Role of project coordination in construction project - Mahatma Mandir : phase - 2A (Also available on CD) (Record no. 54895)

MARC details
000 -LEADER
fixed length control field 04082nam a2200169Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180822s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number B TH-0759
Item number SAN
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Sanghvi, Adhish (UC4713)
245 #0 - TITLE STATEMENT
Title Role of project coordination in construction project - Mahatma Mandir : phase - 2A (Also available on CD)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2018
300 ## - PHYSICAL DESCRIPTION
Extent ix,viii,78p.,CD-ROM
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS<br/>Chapter 1. INTRODUCTION 1<br/>1.1 Background 1<br/>1.2 Need 1<br/>1.3 Objective 1<br/>1.4 Scope 1<br/>1.5 Research Methodology 2<br/>1.5.1 Literature review 2<br/>1.5.2 Data Collection 2<br/>1.5.3 Case study 2<br/>1.5.4 Research Methodology Flowchart 3<br/>1.5.5 Analysis 3<br/>1.6 Timeline of study 3<br/>1.7 Limitations 3<br/>Chapter 2. LITERATURE REVIEW 4<br/>2.1 Introduction 4<br/>2.2 Difference between Project Manager and Project Coordinator 4<br/>2.3 Indian Scenario in Project Coordination 5<br/>2.4 Factors affecting project success 5<br/>2.5 Coordination Activities for Construction Projects 6<br/>2.6 Methods used for successful Project Coordination 7<br/>2.7 PROJECT COORDINATION GOALS 8<br/>Chapter 3. DATA COLLECTION 9<br/>3.1 Methodology for study 9<br/>3.2 Project Introduction 9<br/>3.3 Phasing details 10<br/>3.4 Introduction to Phase – 2A 11<br/>3.4.1 Project Details of Phase – 2A 11<br/>3.5 Design Considerations 12<br/>3.5.1 Salt Mound 12<br/>3.5.2 Area Statement for Phase – 2A 12<br/>3.5.2.1 Provisions in Phase – 2A for Phase – 2B 13<br/>3.5.3 Gandhi Garden 14<br/>3.6 Bifurcation of coordination activities in coordination goals 15<br/>3.7 Critical Issues Identification 21<br/>3.7.1 Study of Pre-Qualification and Price Bid 21<br/>3.7.1.1 List of important dates 21<br/>3.7.1.2 Detailed Scope of work for Phase – 2A 21<br/>3.7.1.3 Bidding process 22<br/>3.7.1.4 Selection of the Contractor 23<br/>3.7.1.5 Bid Clarification 26<br/>3.7.1.6 Price Bid Evaluation 31<br/>3.7.1.7 Overall Evaluation 32<br/>3.7.2 DTP process – Estimates and Bid preparation 32<br/>3.7.2.1 Introduction to DTP process 32<br/>3.7.2.2 Methodology for DTP process 34<br/>3.7.2.3 Additional clauses 34<br/>3.7.2.4 Provision for Price variation 34<br/>3.7.2.5 Comparison of contractor’s bid with project estimate 38<br/>3.7.2.6 General Observations 38<br/>3.7.3 Design Alternatives – Gandhi garden 38<br/>3.7.3.1 Design Concept 38<br/>3.7.3.2 Design Scheme 39<br/>3.7.3.3 Revisions in Gandhi garden 40<br/>3.7.3.4 Techno Commercial Evaluation of retaining wall of Gandhi garden 41<br/>3.7.4 Land Acquisition and Survey of Salt Mound 44<br/>3.7.4.1 Introduction to Salt Mound 44<br/>3.7.4.2 Details of area falling beyond the boundary 44<br/>3.7.4.3 Additional area requirement 45<br/>3.7.4.4 Temporary diversion of road to railway station 46<br/>3.7.4.5 Observations 46<br/>3.7.5 Occurrence of claims - Claim Management 46<br/>3.7.5.1 Relevant Clause 47<br/>3.7.5.2 Methodology of approval of Extra/Excess items 49<br/>3.7.5.3 Cost comparison and division for Civil and Electrical items 49<br/>3.7.5.4 Observations 50<br/>Chapter 4. DATA ANALYSIS 51<br/>4.1 Analysis and Observations of Issues 51<br/>4.1.1 Analysis and Observation of Issue: Study of Prequalification and Price Bid 51<br/>4.1.1.1 Comparison of PQ clauses with guidelines 52<br/>4.1.1.2 General observations and findings 53<br/>4.1.2 Analysis and Observation of Issue: DTP process – Estimates and Bid preparation 53<br/>4.1.2.1 Sample rate analysis comparison with Delhi Schedule of Rates (DSR) 53<br/>4.1.2.2 General observations and findings 56<br/>4.1.3 Analysis and Observation of Issue: Occurrence of claims – Claim Management 56<br/>4.1.3.1 Comparison of the clauses with CPWD guidelines 56<br/>4.1.3.2 General observations and findings 56<br/>4.2 Opinion Survey and analysis 57<br/>4.2.1 Respondents 57<br/>4.2.2 Qualitative interview findings 57<br/>4.2.3 Analysis of the opinion survey and its findings 58<br/>4.2.4 Similarity-Variance analysis and its findings 60<br/>Chapter 5. CONCLUSION 70<br/>5.1 Conclusion 70<br/>5.1.1 Overview 70<br/>5.1.2 Learning from issues 70<br/>Chapter 6. SUGGESTIONS 72<br/>6.1 Suggestions 72<br/>6.2 Scope for future study 72<br/>Chapter 7. References 73<br/>Chapter 8. ANNEXURE 74<br/>Chapter 9. References 79<br/><br/>
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Shah, Reshma (Guide)
890 ## - Country
Country India
891 ## - Topic
Topic 2013 Batch
891 ## - Topic
Topic FT-UG
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     Faculty of Technology   CEPT Library CEPT Library 22/08/2018 Faculty of Technology B TH-0759 SAN 019816 22/08/2018 22/08/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials