Design management for EPC contract (Also available on CD) (Record no. 54871)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 02409nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0735 |
Item number | JOS |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Joshi, Padmadip (UC1713) |
245 #0 - TITLE STATEMENT | |
Title | Design management for EPC contract (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | ii,5,iv,60p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>Chapter 1: Introduction 7<br/>1.1 Introduction 7<br/>1.2 Need 7<br/>1.3 Objective of Study 7<br/>1.4 Scope of Study 8<br/>1.5 Research Methodology 8<br/>1.5.1 Literature Review 8<br/>1.5.2 Data Collection 8<br/>1.5.3 Data Analysis 9<br/>1.6 Research Schedule 9<br/>1.7 Limitations of Study 9<br/>Chapter 2: Literature Review 10<br/>2.1 Introduction to EPC Project 10<br/>2.2 Design 10<br/>2.2.1 Design Scope 11<br/>2.2.2 Design Standards and Specifications 12<br/>2.2.3 Design Approval Process 12<br/>2.2.4 Design Review Process 13<br/>2.2.5 Design Responsibilities 13<br/>2.2.6 As-Built Drawing Submission 13<br/>2.3 Design Management 13<br/>2.3.1 Design Risk Management 14<br/>2.3.2 Design Restrictions 14<br/>2.3.3 Design Failure 14<br/>2.3.4 Design and Construction Integration 14<br/>2.3.5 Design Changes 14<br/>2.3.6 Design Control 15<br/>2.4 Project Work Scope 15<br/>2.4.1 Planning Process 15<br/>2.4.2 Scope Requirement 16<br/>2.4.3 Design Planning 16<br/>2.5 Contractor’s Relation With Project Participants 17<br/>Chapter 3: Data Collection and Findings 18<br/>3.1 Overview 18<br/>3.2 Criteria for Selection of Case Studies 18<br/>3.3 Methodology of Data Collection 19<br/>3.3.1 Primary Data 20<br/>3.3.2 Secondary Data 21<br/>3.4 Case Study Details 21<br/>3.4.1 Scope of Project Participants 21<br/>3.4.2 Case Study 1 21<br/>3.4.3 Case Study 2 25<br/>3.4.4 Case Study 3 28<br/>3.5 Scope of Design Consultant 33<br/>3.6 Design Approval Process 34<br/>Chapter 4: Data Analysis 37<br/>4.1 Methodology 37<br/>4.2 Similarity Variation Analysis 37<br/>4.3 Relative Importance Index 39<br/>4.3.1 Checks 39<br/>4.3.2 RII - Reasons for Design Delays 41<br/>4.4 Drawing Control Index 42<br/>4.4.1 Method to analyse drawing control index 42<br/>4.5 Findings from Questionnaire Survey 44<br/>Chapter 5: Conclusion 45<br/>5.1 Findings from Case Studies 45<br/>5.2 Findings from Questionnaire Survey 46<br/>Chapter 6: Suggestions 47<br/>6.1 Contractor’s Relation with Project Participants 47<br/>6.2 Future Scope of Study 48<br/>References 49<br/>Annexures 51<br/>Annexure 1: Questionnaire Survey 51<br/>Annexure 2: Opinion Survey 60<br/><br/> |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Shah, Reshma (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0735 JOS | 019792 | 22/08/2018 | 22/08/2018 | Thesis |