Issues in automation while implementing ERP in a contractor organization (Also available on CD) (Record no. 50839)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 00733nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180516s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0261 |
Item number | SIN |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Singh, Megha |
245 #0 - TITLE STATEMENT | |
Title | Issues in automation while implementing ERP in a contractor organization (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2014 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | x,92p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENTS Chapter 1: Introduction . 2 1.1 Introduction 2 1.2 Need For Study . 2 1.3 Objective . 3 1.4 Scope 3 Chapter 2: Literature Review . 5 2.0 Introduction 5 2.1 History And Review 6 2.2 Erp Systems 7 2.2.1 Erp Merits And Demer |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Oza, Ashvin (Guide) |
891 ## - Topic | |
Topic | 2012 Batch |
891 ## - Topic | |
Topic | Construction and Planning Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Faculty of Technology | CEPT Library | CEPT Library | 20/07/2016 | Faculty of Technology | CPM TH-0261 SIN | 016318 | 18/05/2018 | 18/05/2018 | Thesis |