Perceived challenges in achieving 24x7 water supply system in Ahmedabad city (Also available on CD) (Record no. 52084)

MARC details
000 -LEADER
fixed length control field 02837nam a2200157Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180516s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number P TH-1993
Item number BAG
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Baghel, Snigdha
245 #0 - TITLE STATEMENT
Title Perceived challenges in achieving 24x7 water supply system in Ahmedabad city (Also available on CD)
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Date of publication, distribution, etc 2016
300 ## - PHYSICAL DESCRIPTION
Extent iv, 90p., CD-ROM
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENTS Abbreviations' 9 Executive Summary 11 Introduction & Need For The Study 11 Objectives, Approach And Methodology . 11 Major Findings . 12 Chapter 1 - Introduction & Rationale 14 1.1 Water Consumption And Water Metering 15 1.1 Need For The Study 18 Chapter 2 - Literature Review 19 2.1 Urban Water Supply Sector 22 2.2 Service Level Benchmark (Slb) 23 2.3.1 Water Supply Services . 23 2.3 Types Of Water Supply Systems 25 2.3.1 Intermittent Water Supply System . 25 2.3.1.1 Disadvantages Of Intermittent Water Supply System 26 2.3.2 24x7 Water Supply System 27 2.3.2.1 Advantages Of 24x7 Water Supply System . 28 2.4 Learning's From Literature Reviews . 30 Chapter 3 - Approach & Methodology . 31 3.1 Research Question 31 3.2 Objectives . 31 3.3 Approach 31 3.4 Methodology . 33 3.4.1 Survey Of Residents - Hh Level Questionnaire 34 3.4.2 Interviews/Discussions With Private Consultant's 34 3.4.3 Interviews/Discussions With Urban Local Body . 35 Perceived Challenges In Achieving 24x7 Water Supply System In Ahmedabad City Snigdha Baghel (Up0312) 6 3.4.4 Interview With Subject Matter Experts 36 3.5 Site Selection . 36 Chapter 4 - Study Area . 38 4.1 Basic Profiling . 38 4.2 Water Project And Production Department, Ahmedabad 43 Chapter 5 - Analysis & Findings . 49 5.1 Analytical Findings From Survey Of Residents . 49 5.2 Analytical Findings From Discussions With Domain Experts & Private Consultants . 53 5.2.1 Technical Data Required For Implementation 54 5.3 Analytical Findings From The Case Studies . 57 5.3.1 24x7 Water Supply System In Nagpur 57 5.3.2 24x7 Water Supply System Of Malkapur 64 5.3.3 24x7 Water Supply System Of South Goa . 66 5.3.4 24x7 Water Supply System At A Society Level . 68 5.3.4.1 A Case Study Of Navdeep Apartment, Memnagar, Ahmedabad . 68 5.3.4.2 A Case Study Of Vishwas City-2 Society, Shayona City, Ahmedabad . 69 5.3.5 Learning's From Case Studies 71 5.4 Major Findings . 72 Chapter 6 - Conclusion . 74 Bibliography 77 Annexes 80 Annexure 1: Questionnaire For The Residents Of Ahmedabad 80 Annexure 2: Questionnaire For The Engineers Of Urban Local Body Of Ahmedabad. 83 Annexure 3: Questionnaire For The Engineers At Tata Consulting Engineers Ltd. (Tce) 85 Annexure 4: List Of People With Whom Interviews / Discussions Were Conducted 88
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Goswami, Subhrangsu (Guide)
891 ## - Topic
Topic 2012 Batch
891 ## - Topic
Topic FP-UG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
        Faculty of Planning   CEPT Library CEPT Library 06/03/2016 Faculty of Planning P TH-1993 BAG 015992 18/05/2018 18/05/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials