Role of project coordination in construction project - Mahatma Mandir : phase - 2A (Also available on CD) (Record no. 54895)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 04082nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0759 |
Item number | SAN |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Sanghvi, Adhish (UC4713) |
245 #0 - TITLE STATEMENT | |
Title | Role of project coordination in construction project - Mahatma Mandir : phase - 2A (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ix,viii,78p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>Chapter 1. INTRODUCTION 1<br/>1.1 Background 1<br/>1.2 Need 1<br/>1.3 Objective 1<br/>1.4 Scope 1<br/>1.5 Research Methodology 2<br/>1.5.1 Literature review 2<br/>1.5.2 Data Collection 2<br/>1.5.3 Case study 2<br/>1.5.4 Research Methodology Flowchart 3<br/>1.5.5 Analysis 3<br/>1.6 Timeline of study 3<br/>1.7 Limitations 3<br/>Chapter 2. LITERATURE REVIEW 4<br/>2.1 Introduction 4<br/>2.2 Difference between Project Manager and Project Coordinator 4<br/>2.3 Indian Scenario in Project Coordination 5<br/>2.4 Factors affecting project success 5<br/>2.5 Coordination Activities for Construction Projects 6<br/>2.6 Methods used for successful Project Coordination 7<br/>2.7 PROJECT COORDINATION GOALS 8<br/>Chapter 3. DATA COLLECTION 9<br/>3.1 Methodology for study 9<br/>3.2 Project Introduction 9<br/>3.3 Phasing details 10<br/>3.4 Introduction to Phase – 2A 11<br/>3.4.1 Project Details of Phase – 2A 11<br/>3.5 Design Considerations 12<br/>3.5.1 Salt Mound 12<br/>3.5.2 Area Statement for Phase – 2A 12<br/>3.5.2.1 Provisions in Phase – 2A for Phase – 2B 13<br/>3.5.3 Gandhi Garden 14<br/>3.6 Bifurcation of coordination activities in coordination goals 15<br/>3.7 Critical Issues Identification 21<br/>3.7.1 Study of Pre-Qualification and Price Bid 21<br/>3.7.1.1 List of important dates 21<br/>3.7.1.2 Detailed Scope of work for Phase – 2A 21<br/>3.7.1.3 Bidding process 22<br/>3.7.1.4 Selection of the Contractor 23<br/>3.7.1.5 Bid Clarification 26<br/>3.7.1.6 Price Bid Evaluation 31<br/>3.7.1.7 Overall Evaluation 32<br/>3.7.2 DTP process – Estimates and Bid preparation 32<br/>3.7.2.1 Introduction to DTP process 32<br/>3.7.2.2 Methodology for DTP process 34<br/>3.7.2.3 Additional clauses 34<br/>3.7.2.4 Provision for Price variation 34<br/>3.7.2.5 Comparison of contractor’s bid with project estimate 38<br/>3.7.2.6 General Observations 38<br/>3.7.3 Design Alternatives – Gandhi garden 38<br/>3.7.3.1 Design Concept 38<br/>3.7.3.2 Design Scheme 39<br/>3.7.3.3 Revisions in Gandhi garden 40<br/>3.7.3.4 Techno Commercial Evaluation of retaining wall of Gandhi garden 41<br/>3.7.4 Land Acquisition and Survey of Salt Mound 44<br/>3.7.4.1 Introduction to Salt Mound 44<br/>3.7.4.2 Details of area falling beyond the boundary 44<br/>3.7.4.3 Additional area requirement 45<br/>3.7.4.4 Temporary diversion of road to railway station 46<br/>3.7.4.5 Observations 46<br/>3.7.5 Occurrence of claims - Claim Management 46<br/>3.7.5.1 Relevant Clause 47<br/>3.7.5.2 Methodology of approval of Extra/Excess items 49<br/>3.7.5.3 Cost comparison and division for Civil and Electrical items 49<br/>3.7.5.4 Observations 50<br/>Chapter 4. DATA ANALYSIS 51<br/>4.1 Analysis and Observations of Issues 51<br/>4.1.1 Analysis and Observation of Issue: Study of Prequalification and Price Bid 51<br/>4.1.1.1 Comparison of PQ clauses with guidelines 52<br/>4.1.1.2 General observations and findings 53<br/>4.1.2 Analysis and Observation of Issue: DTP process – Estimates and Bid preparation 53<br/>4.1.2.1 Sample rate analysis comparison with Delhi Schedule of Rates (DSR) 53<br/>4.1.2.2 General observations and findings 56<br/>4.1.3 Analysis and Observation of Issue: Occurrence of claims – Claim Management 56<br/>4.1.3.1 Comparison of the clauses with CPWD guidelines 56<br/>4.1.3.2 General observations and findings 56<br/>4.2 Opinion Survey and analysis 57<br/>4.2.1 Respondents 57<br/>4.2.2 Qualitative interview findings 57<br/>4.2.3 Analysis of the opinion survey and its findings 58<br/>4.2.4 Similarity-Variance analysis and its findings 60<br/>Chapter 5. CONCLUSION 70<br/>5.1 Conclusion 70<br/>5.1.1 Overview 70<br/>5.1.2 Learning from issues 70<br/>Chapter 6. SUGGESTIONS 72<br/>6.1 Suggestions 72<br/>6.2 Scope for future study 72<br/>Chapter 7. References 73<br/>Chapter 8. ANNEXURE 74<br/>Chapter 9. References 79<br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shah, Reshma (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0759 SAN | 019816 | 22/08/2018 | 22/08/2018 | Thesis |