City development plan Amritsar - 2025 : under Jawaharlal Nehru National Urban Renewal Mission (JNNURM) government of India (Record no. 5041)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 05609nam a2200145Ia 4500 |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Classification number | 307.76 |
Item number | MCA |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Municipal Corporation Amritsar |
245 ## - TITLE STATEMENT | |
Title | City development plan Amritsar - 2025 : under Jawaharlal Nehru National Urban Renewal Mission (JNNURM) government of India |
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT) | |
Place of publication, distribution, etc. | Amritsar |
Name of publisher, distributor, etc. | Municipal Corporation |
Date of publication, distribution, etc. | 2006 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | i,viii,148p. |
500 ## - GENERAL NOTE | |
General note | INDEX a} List of Contents. (i)- (iii) b) List of Tables. (iv) - (v) c) List of Maps (v) d) List of Figures (v) e) List of Annexures (vi) f) Abbreviations (vi)- (viii) 1. PROJECT BACKGROUND 1-1 1.1 PROJECT BACKGROUND 1.2 AIMS OBJECTIVE1-1 1.3 SCOPE OF WORK1-1 1.4 STRATEGY OF THE MISSION 1-2 1.5 CITY DEVELOPMENT PLANNING PROCESS 1-2 1.6 CITYCONSULTATIONS. 1-3 2. CITY PROFILE 2-1 2.1 INTRODUCTION 2-1 2.2 HISTORICAL BACKGROUND2-1 2.3 REGIONALSETTING 2-2 2.3.1 GEOGRAPHICAL LOCATION2-2 2.3.2 PHYSIOGRAPHY.2-2 2.4 PHYSICAL GROWTH OF CITY 2-3 2.4.1 MASTER PLAN. 2-4 2.4.2 EXISTING LANDUSE PATTERN 2-4 2.5 DEMOGRAPHIC PATTERN. 2-6 2.5.1 POPULATION GROWTH 2-6 2.5.2 POPULATION DENSITY 2-7 2.6. ECONOMIC BASE 2-7 2.6.1INTRODUCTION2-7 2.6.2 WORK FORCE PARTICIPATION2-7 2.6.3TRADE AND COMMERCE 2- 8 2.6.4INDUSTRIES 2-9 2.6.5 HERITAGE RESOURCES 2- 10 2.6.6OTHER AMENITIES 2-10 2.7 POPULATION FORECAST2-10 2.8 ISSUES 2-11 3. HERITAGE AND TOURISM RESOURCES 3-1 3.1 INTRODUCTION 3-1 3.2 GOLDEN TEMPLE-THE SPIRITUAL CORE 3-2 3.3 RICH SIKH ARCHITECTURE3-3 3.4 THE WORSHIP PLACE3-3 3.4.1 THE SHAPES. 3-3 3.4.2 THE GUMBAD3-3 3.4.3 THE MATERIAL 3-4 3.4.4 THE SACRED WATER. 3-4 3.4.5 BLEND OF ARCHITECTURE 3-4 3.4.6 THE FLOATING STYLE 3-4 3.5OTHER HERITAGE SITES. 3-5 3.6TOURISM IN PUNJAB. 3-7 3.7TOURISM IN AMR1TSAR 3-7 3.7.1 PLACES OF TOURISTS INTERESTS WITHIN THE CITY 3-7 3.7.2 TOURIST PLACES AROUND AMRITSAR 3-9 3.7.3 CULTURES-CRAFTS. 3-10 3.7.4 TOURIST CIRCUITS3-- 11 3.7.5 EXISTING TOURIST TREND IN AMRITSAR3-11 3.7.6 AVAILABILITY OF TOURIST ACCOMMODATION IN AMRITSAR3-12 3.7.7 ACCESSIBILITY AND CONNECTIVITY 3-12 3.8 ISSUES 3-12 4 ENVIRONMENTAL SERVICES4-1 4.1 INTRODUCTION4-1 4.2WATER SUPPLY SYSTEM. 4-1 4.3WASTE WATER MANAGEMENT SYSTE4-6 4.4 STORM WATER DRAINAGE 4-8 4.5 SOLIDWASTE MANAGEMENT 4-9 4.6 HEALTH INDICATORS, 4-12 4.7WILLINGNESS TO PAY 4-13 4.8 SUMMARY 4-13 5 TRAFFIC & TRANSPORTATION 5-1 5.1 INTRODUCTION 5-1 5.2TRANSPORT SYSTEM 5-1 5.2.1 ROAD 5-1 5.2.2 RAILWAY 5-2 5.2.3 AIRPORT 5-2 5.3TRANSPORTATION NETWORK5-2 5.3.1 CONDITION OF ROAD 5-3 5.3.2 RIGHT - OF - WAY 5-3 5.3.3 STREET LIGHTS 5-3 5.3.4 VEHICLES ON ROAD5-- 3 5.3.5 ROAD ACCIDENTS. 5-4 5.3.6 PUBLIC MASS TRANSPORT 5-5 5.4 TRAFFIC CHARACTERISTICS. 5-5 5.4.1 SPEED AND DELAY CHARACTERISTICS 5-5 5.4.2 PARKING CHARACTERISTICS 5-5 5.5 ISSUES5-6 6HOUSING & SERVICES FOR URBAN POOR6-1 6.1 INTRODUCTION 6-1 6.2 URBAN POOR. 6-1 6.3 URBAN POOR HOUISNG. 6-1 6.3.1 PLOT SIZE6-3 6.3.2 OWNERSHIP STATUS 3.7 PLACES OF TOURISTS INTERESTS WITHIN THE CITY 3-7 3.7.2 TOURIST PLACES AROUND AMRITSAR 3-9 3.7.3 CULTURES-CRAFTS 3-10 3.7.4 TOURIST CIRCUITS3-11 3.7.5 EXISTING TOURIST TREND IN AMRITSAR. 3-11 3.7.6 AVAILABILITY OF TOURIST ACCOMMODATION IN AMRITSAR3-12 3.7.7 ACCESSIBILITY AND CONNECTIVITY 3-12 3.8 ISSUES3-12 4: ENVIRONMENTAL SERVICES 4-1 4.1 INTRODUCTION 4-1 4.2WATER SUPPLY SYSTEM 4-1 4.3WASTE WATER MANAGEMENT SYSTEM 4-6 4.4 STORM WATER DRAINAGE 4-8 4.5 SOLIDWASTE MANAGEMENT 4-9 4.6 HEALTH INDICATORS, 4-12 4.7WILLINGNESS TO PAY 4-13 4.8 SUMMARY.4-13 5: TRAFFIC & TRANSPORTATION5-1 5.1 INTRODUCTION 5-1 5.2TRANSPORT SYSTEM5-1 5.2.1 ROAD5-1 5.2.2 RAILWAY 5-2 5.2.3 AIRPORT 5-2 5.3TRANSPORTATION NETWORK 5-2 5.3.1 CONDITION OF ROAD5-3 5.3.2 RIGHT - OF - WAY5-3 5.3.3 STREET LIGHTS. 5-3 5.3.4 VEHICLES ON ROAD 5-3 5.3.5 ROAD ACCIDENTS5-4 5.3.6 PUBLIC MASS TRANSPORT 5-5 5.4 TRAFFIC CHARACTERISTICS5-5 5.4.1 SPEED AND DELAY CHARACTERISTICS 5-5 5.4.2 PARKING CHARACTERISTICS5-5 5.5 ISSUES 5-6 6: HOUSING & SERVICES FOR URBAN POOR 6-1 6.1 INTRODUCTION. 6-1 6.2 URBAN POOR6-1 6.3 URBAN POOR HOUISNG 6-1 6.3.1 PLOT SIZE6-3 6.3.2 OWNERSHIP STATUS 6-4 6.3.3 HOUSING AFFORDAB1LITY 6-4 6.4 BASIC SERVICES: ACCESS AND NEEDS6-4 6.5 HOUSES FOR URBAN POORS UNDER VAMBAY SCHEME 6-5 6.6 ISSUES OF URBAN POOR 6-5 7. INSTITUTIONAL FRAMEWORK 7-1 7.1 INTRODUCTION 7-1 7.2 MUNICIPAL CORPORATION AMRITSAR (MCA)7-1 7.2.1FUNCTIONS OF THE CORPORATION 7-1 7.2.2 ORGANISATIONAL STRUCTURE 7-3 7.3 74TH CONSTITUTION AMENDMENTS' ACT 7-4 7.3.1SERVICE DELIVERY ARRANGEMENTS 7-5 7.3.2 PRIVATE PARTICIPATION IN URBAN SERVICES DELIVERY7-5 7.4 RECENT MANAGEMENT REFORMS7-6 7.5 ISSUES 7-6 8 URBAN FINANCES 8-1 8.1 INTRODUCTION8-1 8.2 OVERVIEW OF MUNICIPAL FINANCES 8-1 8.3 REVENUE ACCOUNT 8-4 8.3.1 SOURCES OF FUND - REVENUE INCOME8-4 8.3.2 OWN SOURCES8-6 8.3.3 REVENUE ACCOUNT EXPENDITURE 8-8 8.3.4 STATUS OF REVENUE ACCOUNT8-9 8.4 CAPITAL ACCOUNT8-9 8.4.1 CAPITAL INCOME 8-10 8.4.2 CAPITAL EXPENDITURE8-10 8.5 OUTSTANDING LIABILITIES8-11 8.6 KEY FINANCIAL INDICATORS 8-11 8.7 CONCLUSION 9-1 9.1 INTRODUCTION 9-1 9.2 SWOT ANALYSIS 9-1 9.3VISION AMRITSAR 20259-2 9.4 OVERALL INVESTMENT PLAN9-3 9.5 SECTORAL VISION. NEEDS, STRATEGIES AND PRIORITIES 9-3 9.5.1 SUSTAINABLE ECONOMIC DEVELOPMENT 9-4 9.5.2 PLANNED CITY GROWTH 9-7 9.5.3 INTEGRATED INFRASTRUCTURE DEVELOPMENT9-8 9.6 ENVIRONMENTAL SERVICES NEED ASSESSMENT 9-9 9.6.2 URBAN POOR & HOUSING9-15 9.6.3 EFFICIENT AND RESPONSIVE MUNICIPAL CORPORATION 9-16 CHAPTER 10. FINANC1NG STRATEGIES 10.1 INTRODUCTION 10-1 10.2 FINANCIAL OPERATING PLAN 10-1 |
890 ## - COUNTRY | |
-- | India |
891 ## - TOPIC | |
-- | GRATIS |
Withdrawn status | Lost status | Damaged status | Not for loan | Collection code | Home library | Current library | Date acquired | Total Checkouts | Full call number | Barcode | Date last seen | Date checked out | Price effective from | Koha item type | Public note |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CEPT Library | CEPT Library | 04/08/2009 | 1 | 307.76 MCA | 005323 | 03/03/2017 | 16/02/2017 | 30/08/2013 | Book | Status:Catalogued |