Collection of e- waste through authorised channel in ahmedabad: challenges and way forwad (Also available on CD) (Record no. 51834)

MARC details
000 -LEADER
fixed length control field 01927nam a2200157Ia 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 180516s9999||||xx |||||||||||||| ||und||
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number P TH-1743
Item number PUR
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Purani, Aanal
245 #0 - TITLE STATEMENT
Title Collection of e- waste through authorised channel in ahmedabad: challenges and way forwad (Also available on CD)
300 ## - PHYSICAL DESCRIPTION
Extent xiii,66p.,CD-ROM
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note CONTENT I. INTRODUCTION 1.1 Background 1 1.2 What is E-waste 1 1.3 Composition of e-waste 7 1.4 Impacts of E-waste 7 1.5 E-waste Scenario 9 1.5.1 Global E-waste Scenario 9 Japan 10 South Korea 11 Taiwan 12 1.5.2 The Indian Scenario 15 1.6 Scenario in Ahmedabad 18 1.6.1 Current status of collection, handling and processing of e-waste 19 1.7 Need Of Study 20 1.8 Aim 20 1.9 Objectives 20 1.10 Scope 20 1.11 Limitations 21 1.12 Methodology 21 1.13 Research Questions 23 II. LITERATURE REVIEW 2.1 Characteristics of E-waste 24 2.2 Hazards of e-waste 24 2.3 Stakeholders of E-waste 25 2.4 Electronic waste and Environmental legislation in India 27 2.4.1 Issues with current legislation 28 2.5 Case study overview: E-waste scenario in Mumbai-Chinchwad Region 29 III.SITUATION ANALYSIS 3.1 Sources of E-waste 33 3.2 Issues of e-waste management in Ahmedabad 33 3.3 Supply chain of E-waste 34 3.4 E-waste inventory for Ahmedabad 35 3.4.1 Inventory summary 36 3.5 Strengths and weaknesses of informal e-waste recyclers 41 3.6 Strengths and weaknesses of formal e-waste recyclers 43 3.7 Size and nature of e-waste in the informal sector 46 3.8 Financial scenario of informal recyclers 48 IV. CONCLUSION V. SUGGESTIONS AND PROPOSED MODEL Discussion on “SWACH” Model 53 Proposed “ECCU” Model 55 5.1 Advantages and challenges of the proposed model 59 Advantages 59 Challenges 59 VI. WAY FORWARD 61 VII. REFERNECES 62 ANNEXURE I 64-66
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Kumar, Ashwani (Guide)
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Pandya, Prashant (Guide)
891 ## - Topic
Topic 2012 Batch
891 ## - Topic
Topic FP-PG
Holdings
Withdrawn status Lost status Damaged status Not for loan Collection code Withdrawn status Home library Current library Date acquired Source of acquisition Full call number Barcode Date last seen Price effective from Koha item type
        Faculty of Planning   CEPT Library CEPT Library 18/10/2014 Faculty of Planning P TH-1743 PUR 013074 18/05/2018 18/05/2018 Thesis
Excel To HTML using codebeautify.org Sheet Name :- Location Chart
Location Chart Basement 1 (B1) Class No. 600 - 649, 660 - 699
(B1) :Mezzanine 1 Class No. 700 - 728
(B1) :Mezzanine 2 Class No. 728.1 - 799, 650 - 659, Reference Books, Faculty work
Basement 2 (B2) Class No. 000 - 599, 800-999
Basement 3 (B3) (Please Inquire at the Counter for resources) Theses, Students' works, Bound Journals, Drawings, Atlas, Oversize Books, Rare Books, IS codes, Non-book Materials