Economic appraisal of metro project (Also available on CD) (Record no. 54865)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 01895nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180822s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0729 |
Item number | DAG |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Dagli, Rahul (UC0913) |
245 #0 - TITLE STATEMENT | |
Title | Economic appraisal of metro project (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | A,xiii,44p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS<br/>1. Introduction 5<br/>1.1 Background 5<br/>1.2 Need for study 5<br/>1.3 Objectives of Study 6<br/>1.4 Scope 6<br/>1.5 Research Methodology 6<br/>1.6 Research Schedule 7<br/>2 Literature Review. 8<br/>2.1 Overview of Metro Rail Projects in India 8<br/>2.2 Introduction to Project appraisal 8<br/>2.3 Appraisal Methodology for Metro Project 9<br/>2.4 Economic Appraisal 13<br/>2.5 Inaccuracy of Forecasts 14<br/>3 Data Collection 15<br/>3.1 Overview 15<br/>3.2 Case Study Selection 15<br/>3.3 Data Collection Methodology 16<br/>3.3.1 Primary Data 16<br/>3.3.2 Secondary Data 17<br/>3.4 Case Study 17<br/>3.4.1 Cost overrun in Metro Projects 18<br/>3.4.2 Achieved Ridership in Metro Projects 19<br/>4 Data Analysis 20<br/>4.1 Trend line analysis 20<br/>4.2 Reference cast forecasting 21<br/>4.2.1 Distribution of Cost Overrun 22<br/>4.2.2 Uplift factor for cost overrun 22<br/>4.2.3 Distribution of Ridership Forecasts 23<br/> 4.3 findings from Questionnaire survey 24<br/>5 Economic Appraisal of Ahmedabad Metro 26<br/>5.1 Selection of Uplift Factor for cost estimate 26<br/>5.2 Completion cost 26<br/>5.3 Correction factor for ridership forecast 28<br/>5.4 Economic Benefits 29<br/>5.4.1 Variables for benefits 29<br/>5.4.2 Calculation of Benefits 31<br/>5.4.3 Economic benefits from ahmedabad metro 32<br/>5.5 Economic analysis of ahmedabad Metro 35<br/>5.5.1 Economic conversion factor 35<br/>5.5.2 Benefit cost ratio 35<br/>5.6 Operation of Ahmedabad Metro 36<br/>6 Conclusion 38<br/>7 Recommendations 39<br/>8 Future scope 39<br/>9 Bibliography 40<br/>10 Appendix 42 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Patel, Rajnikant (Guide) |
890 ## - Country | |
Country | India |
891 ## - Topic | |
Topic | 2013 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Faculty of Technology | CEPT Library | CEPT Library | 22/08/2018 | Faculty of Technology | B TH-0729 DAG | 019786 | 22/08/2018 | 22/08/2018 | Thesis |