Study of material handling methods on construction projects (Also available on CD) (Record no. 54893)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02307nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0757 |
Item number | RAW |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Rawat, Krishna (UC4513) |
245 #0 - TITLE STATEMENT | |
Title | Study of material handling methods on construction projects (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xiv,iv,48.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>1 INTRODUCTION 1<br/>1.1 OVERVIEW 1<br/>1.2 BACKGROUND 1<br/>1.3 NEED FOR THE STUDY 1<br/>1.4 OBJECTIVE OF THE STUDY 1<br/>1.5 SCOPE OF WORK 2<br/>1.6 RESEARCH METHODOLOGY 2<br/>1.6.1 LITERATURE STUDY 2<br/>1.6.2 SELECTION OF CASE STUDY 2<br/>1.6.3 DATA COLLECTION 2<br/>1.6.4 DATA ANALYSIS 2<br/>1.7 LIMITATIONS OF THE STUDY 2<br/>1.8 TIMELINE OF THESIS 2<br/>2 LITERATURE REVIEW 3<br/>1.1 MATERIAL HANDLING EQUATION [5] 3<br/>2.1 FACTORS AND CONCERN 3<br/>2.2 TYPES OF MATERIAL HANDLING 3<br/>2.2.1 MANUAL HANDLING [2] 3<br/>2.2.2 MECHANICAL HANDLING [2] 4<br/>2.3 IMPORTANCE OF MATERIAL HANDLING 5<br/>2.4 PRODUCTIVITY 6<br/>2.4.1 PRODUCTIVITY OF LABOURS 6<br/>2.4.2 PRODUCTIVITY OF EQUIPMENT 6<br/>2.5 TIME AND MOTION STUDY [9,10] 7<br/>2.5.1 PROCEDURE[17] 8<br/>2.5.2 DURATION OF A STUDY 8<br/>2.6 SITE LAYOUT 8<br/>2.7 COST OF MATERIAL HANDLING SYSTEM [7] 8<br/>3 DATA COLLECTION 10<br/>3.1 OVERVIEW 10<br/>3.2 DATA COLLECTION METHODOLOGY 10<br/>3.3 DATA COLLECTION FOR FACTOR ANALYSIS 10<br/>3.3.1 QUESTIONNAIRE SURVEY 10<br/>3.4 DATA COLLECTION FOR PRODUCTIVITY ANALYSIS 11<br/>3.4.1 SELECTION OF CASE STUDY 11<br/>3.4.2 SPECIFICATIONS OF TOWER CRANE AND CONCRETE PUMP 12<br/>3.4.3 TIME AND MOTION STUDY FOR TOWER CRANE 15<br/>3.4.4 OBSERVATIONS FOR CONCRETE PUMP 16<br/>3.4.5 OBSERVATIONS FOR MANUAL HANDLING IN STEELYARD 17<br/>4 DATA ANALYSIS & RESULT DISCUSSION 19<br/>4.1 OVERVIEW 19<br/>4.2 RANKING THE FACTORS AFFECTING PRODUCTIVITY 19<br/>4.2.1 TEST OF SOUNDNESS OF DATA 19<br/>4.2.2 DATA ANALYSIS BY RII METHOD 19<br/>4.2.3 SIGNIFICANCE OF FACTOR 22<br/>4.3 TOWER CRANE PRODUCTIVITY 22<br/>4.3.1 TIME CYCLE ANALYSIS 22<br/>4.3.2 SUMMARY 24<br/>4.3.3 RECOMMENDATIONS 25<br/>4.4 CONCRETE PUMP 26<br/>4.4.1 RECOMMENDATIONS 27<br/>4.5 MANUAL HANDLING IN STEEL YARD 28<br/>4.5.1 FINDINGS 28<br/>4.5.2 REASONS AFFECTING PRODUCTIVITY AND SUGGETIONS 28<br/>4.5.3 GENERAL RECOMMENDATION 30<br/>4.6 OWNING AND OPERATING COST 30<br/>5 CONCLUSION 33<br/>6 REFERENCES 34<br/>7 ANNEXURES 35<br/><br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Dave, Manish (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0757 RAW | 019814 | 22/08/2018 | 22/08/2018 | Thesis |