Studying the approval process for real estate projects in Ahmedabad (Also available on CD) (Record no. 54876)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02623nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0740 |
Item number | JET |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Jetly, Meet (UC2313) |
245 #0 - TITLE STATEMENT | |
Title | Studying the approval process for real estate projects in Ahmedabad (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ii,4,x,40.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>ACKNOWLEDGMENT IV<br/>ABSTRACT V<br/>TABLE OF CONTENTS VI<br/>LIST OF TABLES: IX<br/>LIST OF FIGURES: IX<br/>LIST OF CHARTS: IX<br/>LIST OF ABBREVIATIONS: IX<br/>1. INTRODUCTION 1<br/>1.1 BACKGROUND 1<br/>1.2 CURRENT SCENARIO OF THE INDIAN CITIES 1<br/>1.3 NEED FOR THE STUDY 2<br/>1.4 RESEARCH OBJECTIVES 2<br/>1.5 RESEARCH SCOPE 3<br/>1.6 RESEARCH LIMITATIONS 3<br/>1.7 RESEARCH METHODOLOGY 4<br/>1.8 RESEARCH SCHEDULE 4<br/>2. LITERATURE STUDY 5<br/>2.1 CURRENT PROCESS 5<br/>2.2 PAST ATTEMPTS AT STREAMLINING 6<br/>2.3 LEGAL AND REGULATORY FRAMEWORK GOVERNING PROJECTS 7<br/>3. CASE STUDIES- BUILDING PERMIT TIMELINES 9<br/>3.1 CASE STUDY A: AAGAM APPARTMENTS 9<br/>3.1.1 APPROVAL PROCESS TIMELINE: 9<br/>3.1.2 COPIES OF DOCUMENTS, DRAWINGS AND SPECIFICATIONS FOR SECURING DEVELOPMENT PERMISSION 10<br/>3.1.3 LIST OF DRAWINGS 10<br/>3.1.4 PERMISSION FOR USE OF AGRICULTURAL LAND FOR NON-AGRICULTURAL PURPOSES 13<br/>3.1.5 PROJECT PHASE BREAK-UP 15<br/>3.2 CASE STUDY B: SHREE HARI VATIKA -1 16<br/>3.2.1 APPROVAL PROCESS TIMELINE: 16<br/>3.2.2PROJECT PHASE BREAK-UP 17<br/>3.3 CASE STUDY C: ZAHRA 18<br/>3.4 CASE STUDY D: ZODIAC ASTER 19<br/>3.4.1 APPROVAL PROCESS TIMELINE: 19<br/>4. DATA ANALYSIS: ISSUES IDENTIFIED 21<br/>4.1 TIME CONSUMING DELAYS DUE TO VARIOUS REASONS 21<br/>4.2 LACK OF TRANSPARENCY AND PREDICTABILITY IN THE PROCESS 23<br/>4.3 OUT-OF DATE APPROVAL SYSTEM 24<br/>4.4 COMPLEXITY AND LACK OF COORDINATION 24<br/>4.5 ISSUES ACROSS VARIOUS APPROVAL STAGES 25<br/>4.5.1 CONVERSION OF AGRICULTURAL LAND 25<br/>4.5.2 NOC’S FROM VARIOUS GOVERNEMENT AGENCIES 26<br/>5. PRELIMINARY RECOMMENDATIONS 28<br/>5.1 KEY RECOMMENDATIONS ACROSS VARIOUS STAGES AS PER THE SURVEY RESPONSES: 28<br/>5.2 STREAMLINING THE AMBIGUOUS APPROVALS AND IMPROVING COMMUNICATION 28<br/>5.2.1 BENEFITS 29<br/>5.2.2 IMPLEMENTATION 30<br/>5.2.3 BENEFITS 30<br/>5.3 USE OF E-PERMITTING 30<br/>5.3.1 CASE STUDY - SURAT 31<br/>5.3.2 BENEFITS 32<br/>5.3.3 IMPLEMENTATION 32<br/>6. CONCLUSION 33<br/>6.1 IMPROVING THE COMMUNICATION BETWEEN APPLICANT AND REGULATORY AUTHORITY 33<br/>6.2 E-PERMITTING 33<br/>6.3 REVISION AND SIMPLIFICATION OF AMBIGUOUS BYE-LAWS 33<br/>7. APPENDIX 35<br/>7.1 APPENDIX A: SURVEY QUESTIONNAIRE 35<br/>7.1APPENDIX B: CASE STUDY APPROVAL PROCESS DOCUMENTS & FLOW-CHARTS 37<br/>8. ANNEXURE 40<br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shah, Nitesh (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0740 JET | 019797 | 22/08/2018 | 22/08/2018 | Thesis |