Study on prequalification criteria adopted for contracotr selection on construction projects (Also available on CD) (Record no. 54899)

MARC details
000 -LEADER
fixed length control field 03916nam a2200169Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180822s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-0763
Item number SHA
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Shah, Jaishil (UC5113)
245 #0 - TITLE STATEMENT
Title Study on prequalification criteria adopted for contracotr selection on construction projects (Also available on CD)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2018
300 ## - PHYSICAL DESCRIPTION
Extent vii,viii,57,2p.,CD-ROM
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS<br/>CHAPTER 1: INTRODUCTION 1<br/>1.1 Background 1<br/>1.2 Need 1<br/>1.3 Research Questions 1<br/>1.4 Objective 1<br/>1.5 Scope 1<br/>1.6 Research Methodology 2<br/>1.6.1 Literature review: 2<br/>1.6.2 Data collection: 2<br/>1.6.3 Data analysis: 2<br/>1.7 Timeline of Study 3<br/>1.8 Limitations 3<br/>CHAPTER 2: LITERATURE REVIEW 5<br/>2.1 Process of Contractor Selection 5<br/>2.2 Initial Review Process 5<br/>2.2.1 Registration process 5<br/>2.2.2 Pre-qualification (two bid system): 6<br/>2.2.3 Post-qualification: 8<br/>2.2.4 Shortlisting: 8<br/>2.3 Method’s For Bid Evaluation 8<br/>2.3.1 Least cost based: 8<br/>2.3.2 Highest quality based: 8<br/>2.3.3 Quality cum cost based (QCBS): 8<br/>2.4 Selection Criteria 8<br/>2.4.1 Selection criteria to evaluate the competence of the contractor 9<br/>2.5 Advantages of Selection Criteria 11<br/>2.6 Prevalent Selection Criteria 12<br/>2.7 Documentary evidence 12<br/>CHAPTER 3: DATA COLLECTION AND OBSERVATIONS 15<br/>3.1 Methodology for Data Collection 15<br/>3.1.1 Primary data 15<br/>3.1.2 Secondary data 15<br/>3.1.3 Selection of case studies 15<br/>3.2 Findings of Case Studies 17<br/>3.2.1 Criteria’s for contractor’s selection for the projects with EPC contracts 17<br/>3.2.2 Criteria for Contractor’s selection for the project with cost plus percentage contract 21<br/>3.2.3 Criteria for contractor’s selection for the projects with item rate contracts 25<br/>3.2.4 Criteria for Contractor’s selection for the projects with DBFOT contracts 27<br/>3.3 Comparison of pre-qualification criteria listed in various funding agency’s guidelines 30<br/>3.4 Primary Data Collection 31<br/>3.4.1 Sample size determination 31<br/>3.4.2 Key findings from the interview: 32<br/>CHAPTER 4: DATA ANALYSIS 35<br/>4.1 Similarity Variation Analysis 35<br/>4.1.1 Similarity variation analysis among case studies for different type of contracts 35<br/>4.1.2 Similarity variation analysis among case studies for different type of projects 38<br/>4.1.3 Similarity variation analysis among guidelines of various funding agencies 39<br/>4.1.4 Similarity variation analysis among case studies and guidelines of funding agencies 40<br/>4.2 Major Findings from Similarity Variation Analysis 42<br/>4.2.1 Findings from the case study 42<br/>4.2.2 Findings from guidelines of various funding agencies 43<br/>4.3 Gap Analysis 43<br/>4.3.1 Gap analysis among case studies for different type of contracts 43<br/>4.3.2 Gap analysis among case studies for different type of projects 45<br/>4.4 Relation across Responses from Client, Contractor & Consultants by Pearson’s product-moment correlation coefficient. 47<br/>4.5 Relation within Responses from Client, Contractor & Consultants by Spearman Brown’s Constant 47<br/>4.6 Relative Importance Index (RII) for opinion Survey 47<br/>4.6.1 Relative Importance Index for Prequalification Criteria 48<br/>4.7 Standard Deviation among opinion of various respondents 48<br/>4.8 Method of Evaluation for Selection of Contractor 49<br/>CHAPTER 5: CONCLUSION 53<br/>CHAPTER 6: RECOMMENDATIONS 55<br/><br/><br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Shah, Reshma (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2013 Batch
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 22/08/2018 Faculty of Technology B TH-0763 SHA 019820 22/08/2018 22/08/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials