Equipment productivity analysis of Bharuch - Surat road project (NH-8) (Record no. 50732)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 00460nam a2200157Ia 4500 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 180516s9999||||xx |||||||||||||| ||und|| |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | CPM TH-0154 |
Item number | CHA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Chauhan, Dhiren |
245 #0 - TITLE STATEMENT | |
Title | Equipment productivity analysis of Bharuch - Surat road project (NH-8) |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Date of publication, distribution, etc | 2008 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xi,96,xxiiip. |
700 ## - ADDED ENTRY--PERSONAL NAME | |
Personal name | Akalkotkar, Prakash V. (Guide) |
891 ## - Topic | |
Topic | 2002 Batch |
891 ## - Topic | |
Topic | Construction and Project Management |
891 ## - Topic | |
Topic | FT-PG |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Withdrawn status | Home library | Current library | Date acquired | Source of acquisition | Full call number | Barcode | Date last seen | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Faculty of Technology | CEPT Library | CEPT Library | 16/12/2008 | Faculty of Technology | CPM TH-0154 CHA | 004078 | 18/05/2018 | 18/05/2018 | Thesis |