Resource optimisation of precast yard of metro rail projects (Record no. 52747)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 00650nam a2200157Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180516s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | B TH-0720 |
Item number | CHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Chavda, Devang |
245 #0 - TITLE STATEMENT | |
Title | Resource optimisation of precast yard of metro rail projects |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2017 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vii,49,vp. |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS CHAPTER 1. INTRODUCTION 1 1.1 Background of the Study 1 1.2 Need for study . 1 1.3 Research Objective 2 1.4 Scope of study . 2 1.5 Limitation of study . 2 1.6 Research Signific |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Pandit, Devanshu (Guide) |
891 ## - Topic | |
Topic | 2010 Batch |
891 ## - Topic | |
Topic | FT-UG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Faculty of Technology | CEPT Library | CEPT Library | 13/10/2017 | Faculty of Technology | B TH-0720 CHA | 018585 | 18/05/2018 | 18/05/2018 | Thesis |