Vendor selection process adopted by construction Companies (Softcopy is also available) (Record no. 54885)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02144nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0749 |
Item number | PAT |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Patel, Jainik (UC3513) |
245 #0 - TITLE STATEMENT | |
Title | Vendor selection process adopted by construction Companies (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ix,xvi,51p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>1. INTRODUCTION 1<br/>1.01 Background 1<br/>1.02 Need of Study 2<br/>1.03 Objective of Study 2<br/>1.04 Scope of Study 2<br/>1.05 Limitations 2<br/>1.06 Research Methodology 2<br/>1.6.1 Selection of Case Studies 2<br/>1.6.2 Study of Literature and Research Paper 3<br/>1.6.3 Data Collection 3<br/>A Primary Data 3<br/>B Secondary Data 3<br/>1.6.4 Data Analysis 3<br/>1.6.5 Conclusion and Recommendation 3<br/>1.07 Thesis Schedule 4<br/>2. LITERATURE STUDY 5<br/>2.01 Supplier Selection Process: 5<br/>2.02 Supplier selection criteria 6<br/>2.03 Supplier Evaluation Process: 7<br/>3. DATA COLLECTION 12<br/>3.01 Data Collection Methodology 12<br/>3.02 Primary Data 13<br/>3.02.01 Opinion Survey 13<br/>3.02.02 Interview 16<br/>3.03 Secondary Data 18<br/>3.04 Case Study Selection Criteria 20<br/>3.04.01 Company A 21<br/>3.04.02 Company B 26<br/>3.04.03 Company C 29<br/>3.04.03 Company D 31<br/>4. DATA ANALYSIS 32<br/>4.01 Data Analysis Methodology 32<br/>4.02 Primary data analysis 32<br/>4.2.1 Average Score Analysis 32<br/>4.2.2 Time cycle analysis 34<br/>4.2.3 Comparison analysis 34<br/>4.2.4 Evaluation Method Analysis 35<br/>4.2.5 Relative Important Index 36<br/>4.2.6 Current Market Analysis 38<br/>4.2.7 Average Percentage Analysis 39<br/>4.03 Secondary Data Analysis 40<br/>4.3.1 Qualitative analysis of Case studies 40<br/>4.3.2 Criteria from literature v/s criteria from case study 40<br/>5. CONCLUSION & RECOMMENDATION 42<br/>5.01 Conclusion 42<br/>5.01.01 Conclusion from opinion survey 42<br/>5.01.02 Conclusion from case-study 42<br/>5.01.03 List of criterias considered while selection and evaluation of suppliers 43<br/>5.02 Recommendation: A Proposed Model of supplier Process 44<br/>6. FUTURE SCOPE 51<br/>7. APPENDICES xi<br/>A. Opinion Survey Questionnaire xi<br/>B. Interview Questionnaire xv<br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Dave, Manish (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0749 PAT | 019806 | 22/08/2018 | 22/08/2018 | Thesis |