RESPONSES OF THE QUESTIONNAIRE BASED ON PROBABILITY OF OCCURRENCE OF THE RISK 45<br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Patel, Jitendra (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0772 SHU | 019829 | 22/08/2018 | 22/08/2018 | Thesis |