Station accessibility plan for Ahmedabad metro station (Softcopy is also available) (Record no. 53447)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03917nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180517s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | MIED TH-0099 |
Item number | TAV |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Tavleen, Jassal |
245 #0 - TITLE STATEMENT | |
Title | Station accessibility plan for Ahmedabad metro station (Softcopy is also available) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2017 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xiv,108p. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS Acknowledgements viii Abstract ix List of Figures x List of Tables xiv 1. Introduction 1 1.1 About Ahmedabad Metro Project 1 1.2 Need of Study 2 1.3 Aim 2 1.4 Objective. 2 1.5 Methodology 2 1.6 Scope and Limitation 4 2. Stations to be studied 5 2.1 Selection Criteria 5 2.2 Selection Matrix 6 2.3 Finalised Stations 9 2.4 Station Area Boundary 9 2.4.1 Methodology 9 2.4.2 Vadaj- Study Area 10 2.4.3 Paldi- Study Area 10 3. Literature Review 11 3.1 Station Accessibility Plan, Indiranagar Metro Station, Bengaluru 12 3.1.1 Why Indiranagar Metro Station? 12 3.1.2 Methodology adopted 13 3.1.3 Components identified 14 3.1.4 Data Collection 15 3.1.5 Structure to Data Analysis 15 3.1.6 Analysis Methodology 16 3.1.7 Proposals 16 3.1.8 Phase I – Immediate Implementation 17 3.1.9 Phase II- Implementation after 5 Years 18 3.1.10 Phase III- Implementation after 10 years 18 3.2 Road Safety Audit of Mumbai Metro Rail Corridor 20 3.2.1 Why Mumbai Metro Audit Report? 20 3.2.2 Structure of Report 20 3.2.3 General Issues and Recommendations 21 3.2.4 Specific Issues and Recommendations 22 3.3 Learnings from Cases of Hong Kong, Munich and Mumbai 23 3.3.1 Hong Kong’s Skywalk System 23 3.3.2 Munich’s Subway System . 24 3.3.3 Mumbai’s Subway System 24 3.4 Urban Street Design Guidelines, Pune 24 3.4.1 Why Urban Street Design Guidelines, Pune? 25 3.4.2 Methodology 25 3.4.3 Street Hierarchy 26 3.4.4 Process for Designing Urban Streets 27 3.4.5 Road Inventory 28 3.4.6 Surveys 28 3.4.7 Design Guidelines 28 3.5 Street Design Guidelines, DDA 30 3.5.1 Design Guidelines 31 4. Data Collection 33 5. Analysis 34 5.1 Vadaj 34 5.1.1 Characteristics 35 5.1.2 Existing Issues 36 5.1.3 Trip Generators/ Attractors 37 5.1.4 Existing Built use 38 5.1.5 Vacant Land and Ownership 39 5.1.6 Existing ROW 40 5.1.7 Road Inventory 41 5.1.8 Existing Road Conditions 44 5.1.9 Street Rating Map 47 5.1.10 Accessibility Survey 48 5.1.10.1 Pedestrian Accessibility 48 5.1.10.2 Bicycle Accessibility 49 5.1.10.3 IPT Accessibility 50 5.1.11 Opinion Survey 51 5.1.11.1 Problems faced by Pedestrians 51 5.1.11.2 Problems faced by Cyclists 52 5.2 Paldi 53 5.2.1 Characteristics 54 5.2.2 Existing Issues 55 5.2.3 Trip Generators/ Attractors 56 5.2.4 Existing Built use 57 5.2.5 Vacant Land and Ownership 58 5.2.6 Existing ROW 59 5.2.7 Road Inventory 60 5.2.8 Existing Road Conditions 62 5.2.9 Street Rating Map 64 5.2.10 Accessibility Survey 65 5.2.10.1 Pedestrian Accessibility 65 5.2.10.2 Bicycle Accessibility 66 5.2.10.3 IPT Accessibility 67 5.2.11 Opinion Survey 68 5.2.11.1 Problems faced by Pedestrians 68 5.2.11.2 Problems faced by Cyclists 69 5.3 Summary 70 6. Proposals 71 6.1 Proposed Auto Stand Locations 71 6.1.1 Vadaj Proposed Auto Stand Locations 71 6.1.2 Paldi Proposed Auto Stand Locations 72 6.2 Proposed NMT network 73 6.2.1 Proposed Bicycle Network for Vadaj 74 6.2.2 Proposed Bicycle Network for Paldi 75 6.3 Standard Road Sections 76 6.3.1 Vadaj Standard Road Sections 76 6.3.2 Paldi Standard Road Sections 81 6.4 Detailed Street Design 84 6.4.1 Vadaj detailed street design 85 6.4.1.1 Design Interventions 86 6.4.1.2 Redesign of Junctions 89 6.4.2 Paldi Detailed Street Design 91 6.4.2.1 Design Interventions 92 6.4.2.2 Redesign of Junctions 96 6.5 Comparison of existing and proposed design 97 6.5.1 Vadaj . 97 6.5.2 Paldi 98 References 99 Annexures. 100 |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Adhvaryu, Bhargav (Guide) |
891 ## - Topic | |
Topic | 2015 Batch |
891 ## - Topic | |
Topic | FT-PG |
891 ## - Topic | |
Topic | Infrastructure Engineering Design |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Faculty of Technology | CEPT Library | CEPT Library | 13/10/2017 | Faculty of Technology | MIED TH-0099 TAV | 018468 | 18/05/2018 | 18/05/2018 | Thesis |