Development of integrated lean project delivery model for highway projects (Also available on CD) (Record no. 50816)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 00762nam a2200169Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180516s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0238 |
Item number | MAN |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Mangrola, Mahavirsinh |
245 #0 - TITLE STATEMENT | |
Title | Development of integrated lean project delivery model for highway projects (Also available on CD) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2013 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | vi,65p.,CD-ROM |
505 ## - FORMATTED CONTENTS NOTE | |
Formatted contents note | CONTENT Chapter 1 – Introduction 1 Introduction 2 Need for study 2 Objective 3 Scope 3 Methodology 3 Research plan 4 Reader’s guide 4 Chapter 2 – Literature review 5 Introduction 6 Integrated project delivery 6 Integrated project deliver |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Sarkar, Debasis (Guide) |
891 ## - Topic | |
Topic | 2011 Batch |
891 ## - Topic | |
Topic | Construction and Planning Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Faculty of Technology | CEPT Library | CEPT Library | 16/11/2014 | Faculty of Technology | CPM TH-0238 MAN | 012645 | 18/05/2018 | 18/05/2018 | Thesis |