Management system for controlling cost in construction projects (Also available on CD) (Record no. 54890)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02519nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0754 |
Item number | PUR |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Purohit, Yashdeep (UC4213) |
245 #0 - TITLE STATEMENT | |
Title | Management system for controlling cost in construction projects (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xiv,63.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>CHAPTER 1:- INTRODUCTION 9<br/>1.01 OVERVIEW 9<br/>1.02 CURRENT SCENARIO AND NEED OF STUDY 9<br/>1.04 RESEARCH QUESTIONS 11<br/>1.03 OBJECTIVE OF STUDY 11<br/>1.05 SCOPE OF WORK 11<br/>1.06 RESEARCH METHODOLOGY 11<br/>1.06.01 Literature survey 11<br/>1.06.02. Data collection 11<br/>1.06.03. Data analysis 11<br/>1.07 SCHEDULE 13<br/>1.08 LIMITATIONS 13<br/>CHAPTER 2 LITERATURE REVIEW 14<br/>2.01 COST CONTROL OVERVIEW 14<br/>2.02 PROJECT BUDGET 15<br/>2.03 RESPONSIBILITY CENTERS 15<br/>2.04 COST ESCALATION 16<br/>2.05 MASTER BUDGET 16<br/>2.06 BUDGET MONITORING 17<br/>2.07 BUDGETARY ANALYSIS 17<br/>2.08 BUDGETARY CONTROL 19<br/>2.09 PLANNED SCHEDULE 19<br/>2.10 PLANNED BUDGET 20<br/>2.11 ORGANIZATION CHART 20<br/>2.12 MONTHLY PROGRESS REPORTS 20<br/>2.13 BOQ 21<br/>2.14 CONTRACT DOCUMENT 21<br/>2.15 RA BILLS 21<br/>CHAPTER 3:- DATA COLLECTION 23<br/>3.01 SELECTION CRITERIA FOR CASE STUDY 23<br/>3.02 METHODOLOGY OF DATA COLLECTION 24<br/>3.04 PRIMARY DATA 24<br/>3.04.01 QUESTIONNAIRE SURVEY RESPONSES 25<br/>3.04.02 OPINION SURVEY RESPONSES 30<br/>3.05 SECONDARY DATA 31<br/>CHAPTER 4:- RESEARCH METHODOLOGY 32<br/>4.01 RESEARCH PROCESS 32<br/>4.02 SAMPLE SELECTION 33<br/>CHAPTER 5:- DATA ANALYSIS 34<br/>5.01 DATA ANALYSIS FLOWCHART 34<br/>5.02 PRIMARY DATA ANALYSIS 34<br/>5.02.01 ITEM ANALYSIS 34<br/>5.02.02 AVERAGE RANKING OF SECTION 35<br/>5.02.03 RANK ANALYSIS 36<br/>5.02.04 CRONBACH ALPHA TEST 37<br/>5.02.05 TWO TAILED T-TEST 37<br/>5.03 SECONDARY DATA ANALYSIS 41<br/>5.03.01 EARNED VALUE ANALYSIS 41<br/>5.04 CURRENT COST CONTROL MANAGEMENT SYSTEM 50<br/>5.04.01 COST CONTROL PROCESS FLOWCHART 50<br/>5.04.02 COST CONTROL PROCEDURE: STEP 1 51<br/>5.04.03 COST CONTROL PROCEDURE: STEP 2 52<br/>CHAPTER 6:- CONCLUSION AND RECOMMENDATION 53<br/>6.01 CONCLUSION 53<br/>6.01.01 Current cost control management system 53<br/>6.01.02 Problems identified in executing effective cost control management system 53<br/>6.02 FLAWS IDENTIFIED AND RECOMMENDATIONS 53<br/>Timeliness of response- 53<br/>No use of ERP software – 53<br/>6.04 HYPOTHESIS TESTING 53<br/>6.04.01 HYPOTHESIS 1 53<br/>6.04.02 HYPOTHESIS 2 54<br/>6.04.03 HYPOTHESIS 3 54<br/>6.06 FUTURE SCOPE 54<br/>7 ANNEXURE 55<br/>8.0 REFERENCES 63<br/><br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shah, Snehal (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0754 PUR | 019811 | 22/08/2018 | 22/08/2018 | Thesis |